{"document":{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06","url":"https://www.federalregister.gov/documents/2020/02/06/2020-01459/pipeline-safety-valve-installation-and-minimum-rupture-detection-standards","source_native_id":"2020-01459","status":"fetched","abstract":"PHMSA is proposing to revise the Pipeline Safety Regulations applicable to newly constructed and entirely replaced onshore natural gas transmission and hazardous liquid pipelines to mitigate ruptures. Additionally, PHMSA is revising the regulations regarding rupture detection to shorten pipeline segment isolation times. These proposals address congressional mandates, incorporate recommendations from the National Transportation Safety Board, and are necessary to reduce the consequences of large-volume, uncontrolled releases of natural gas and hazardous liquid pipeline ruptures.","action":"Notice of proposed rulemaking."},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":4448,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections","date":"2023-08-01"},{"doc_id":407,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections","date":"2024-06-28"}],"references":[{"citation_id":27112,"raw_reference":"Oak Ridge National Laboratory; \"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety;\" ORNL/TM-2012/411; October 31, 2012.","cited_authors":"Oak Ridge National Laboratory","cited_year":"2012","cited_title":"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety","cited_venue":"Oak Ridge National Laboratory, ORNL/TM-2012/411","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/16701/finalvalvestudy.pdf","ref_kind":"research_report","section":"fn 5","page":null,"context_sentence":null,"paper_id":273,"paper_title":"Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety","paper_year":2012,"paper_doi":"10.2172/1373899"},{"citation_id":27113,"raw_reference":"\"Leak Detection Study—DTPH56-11-D-000001;\" Kiefner and Associates, Inc.; Final Report No. 12-173; December 10, 2012.","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2012","cited_title":"Leak Detection Study—DTPH56-11-D-000001","cited_venue":"Kiefner and Associates, Inc., Final Report No. 12-173","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/16691/leak-detection-study.pdf","ref_kind":"research_report","section":"fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27114,"raw_reference":"\"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response,\" Government Accountability Office Report to Congressional Committees, January 2013.","cited_authors":"Government Accountability Office","cited_year":"2013","cited_title":"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","cited_venue":"Government Accountability Office, GAO-13-168","cited_doi":null,"cited_url":"https://www.gao.gov/assets/660/651408.pdf","ref_kind":"government_report","section":"fn 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27115,"raw_reference":"\"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010; NTSB Accident Report PAR-11/01; Adopted August 30, 2011.","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010","cited_venue":"NTSB Accident Report PAR-11/01","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","ref_kind":"government_report","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27116,"raw_reference":"National Transportation Safety Board Pipeline Accident Report; Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire; Edison, New Jersey; March 23, 1994.","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire; Edison, New Jersey; March 23, 1994","cited_venue":"NTSB Pipeline Accident Report PAR-95/01","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR9501.pdf","ref_kind":"government_report","section":"fn 12","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27117,"raw_reference":"Remotely Controlled Valves on Interstate Natural Gas Pipelines (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996); September 1999.","cited_authors":null,"cited_year":"1999","cited_title":"Remotely Controlled Valves on Interstate Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":"https://rosap.ntl.bts.gov/view/dot/16918/dot_16918_DS1.pdf?","ref_kind":"government_report","section":"fn 31","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27118,"raw_reference":"M. Stephens, \"A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines,\" GRI-00/0189, Gas Research Institute, October 2000.","cited_authors":"M. Stephens","cited_year":"2000","cited_title":"A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines","cited_venue":"Gas Research Institute, GRI-00/0189","cited_doi":"10.1115/ipc2002-27073","cited_url":null,"ref_kind":"research_report","section":"fn 30","page":null,"context_sentence":"The use of ASVs or RCVs would have reduced the amount of time taken to stop the flow of gas and would have shortened the time the site was inaccessible to emergency responders. Additionally, studies have indicated that a prolonged gas-fed fire leads to increased property damage, including two separate studies from the Gas Research Institute,\\30\\ as well as a 1999 study from RSPA stating that RCV use could reduce property damage, reduce public disruption of product supply, reduce damage to other utilities, and allow emergency responders faster access to the accident site.\\31\\ ---------------------------------------------------------------------------","paper_id":8022,"paper_title":"A Model for Sizing High Consequence Areas Associated With Natural Gas Pipelines","paper_year":2002,"paper_doi":"10.1115/ipc2002-27073"},{"citation_id":27119,"raw_reference":"C.R. Sparks, \"Remote and Automatic Main Line Valve Technology Assessment,\" Gas Research Institute, July 1995.","cited_authors":"C.R. Sparks","cited_year":"1995","cited_title":"Remote and Automatic Main Line Valve Technology Assessment","cited_venue":"Gas Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 30","page":null,"context_sentence":"The use of ASVs or RCVs would have reduced the amount of time taken to stop the flow of gas and would have shortened the time the site was inaccessible to emergency responders. Additionally, studies have indicated that a prolonged gas-fed fire leads to increased property damage, including two separate studies from the Gas Research Institute,\\30\\ as well as a 1999 study from RSPA stating that RCV use could reduce property damage, reduce public disruption of product supply, reduce damage to other utilities, and allow emergency responders faster access to the accident site.\\31\\ ---------------------------------------------------------------------------","paper_id":59465,"paper_title":"REMOTE AND AUTOMATIC MAIN LINE VALVE TECHNOLOGY ASSESSMENT FINAL REPORT.","paper_year":1995,"paper_doi":null},{"citation_id":27120,"raw_reference":"FERC, 2015. Southeast Market Pipelines Project, Final EIS, Office of Energy Projects.","cited_authors":"Federal Energy Regulatory Commission","cited_year":"2015","cited_title":"Southeast Market Pipelines Project, Final EIS","cited_venue":"Office of Energy Projects","cited_doi":null,"cited_url":"https://www.ferc.gov/industries/gas/enviro/eis/2015/12-18-15-eis.asp","ref_kind":"government_report","section":"fn 33","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27121,"raw_reference":"FERC, 2016. Rover Pipeline, Panhandle Backhaul, and Trunkline Backhaul Projects, Final EIS.","cited_authors":"Federal Energy Regulatory Commission","cited_year":"2016","cited_title":"Rover Pipeline, Panhandle Backhaul, and Trunkline Backhaul Projects, Final EIS","cited_venue":"Federal Energy Regulatory Commission","cited_doi":null,"cited_url":"https://www.ferc.gov/industries/gas/enviro/eis/2016/07-29-16-rover-pipeline.asp","ref_kind":"government_report","section":"fn 34","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27122,"raw_reference":"Carey and Rogers. 2011. PG&E officials grilled about automatic shut off valves. Silicon Valley MercuryNews.com, posted 3/1/11.","cited_authors":"Carey and Rogers","cited_year":"2011","cited_title":"PG&E officials grilled about automatic shut off valves","cited_venue":"Silicon Valley MercuryNews.com","cited_doi":null,"cited_url":"http://www.mercurynews.com/san-bruno-fire/ci_17510209?nclick_check=1","ref_kind":"news","section":"fn 26","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":27123,"raw_reference":"California Public Utilities Commission. 2012. \"CPUC Approves Pipeline Safety Plan for PG&E; Increases Whistleblower Protections.\"","cited_authors":"California Public Utilities Commission","cited_year":"2012","cited_title":"CPUC Approves Pipeline Safety Plan for PG&E; Increases Whistleblower Protections","cited_venue":"California Public Utilities Commission","cited_doi":null,"cited_url":"http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M040/K531/40531580.PDF","ref_kind":"government_report","section":"fn 27","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}