{"document":{"doc_id":7786,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Test Procedure Interim Waiver Process","date":"2019-05-01","url":"https://www.federalregister.gov/documents/2019/05/01/2019-08699/test-procedure-interim-waiver-process","source_native_id":"2019-08699","status":"fetched","abstract":"The U.S. Department of Energy (DOE) proposes to streamline its test procedure waiver decision-making process to require the Department to notify, in writing, an applicant for an interim waiver of the disposition of the request within 30 business days of receipt of the application. Should DOE fail to satisfy this requirement, the request for interim waiver would be deemed granted based on the criteria in DOE regulations. Specifically, DOE regulations require that DOE grant an interim waiver if it determines that it is desirable for public policy reasons to grant immediate relief pending a determination of the petition for waiver. An interim waiver would remain in effect until a waiver decision is published or until DOE publishes a new or amended test procedure that addresses the issues presented in the application, whichever is earlier. This proposal is intended to address delays in DOE's current process for considering requests for interim waivers and waivers from the DOE test method, which in turn can result in significant delays for manufacturers in bringing new and innovative products to market.","action":"Notice of proposed rulemaking; request for comment."},"dockets":["EERE-2019-BT-NOA-0011"],"rins":["RIN 1904-AE24"],"related":[{"doc_id":299363,"source":"docket_item","org":"EERE","doc_type":"other","title":"2019-05-15  DOE response to letter requesting a public meeting on the test procedure interim waiver proposed rule","date":"2019-05-16"},{"doc_id":299359,"source":"docket_item","org":"EERE","doc_type":"other","title":"2019-05-22  DOE response to letter requesting a webinar on the test procedure interim waiver proposed rule","date":"2019-05-23"},{"doc_id":7672,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Test Procedure Interim Waiver Process","date":"2019-06-26"},{"doc_id":299298,"source":"docket_item","org":"EERE","doc_type":"other","title":"Frequently Asked Questions - Notice of Proposed Rulemaking pertaining to the Test Procedure Interim Waiver Process","date":"2019-07-12"},{"doc_id":299295,"source":"docket_item","org":"EERE","doc_type":"other","title":"DOE notes of teleconference between DOE and representative of SBA Office of Advocacy","date":"2019-07-16"},{"doc_id":299296,"source":"docket_item","org":"EERE","doc_type":"other","title":"DOE Test Procedure Waiver PR Roundtable Attendees 6.26.19","date":"2019-07-16"},{"doc_id":7640,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Test Procedure Interim Waiver Process","date":"2019-07-22"},{"doc_id":305250,"source":"docket_item","org":"EERE","doc_type":"correspondence","title":"2019-07-11  Transcript:  Webinar Test Procedure Interim Waiver Process U.S. Dept. of Energy","date":"2019-07-22"},{"doc_id":6389,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Rule","title":"Test Procedure Interim Waiver Process","date":"2020-12-11"},{"doc_id":128924,"source":"docket_item","org":"EERE","doc_type":"review_record","title":"Documentation of Changes between the draft Final Rule submitted to the Office of Information and Regulatory Affairs (OIRA) and the issued Final Rule","date":"2020-12-17"},{"doc_id":5853,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Test Procedure Interim Waiver Process","date":"2021-08-20"},{"doc_id":6075,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Rule","title":"Test Procedure Interim Waiver Process","date":"2021-12-14"}],"references":[{"citation_id":36159,"raw_reference":"Compliance Certification Database, https://www.regulations.doe.gov/certification-data/#q=Product_Group_s%3A*","cited_authors":"U.S. Department of Energy","cited_year":null,"cited_title":"Compliance Certification Database","cited_venue":"U.S. Department of Energy","cited_doi":null,"cited_url":"https://www.regulations.doe.gov/certification-data/#q=Product_Group_s%3A*","ref_kind":"dataset","section":"fn 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":36160,"raw_reference":"A full list of petitions for interim waiver can be accessed at https://www.energy.gov/eere/buildings/current-test-procedure-waivers.","cited_authors":"U.S. Department of Energy","cited_year":null,"cited_title":"Current test procedure waivers","cited_venue":"U.S. Department of Energy","cited_doi":null,"cited_url":"https://www.energy.gov/eere/buildings/current-test-procedure-waivers","ref_kind":"dataset","section":"Section III (Discussion of Data), Monetization of Delay (National Cost Savings and Foregone Benefits)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}