Jack Faucette Associates, Revision of Control Cost analysis for Non-Utility Sources for Proposed Short-Term Sulfur Dioxide National Ambient Air Quality Standard Regulatory Impact Analysis. Work Assignment #5, Contract #68D10141, November 8, 1993. [A-84-25-IV-A-5]
Other documents for the same rulemaking
References: 11 extracted, 0 linked to papers
AGA, 1988 American Gas Association, National Fuel Gas Code [1988].
DOE, 1990 U.S. Department of Energy. Assessment of Costs and Benefits of Flexible and Alternative Fuel Use in the U.S. Transportation Sector Technical Report Four: Vehicle and Fuel Distribution Requirements [August 1990].
DOE/EIA, 1992 Energy Information Administration, U.S. Department of Energy. Annual
Energy Review. 1991 [June 1992]. DOE/EIA, 1993a Energy Information Administration, U.S. Department of Energy. Annual
Energy Outlook. 1993 [January, 1993]. DOE/EIA, 1993b Energy Information Administration, U.S. Department of Energy. State Energy Price and Expenditure Report [September, 1993].
EA, 1991 EA Mueller. Assessment of Natural Gas Infrastructure for Transportation Use prepared for Oak Ridge National Laboratory [March, 1991].
ICAC, 1990 Institute of Clean Air Companies, Inc. White Paper: Scrubber Myths and Realities [January, 1992].
MEANS, 1988a R.S. Means Company, Inc. Means Building Construction Cost Data. 1988 46th Annual Edition, [1988].
MEANS, 1988b R.S. Means Company, Inc. Means Mechanical Cost Data. 1988 11th Annual Edition, [1988].
PEN, 1990 Atlas of Natural Gas Pipelines ofthe United States and Canada. Penwell
Maps, [1990]. P.43 Appendix A Appendix A: Costs, Emission Reductions, and Cost Effectiveness of S 0 2 Emission Control Strategies by Two-digit SIC Industry, 1991 Prices (in 1991 dollars) Type of Accessi- Number of Fuel bility Boilers Strategy 1 Baseline Cost Cost of Natural Gas Cost of Least between Baseline between Baseline between Strategy 1 Reduction of of S 0 2 Removed Cost Strategy and Strategy 1 and Strategy 2 and Strategy 2 Strategy 1 Strategy 1 Reduction of of S02 Removed Strategy 2 Strategy 2 Unidentified Coal $57,976,153 $83,125,240 $68,038,399 S25.149,086 $10,062,246 (S15,086,840) 29,814 $844 27,104 $371 Unidentified Distillate Unidentified Residual $79,660 $40,700 $40,700 (S38.960) $6,448,218 $4,773,794 56,448,218 S3,910,611 ($6,221,649) ($13,118) ($3,377) 1,843 ($13,118) $12,669,866 $586 $586 5131,579,633 $1,445,311 S290 $582,128