{"document":{"doc_id":6712,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers","doc_type":"Proposed Rule","title":"Proposal To Reissue and Modify Nationwide Permits","date":"2020-09-15","url":"https://www.federalregister.gov/documents/2020/09/15/2020-17116/proposal-to-reissue-and-modify-nationwide-permits","source_native_id":"2020-17116","status":"fetched","abstract":"Nationwide Permits (NWPs) authorize certain activities under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. The U.S. Army Corps of Engineers (Corps) is proposing to reissue its existing NWPs and associated general conditions and definitions, with some modifications. We are also proposing to issue five new NWPs. Two of those proposed new NWPs would authorize certain categories of mariculture activities (i.e., seaweed and finfish mariculture) that are not authorized by NWP 48. We are proposing to divide the current NWP that authorizes utility line activities (NWP 12) into three separate NWPs that address the differences in how different linear projects are constructed, the substances they convey, and the different standards and best management practices that help ensure those NWPs authorize only those activities that have no more than minimal adverse environmental effects. Specifically, we are proposing to modify the current utility line NWP 12 to authorize only oil and natural gas pipeline activities. Two proposed new NWPs would authorize activities associated with the construction, maintenance, repair, and removal of electric utility lines/telecommunication lines and utility lines that convey water, sewage, and other substances. The fifth proposed new NWP would authorize discharges of dredged or fill material into jurisdictional waters for the construction, expansion, and maintenance of water reuse and reclamation facilities. We are proposing these modifications to simplify and clarify the NWPs, reduce burdens on the regulated public, and continue to comply with the statutory requirement that these NWPs authorize only activities with no more than minimal individual and cumulative adverse environmental effects. The Corps is requesting comment on all aspects of these proposed nationwide permits.","action":"Notice of proposed rulemaking."},"dockets":["COE-2020-0002"],"rins":["RIN 0710-AA84"],"related":[{"doc_id":18728,"source":"ria","org":"COE","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Proposed 2020 Nationwide Permits","date":"2020-09-15"},{"doc_id":5493,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers","doc_type":"Rule","title":"Reissuance and Modification of Nationwide Permits","date":"2021-01-13"},{"doc_id":18638,"source":"ria","org":"COE","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for January 2021 NWPs","date":"2021-01-13"},{"doc_id":5730,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers","doc_type":"Rule (administrative)","title":"Reissuance and Modification of Nationwide Permits; Correction","date":"2021-05-20"},{"doc_id":18635,"source":"ria","org":"COE","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for December 2021 Nationwide Permits","date":"2021-12-27"}],"references":[{"citation_id":29734,"raw_reference":"MacDonald 2000","cited_authors":"MacDonald","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"I.A General","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29735,"raw_reference":"Gosselink and Lee 1989","cited_authors":"Gosselink and Lee","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"I.A General","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29736,"raw_reference":"Stein et al. 2009","cited_authors":"Stein et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29737,"raw_reference":"Smith et al. 1995","cited_authors":"Smith et al.","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29738,"raw_reference":"Smith et al. 2013","cited_authors":"Smith et al.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29739,"raw_reference":"Institute of Water Resources in 2015 (Report 2015-R-03), \"Mitigation Rule Retrospective: A Review of the 2008 Regulations Governing Compensatory Mitigation for Losses of Aquatic Resources\"","cited_authors":"U.S. Army Corps of Engineers Institute of Water Resources","cited_year":"2015","cited_title":"Mitigation Rule Retrospective: A Review of the 2008 Regulations Governing Compensatory Mitigation for Losses of Aquatic Resources","cited_venue":"Institute of Water Resources, Report 2015-R-03","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29740,"raw_reference":"Doyle et al. 2015","cited_authors":"Doyle et al.","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29741,"raw_reference":"Lave 2014","cited_authors":"Lave","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29742,"raw_reference":"Downing et al. (2012)","cited_authors":"Downing et al.","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29743,"raw_reference":"BenDor and others (2009)","cited_authors":"BenDor et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29744,"raw_reference":"Lave et al. 2010","cited_authors":"Lave et al.","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29745,"raw_reference":"Montgomery and Buffington (1997)","cited_authors":"Montgomery and Buffington","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29746,"raw_reference":"Fischenich 2006","cited_authors":"Fischenich","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29747,"raw_reference":"Meyer and Wallace 2001","cited_authors":"Meyer and Wallace","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29748,"raw_reference":"Hansen 2001","cited_authors":"Hansen","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29749,"raw_reference":"Brooks and Colburn 2011","cited_authors":"Brooks and Colburn","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29750,"raw_reference":"Finlay 2011","cited_authors":"Finlay","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29751,"raw_reference":"Alexander et al. 2000","cited_authors":"Alexander et al.","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29752,"raw_reference":"Beechie et al. 2013","cited_authors":"Beechie et al.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29753,"raw_reference":"Gomi et al. 2002","cited_authors":"Gomi et al.","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29754,"raw_reference":"Mulholland et al. 2008","cited_authors":"Mulholland et al.","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29755,"raw_reference":"Leopold 1994","cited_authors":"Leopold","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29756,"raw_reference":"Sparks 1995","cited_authors":"Sparks","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29757,"raw_reference":"Allan and Castillo (2007)","cited_authors":"Allan and Castillo","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29758,"raw_reference":"Knighton and Nanson 1993","cited_authors":"Knighton and Nanson","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29759,"raw_reference":"Chalov 2001","cited_authors":"Chalov","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29760,"raw_reference":"NRC 2002","cited_authors":"National Research Council","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29761,"raw_reference":"Allan 2004","cited_authors":"Allan","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"II.A Proposed Removal of the 300 Linear Foot Limit","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32144,"raw_reference":"U.S. Department of Energy, National Renewable Energy Laboratory, https://www.nrel.gov/analysis/transmission-infrastructure.html (accessed April 3, 2020).","cited_authors":"U.S. Department of Energy, National Renewable Energy Laboratory","cited_year":"2020","cited_title":"Transmission infrastructure","cited_venue":"National Renewable Energy Laboratory","cited_doi":null,"cited_url":"https://www.nrel.gov/analysis/transmission-infrastructure.html","ref_kind":"web_page","section":"fn 15","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32145,"raw_reference":"Institute for Water Resources (IWR). 2001. Cost analysis for the 2000 issuance and modification of nationwide permits. Institute for Water Resources (Alexandria, VA). 29 pp. plus appendices.","cited_authors":"Institute for Water Resources","cited_year":"2001","cited_title":"Cost analysis for the 2000 issuance and modification of nationwide permits","cited_venue":"Institute for Water Resources (Alexandria, VA)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32146,"raw_reference":"https://www3.epa.gov/npdes/pubs/sewers-lift_station.pdf (accessed April 2, 2020).","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2020","cited_title":"Sewers lift station","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":"https://www3.epa.gov/npdes/pubs/sewers-lift_station.pdf","ref_kind":"web_page","section":"fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32147,"raw_reference":"https://ecos.fws.gov/ipac/","cited_authors":"U.S. Fish and Wildlife Service","cited_year":null,"cited_title":"Information Planning and Consultation (IPaC) system","cited_venue":"U.S. Fish and Wildlife Service","cited_doi":null,"cited_url":"https://ecos.fws.gov/ipac/","ref_kind":"web_page","section":"fn 17","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32672,"raw_reference":"U.S. Department of Energy 2015, citing the North American Electric Reliability Corporation Electricity Supply and Demand Database","cited_authors":"U.S. Department of Energy","cited_year":"2015","cited_title":null,"cited_venue":"North American Electric Reliability Corporation Electricity Supply and Demand Database","cited_doi":null,"cited_url":"http://www.nerc.com/page.php?cid=4|38","ref_kind":"dataset","section":"NWP 12 discussion (Oil and Natural Gas Pipeline Activities / electric utility lines)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32673,"raw_reference":"NRC 2006","cited_authors":"National Research Council","cited_year":"2006","cited_title":null,"cited_venue":"National Research Council","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Discussion of utility line sizes (NWP 12 proposal)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32674,"raw_reference":"Wohl et al. 2015","cited_authors":"Wohl, E., et al.","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 27 discussion of sediment supplies and transport","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32675,"raw_reference":"Kondolf et al. 2014","cited_authors":"Kondolf, G. M., et al.","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 27 discussion of sediment passed through reservoirs","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32676,"raw_reference":"NRC 2010","cited_authors":"National Research Council","cited_year":"2010","cited_title":"Ecosystem Concepts for Sustainable Bivalve Mariculture","cited_venue":"National Research Council","cited_doi":"10.17226/12802","cited_url":null,"ref_kind":"research_report","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":8930,"paper_title":"Ecosystem Concepts for Sustainable Bivalve Mariculture","paper_year":2010,"paper_doi":"10.17226/12802"},{"citation_id":32677,"raw_reference":"Tallis et al. 2009","cited_authors":"Tallis, H., et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32678,"raw_reference":"Dumbauld et al. 2009","cited_authors":"Dumbauld, B. R., et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32679,"raw_reference":"Clewell and Aronson (2013)","cited_authors":"Clewell, A. F., and Aronson, J.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"book","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32680,"raw_reference":"Ferriss et al. 2019","cited_authors":"Ferriss, B. E., et al.","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities (eelgrass meta-analysis)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32681,"raw_reference":"Lotze et al. 2006","cited_authors":"Lotze, H. K., et al.","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32682,"raw_reference":"Kellogg et al. 2018","cited_authors":"Kellogg, L., et al.","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32683,"raw_reference":"Turner et al. (2019)","cited_authors":"Turner, E., et al.","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32684,"raw_reference":"Waycott et al. (2009)","cited_authors":"Waycott, M., et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32685,"raw_reference":"Alleway 2019","cited_authors":"Alleway, H. K., et al.","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 and proposed NWPs A and B (mariculture ecosystem services)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32686,"raw_reference":"Lester et al. 2018","cited_authors":"Lester, S. E., et al.","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Discussion of Proposed New NWPs (seaweed and finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32687,"raw_reference":"Duarte et al. 2009","cited_authors":"Duarte, C. M., et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Discussion of Proposed New NWPs (seaweed and finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32688,"raw_reference":"Hasselström et al. 2018","cited_authors":"Hasselström, L., et al.","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Proposed NWP A (seaweed mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32689,"raw_reference":"Gentry et al. 2017","cited_authors":"Gentry, R. R., et al.","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Proposed NWP B (finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32690,"raw_reference":"Froehlich et al. 2018","cited_authors":"Froehlich, H. E., et al.","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Proposed NWP B (finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32691,"raw_reference":"Price and Morris 2013","cited_authors":"Price, C. S., and Morris, J. A.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Proposed NWP B (finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32692,"raw_reference":"FAO 2018","cited_authors":"Food and Agriculture Organization of the United Nations","cited_year":"2018","cited_title":null,"cited_venue":"Food and Agriculture Organization of the United Nations","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Proposed NWP B (finfish mariculture)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32693,"raw_reference":"Orth et al. 2017","cited_authors":"Orth, R. J., et al.","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32694,"raw_reference":"Wilberg 2011","cited_authors":"Wilberg, M. J., et al.","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 Commercial Shellfish Mariculture Activities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32695,"raw_reference":"Jackson et al. 2001","cited_authors":"Jackson, J. B. C., et al.","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 cumulative effects discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32696,"raw_reference":"Halpern and Fujita 2013","cited_authors":"Halpern, B. S., and Fujita, R.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 cumulative effects discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32697,"raw_reference":"Folke et al. 2004","cited_authors":"Folke, C., et al.","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 regime shift discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":32698,"raw_reference":"Gunderson 2000","cited_authors":"Gunderson, L. H.","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"NWP 48 resilience discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}