{"document":{"doc_id":77564,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category-Deadline Extensions","date":"2025-12-31","url":"https://www.federalregister.gov/documents/2025/12/31/2025-24102/effluent-limitations-guidelines-and-standards-for-the-steam-electric-power-generating-point-source","source_native_id":"2025-24102","status":"fetched","abstract":"The U.S. Environmental Protection Agency (the EPA or Agency) is finalizing a Clean Water Act (CWA) rule to extend deadlines promulgated in the 2024 \"Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category\" (2024 rule), update the 2024 rule's transfer provisions to allow facilities to switch between compliance alternatives, and create authority for alternative applicability dates and paperwork submission dates, based on site-specific factors.","action":"Final rule."},"dockets":["EPA-HQ-OW-2009-0819"],"rins":["RIN 2040-AG54"],"related":[{"doc_id":11498,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis For EPA’s Proposed RCRA Regulation Of Coal Combustion Residues (CCR) Generated by the Electric Utility Industry  [DCN SE02969]","date":"2013-06-07"},{"doc_id":11648,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Technical Support Document: Calculating Benefit Per-Ton Estimates. Final Ozone NAAQS regulatory impact analysis [DCN SE03161]","date":"2013-06-07"},{"doc_id":11822,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis of the Clean Air Mercury Rule (EPA-452/R-05-003) [DCN SE03159]","date":"2013-06-07"},{"doc_id":11851,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Industrial Boilers and Process Heaters NESHAP: Final Report (EPA-452/R-04-0020) [DCN SE03156]","date":"2013-06-07"},{"doc_id":11896,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE03170]","date":"2013-06-07"},{"doc_id":11937,"source":"ria","org":"EPA","doc_type":"regulatory_analysis","title":"Final Regulatory Analysis: Control of Emissions from Nonroad Diesel Engines (EPA420-R-04-007) [DCN SE03157]","date":"2013-06-07"},{"doc_id":12207,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Quality Assurance Project Plan (QAPP) for Economic Impact and Benefits Analysis for Steam Electric Rulemaking [DCN SE03376]","date":"2013-06-07"},{"doc_id":12219,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"List of Rulemaking Cost and Economic Impact Files: Steam Electric Effluent Guidelines Rulemaking [DCN SE03351]","date":"2013-06-07"},{"doc_id":131349,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"Economic Assessment of Damage Related to the Eagle Mine Facility [DCN SE03117]","date":"2013-06-07"},{"doc_id":131350,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"Regulatory Impact Analysis for USEPA’s Proposed RCRA Regulation of Coal Combustion Residues (CCR) Generated by the Electric Utility Industry [DCN SE03168]","date":"2013-06-07"},{"doc_id":131351,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 review - Steam Electric ELG NPRM FRN [DCN SE03884]","date":"2013-06-07"},{"doc_id":131352,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to conclude E.O. 12866 review - SteamElectricELG NPRM FRN - [DCN SE03958]","date":"2013-06-07"},{"doc_id":131353,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document of Changes Made During OMB Review Under E.O. 12866 - SteamElectric ELG NPRM FRN [DCN SE03972]","date":"2013-06-07"},{"doc_id":11525,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866. Revised November 2013 [DCN SE06037]","date":"2015-11-03"},{"doc_id":11644,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866. Revised July 2015. [DCN SE06038]","date":"2015-11-03"},{"doc_id":11652,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants [DCN SE06112]","date":"2015-11-03"},{"doc_id":11875,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE05976]","date":"2015-11-03"},{"doc_id":11978,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"List of Rulemaking Cost and Economic Impact Files: Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE05981]","date":"2015-11-03"},{"doc_id":130486,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"CCR RIA Tonnage Data for OW's ELG IPM Modeling [DCN SE05703]","date":"2015-11-03"},{"doc_id":130487,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"Regulatory Impact Analysis for EPA’s 2015 RCRA Final Rule Regulating Coal Combustion Residue (CCR) Landfills and Surface Impoundments at Coal-Fired Electric Utility Power Plants [DCN SE06111]","date":"2015-11-03"},{"doc_id":130488,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 review - Steam Electric ELG NRM FRN - DCN SE04406","date":"2015-11-03"},{"doc_id":130489,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to conclude E.O. 12866 review - SteamElectricELG NRM FRN - DCN SE04407","date":"2015-11-03"},{"doc_id":130490,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document of Changes Made During OMB Review Under E.O. 12866 - Steam Electric ELG NRM FRN - DCN SE04408","date":"2015-11-03"},{"doc_id":130491,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB E.O. 12866 Meetings with Stakeholders - DCN SE06362","date":"2015-11-03"},{"doc_id":130492,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information From Public Received During Interagency Review - UWAG Comment on FGD Limits - DCN SE06366","date":"2015-11-03"},{"doc_id":130493,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information from Public Received During Interagency Review - UWAG Comment on FGD Nitrate Limit - DCN SE06367","date":"2015-11-03"},{"doc_id":130494,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information From Public Received During Interagency Review - UWAG Comment on FGD Cost Effectiveness - DCN SE06368","date":"2015-11-03"},{"doc_id":130495,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information From Public Received During Interagency Review - UWAG Comment on Bottom Ash Transport Water - DCN SE06369","date":"2015-11-03"},{"doc_id":130496,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information From Public Received During Interagency Review - Duke Energy Comment on Steam Electric ELGs - DCN SE06370","date":"2015-11-03"},{"doc_id":130497,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Information From Public Received During Interagency Review - UWAG on Calculating FGD Limits - DCN SE06371","date":"2015-11-03"},{"doc_id":129939,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document Submitted to Initiate E.O. 12866 Review: Draft Federal Register Notice for Postponement of Certain Compliance Dates for Steam Electric ELGs - DCN SE06671","date":"2017-09-18"},{"doc_id":129940,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document of Changes Made During OMB Review Under E.O. 12866: Draft Federal Register Notice for Postponement of Certain Compliance Dates for Steam Electric ELGs - DCN SE06672","date":"2017-09-18"},{"doc_id":129941,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document Submitted to Conclude OMB Review Under E.O. 12866: Final Federal Register Notice for Postponement of Certain Compliance Dates for Steam Electric ELGs - DCN SE06673","date":"2017-09-18"},{"doc_id":11487,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis of the Clean Air Mercury Rule [DCN SE07529]","date":"2019-11-22"},{"doc_id":11561,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE07620]","date":"2019-11-22"},{"doc_id":11669,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866 [DCN SE07449]","date":"2019-11-22"},{"doc_id":11674,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866 [DCN SE07448]","date":"2019-11-22"},{"doc_id":11717,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Repeal of the Clean Power Plan, and the Emission Guidelines for Greenhouse Gas Emissions from Existing Electric Utility Generating Units [DCN SE07624]","date":"2019-11-22"},{"doc_id":11826,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Revisions to the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE07400]","date":"2019-11-22"},{"doc_id":11829,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed Emission Guidelines for Greenhouse Gas Emissions from Existing Electric Utility Generating Units; Revisions to Emission Guideline Implementing Regulations; Revisions to New Source Review Program. [DCN SE07552]","date":"2019-11-22"},{"doc_id":11831,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Final Ozone NAAQS Regulatory Impact Analysis [DCN SE07790]","date":"2019-11-22"},{"doc_id":11854,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for EPA’s 2015 RCRA Final Rule Regulating Coal Combustion Residue (CCR) Landfills and Surface Impoundments at Coal-Fired Electric Utility Power Plants [DCN SE07544]","date":"2019-11-22"},{"doc_id":12026,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis of the Final Rule to Revise the TASCA Lead-Dust Hazard Standards. June 2019 [DCN SE07429]","date":"2019-11-22"},{"doc_id":12072,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Results Of Cost And Economic Impact Screening Analysis, For Baseline And Regulatory Options [DCN SE07642]","date":"2019-11-22"},{"doc_id":12123,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis for the Final Stage 2 Disinfectants and Disinfection Byproducts Rule [DCN SE07528]","date":"2019-11-22"},{"doc_id":12150,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Analysis of Compliance Costs and Economic Impacts [DCN SE07641]","date":"2019-11-22"},{"doc_id":12227,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Document submitted to initiate E.O. 12866 review - SteamElectricELG NPRM RIA - DCN SE08058","date":"2019-11-22"},{"doc_id":12230,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis for the Final Section 316(b) Existing Facilities Rule [DCN SE07619]","date":"2019-11-22"},{"doc_id":129328,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"Economic Analysis of the Proposed Lead and Copper Rule Revisions [DCN SE07456]","date":"2019-11-22"},{"doc_id":129329,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"Regulatory Impact Analysis of the Proposed Revisions to the National Ambient Air Quality Standards for Ground-Level Ozone [DCN SE07789]","date":"2019-11-22"},{"doc_id":129330,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact Analysis Under Executive Order 12866 [DCN SE07450]","date":"2019-11-22"},{"doc_id":129331,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 review - SteamElectricELG NPRM FRN - DCN SE08056","date":"2019-11-22"},{"doc_id":129332,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to conclude E.O. 12866 Review - SteamElectricELG NPRM RIA - DCN SE08059","date":"2019-11-22"},{"doc_id":129333,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 review - SteamElectricELG NPRM BCA - DCN SE08060","date":"2019-11-22"},{"doc_id":129334,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to conclude E.O. 12866 review - SteamElectricELG NPRM BCA - DCN SE08061","date":"2019-11-22"},{"doc_id":129335,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document Submitted To Conclude E.O. 12866 Review - Steam Electric ELG NPRM FRN - DCN SE08057","date":"2019-11-22"},{"doc_id":11557,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Final Revisions to the National Ambiant Air Quality Standards for Particulate Matter - DCN SE09314","date":"2020-10-13"},{"doc_id":11627,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis, Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; A Holistic Approach to Closure Part A: Deadline to Initiate Closure - DCN SE09489","date":"2020-10-13"},{"doc_id":11708,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis (RIA) For EPA’s 2015 Coal Combustion Residuals (CCR) Final Rule - DCN SE09481","date":"2020-10-13"},{"doc_id":11721,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Document submitted to Initiate Executive Order 12866 Regulatory Impact Analysis for Revisions to Electric Effluent Limitations Guidelines and Standards (ELG) for the Steam Electric Power Generating Point Source Category 2040-AF77 FRN RIA - SE09079","date":"2020-10-13"}],"references":[{"citation_id":454724,"raw_reference":"Grid Reliability and U.S. Coal Fleet Attributes: Considerations for State Regulators (DCN SE12000)","cited_authors":"National Association of Regulatory Utility Commissioners (NARUC)","cited_year":"2025","cited_title":"Grid Reliability and U.S. Coal Fleet Attributes: Considerations for State Regulators","cited_venue":"NARUC","cited_doi":"10.2172/2996985","cited_url":null,"ref_kind":"research_report","section":"V.B","page":null,"context_sentence":null,"paper_id":49070,"paper_title":"Grid Reliability and U.S. Coal Fleet Attributes: Considerations for State Regulators","paper_year":2025,"paper_doi":"10.2172/2996985"},{"citation_id":454725,"raw_reference":"2024 U.S. Data Center Energy Usage Report","cited_authors":"U.S. Department of Energy","cited_year":"2024","cited_title":"2024 U.S. Data Center Energy Usage Report","cited_venue":"Department of Energy","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"VI.A","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454726,"raw_reference":"NERC 2025-2026 Winter Reliability Assessment (DCN SE12030)","cited_authors":"North American Electric Reliability Corporation (NERC)","cited_year":"2025","cited_title":"2025-2026 Winter Reliability Assessment","cited_venue":"NERC","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454727,"raw_reference":"December 2024 LTRA (DCN SE11905)","cited_authors":"North American Electric Reliability Corporation (NERC)","cited_year":"2024","cited_title":"Long-Term Reliability Assessment","cited_venue":"NERC","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454728,"raw_reference":"2024 Reliability Imperative report (DCN SE11929)","cited_authors":"Midcontinent Independent System Operator (MISO)","cited_year":"2024","cited_title":"Reliability Imperative","cited_venue":"MISO","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454729,"raw_reference":"PJM's 2023 study (DCN SE11847) and 2024 study (DCN SE11901)","cited_authors":"PJM Interconnection","cited_year":"2024","cited_title":"PJM 2024 load forecast / study report","cited_venue":"PJM Interconnection","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454730,"raw_reference":"Winning the Arms Race: America's AI Action Plan (DCN SE11954)","cited_authors":"President of the United States","cited_year":"2025","cited_title":"Winning the Arms Race: America's AI Action Plan","cited_venue":"White House","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"V.C","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454731,"raw_reference":"Data Center Infrastructure for 2025 (DCN SE11922)","cited_authors":"National Renewable Energy Center","cited_year":"2025","cited_title":"Data Center Infrastructure for 2025","cited_venue":"National Renewable Energy Center","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.C","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":454732,"raw_reference":"Overview of Costs and Benefits of Steam Electric ELG 2025 Deadline Extensions Final Rule (DCN SE12028)","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2025","cited_title":"Overview of Costs and Benefits of Steam Electric ELG 2025 Deadline Extensions Final Rule","cited_venue":"EPA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"VII.A","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}