{"document":{"doc_id":6602,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2020-10-14","url":"https://www.federalregister.gov/documents/2020/10/14/2020-19872/pipeline-safety-class-location-change-requirements","source_native_id":"2020-19872","status":"fetched","abstract":"In response to public input received as part of the rulemaking process, PHMSA is proposing to revise the Federal Pipeline Safety Regulations to amend the requirements for gas transmission pipeline segments that experience a change in class location. Under the existing regulations, pipeline segments located in areas where the population density has significantly increased must perform one of the following actions: Reduce the pressure of the pipeline segment, pressure test the pipeline segment to higher standards, or replace the pipeline segment. This proposed rule would add an alternative set of requirements operators could use, based on implementing integrity management principles and pipe eligibility criteria, to manage certain pipeline segments where the class location has changed from a Class 1 location to a Class 3 location. Through required periodic assessments, repair criteria, and other extra preventive and mitigative measures, PHMSA expects this alternative approach would provide long-term safety benefits consistent with the current natural gas pipeline safety rules while also providing cost savings for pipeline operators.","action":"Notice of proposed rulemaking (NPRM)."},"dockets":["PHMSA-2017-0151"],"rins":["RIN 2137-AF29"],"related":[{"doc_id":88421,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2018-07-31"},{"doc_id":129008,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting with CNGC and INGAA - 07272020.pdf.2020.9.28","date":"2020-09-28"},{"doc_id":2753,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"2137-AF29 Class Location PRIA","date":"2020-10-14"},{"doc_id":128894,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Class Location NPRM OMB Redline 2017-0151","date":"2020-12-23"},{"doc_id":2735,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"RIA gas tariff rate cases","date":"2026-01-13"},{"doc_id":2741,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Class Location Change RIA January 2026","date":"2026-01-13"},{"doc_id":2747,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional RIA Support","date":"2026-01-13"},{"doc_id":127396,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive changes in Class Location Change Final Rule Preamble During OIRA Review - EO 12866","date":"2026-01-13"},{"doc_id":2722,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2026-01-14"},{"doc_id":2868,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration","date":"2026-04-01"},{"doc_id":2967,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Class Location Change Requirements; Correction","date":"2026-05-29"}],"references":[{"citation_id":29058,"raw_reference":"Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements (2016)","cited_authors":null,"cited_year":"2016","cited_title":"Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements","cited_venue":"PHMSA report to Congress","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/news/55521/report-congress-evaluation-expanding-pipeline-imp-hcas-full.pdf","ref_kind":"government_report","section":"fn 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29059,"raw_reference":"NTSB, Pipeline Accident Report: Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000, PAR-03-01, adopted on February 11, 2003.","cited_authors":"NTSB","cited_year":"2003","cited_title":"Pipeline Accident Report: Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000","cited_venue":"NTSB PAR-03-01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 33","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29060,"raw_reference":"NTSB, Pipeline Accident Report: Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey; March 23, 1994; PAR-95-01, adopted on January 18, 1995.","cited_authors":"NTSB","cited_year":"1995","cited_title":"Pipeline Accident Report: Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey; March 23, 1994","cited_venue":"NTSB PAR-95-01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 34","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29061,"raw_reference":"A.W. Peabody, \"Peabody's Control of Pipeline Corrosion,\" second edition, \"Criteria for Cathodic Protection.\"","cited_authors":"A.W. Peabody","cited_year":null,"cited_title":"Peabody's Control of Pipeline Corrosion, second edition","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 89","page":null,"context_sentence":"(8) Pipe with poor external coating that requires negative cathodic polarization voltage shifts of 100 millivolts or more,\\89\\ or linear anodes to maintain cathodic protection, or pipe with tape wraps or shrink sleeves.","paper_id":70282,"paper_title":"Peabody's control of pipeline corrosion: second edition.","paper_year":2001,"paper_doi":null},{"citation_id":29062,"raw_reference":"NTSB/PAR-11/01","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":null,"cited_venue":"NTSB accident report NTSB/PAR-11/01 (San Bruno)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 63","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29063,"raw_reference":"INGAA, 2013 presentation on applying IM principles to transmission systems","cited_authors":"Interstate Natural Gas Association of America","cited_year":"2013","cited_title":null,"cited_venue":"INGAA presentation","cited_doi":null,"cited_url":"https://www.ingaa.org/File.aspx?id=20899&v=a0233b08","ref_kind":"other","section":"fn 61","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":29064,"raw_reference":"Pipeline Safety Trust and NAPSR comments; API's November 1, 2013, comment at 3","cited_authors":"American Petroleum Institute","cited_year":"2013","cited_title":"API comment on Class Location Requirements NOI","cited_venue":"PHMSA-2013-0161-0025","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=PHMSA-2013-0161-0025","ref_kind":"other","section":"fn 59","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":31989,"raw_reference":"Pacific Gas and Electric Company, Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, CA, September 9, 2010. https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company, Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, CA, September 9, 2010","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","ref_kind":"government_report","section":"fn 104","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}