Renewable Energy Modernization Rule
Federal Register2023-01-30 · DEPARTMENT OF THE INTERIOR; Bureau of Ocean Energy Management · Proposed Rule · 2023-00668
Notice of proposed rulemaking.
The first Outer Continental Shelf (OCS) renewable energy regulations were promulgated in 2009 by BOEM's predecessor, the Minerals Management Service (MMS). BOEM's renewable energy program has matured over the past 13 years, during which time BOEM conducted eleven auctions and issued and managed 27 active commercial leases. Based on this experience, the Department has identified opportunities to modernize its regulations to facilitate the development of offshore wind energy resources to meet U.S. climate and renewable energy objectives. This proposed rule contains reforms identified by the Department and recommended by industry since 2010, including proposals for incremental funding of decommissioning accounts; more flexible geophysical and geotechnical survey submission requirements; streamlined approval of meteorological (met) buoys; revised project verification procedures; reform of BOEM's renewable energy auction process; and greater clarity regarding safety requirements. This proposed rule would advance the Department of the Interior's (DOI) energy policies in a safe and environmentally sound manner that would provide a fair return to the U.S. taxpayer.
Original sourceXML (753 KB)PDF (1.1 MB)
Other documents for the same rulemaking (all, by stage)
References: 13 extracted, 2 linked to papers
Page 1Download these results: CSV · JSON
Dep't of Energy & Dep't Of Interior, National Offshore Wind Strategy (2016)
Office of Renewable Energy Programs, Bureau of Ocean Energy Mgmt., Commercial Wind Lease Issuance and Site Assessment Activities on the Atlantic Outer Continental Shelf Offshore New Jersey, Delaware, Maryland, and Virginia, Final Environmental Assessment (2012)
Office of Renewable Energy Programs, Bureau of Ocean Energy Mgmt., Commercial Wind Lease Issuance and Site Assessment Activities on the Atlantic Outer Continental Shelf Offshore Massachusetts, Revised Environmental Assessment (2014)
Office of Renewable Energy Programs, Bureau of Ocean Energy Mgmt., Commercial Wind Lease Issuance and Site Assessment Activities on the Atlantic Outer Continental Shelf Offshore New York, Revised Environmental Assessment (2016)
U.S. Army Corps of Engineers, Nationwide Permit 5—Scientific Measurement Devices (2017)
Office of Renewable Energy, Bureau of Ocean Energy Mgmt., Phased Approaches to Offshore Wind Developments and Use of Project Design Envelope, Final Technical Report (2017)
Soc'y for Underwater Tech., Guidance Notes for the Planning and Execution of Geophysical and Geotechnical Ground Investigations for Offshore Renewable Energy Developments (Mick Cook ed., 2014)
Bureau of Ocean Energy Mgmt., Data Gathering Process: Geotechnical Departures for Offshore Wind Energy (2018)
Panel on Certification of Offshore Structures, National Research Council, Verification of Fixed Offshore Oil and Gas Platforms 8-9 (1977)
Transportation Research Board, Nat'l Academies of Sciences, Engineering, and Medicine, Structural Integrity of Offshore Wind Turbines, Oversight of Design, Fabrication, and Installation 96-108 (2011)
Government Accountability Office, GAO-16-40, Offshore Oil and Gas Resources, Action Needed to Better Protect Against Billions of Dollars in Federal Exposure to Decommissioning Liabilities 34 (2015)
The IRIA is posted to this proposed rule's docket at https://www.regulations.gov/docket?D=BOEM-2020-0033.
NTL No. 2018-G03
otherNot linked to a paper · § 585.902 What are the general requirements for decommissioning for facilities authorized under my SAP, COP, or GAP?