Policy Replication

Test Procedure Interim Waiver Process

Federal Register2020-12-11 · DEPARTMENT OF ENERGY · Rule · 2020-26321
Final rule.

In this final rule, the U.S. Department of Energy ("DOE") has adopted a streamlined approach to its test procedure waiver decision-making process that requires the Department to notify, in writing, an applicant for an interim waiver of the disposition of the request within 45 business days of receipt of the application. An interim waiver will remain in effect until a final waiver decision is published in the Federal Register or until DOE publishes a new or amended test procedure that addresses the issues presented in the application, whichever is earlier. DOE's regulations continue to specify that DOE will take either of these actions within 1 year of issuance of an interim waiver. This final rule addresses delays in DOE's current process for considering requests for interim waivers and waivers from the DOE test method, which in turn can result in significant delays for manufacturers in bringing new and innovative products to market. This final rule requires the Department to process interim waiver requests within the 45 business day window and clarifies the process by which interested stakeholders provide input into the development of an appropriate test procedure waiver.

RIN 1904-AE24 · Docket EERE-2019-BT-NOA-0011

Other documents for the same rulemaking (all, by stage)

2019-05-01 Federal RegisterTest Procedure Interim Waiver Process
2019-05-16 Docket document2019-05-15 DOE response to letter requesting a public meeting on the test procedure interim waiver proposed rule
2019-05-23 Docket document2019-05-22 DOE response to letter requesting a webinar on the test procedure interim waiver proposed rule
2019-06-26 Federal RegisterTest Procedure Interim Waiver Process
2019-07-12 Docket documentFrequently Asked Questions - Notice of Proposed Rulemaking pertaining to the Test Procedure Interim Waiver Process
2019-07-16 Docket documentDOE notes of teleconference between DOE and representative of SBA Office of Advocacy
2019-07-16 Docket documentDOE Test Procedure Waiver PR Roundtable Attendees 6.26.19
2019-07-22 Federal RegisterTest Procedure Interim Waiver Process
2019-07-22 Docket document2019-07-11 Transcript: Webinar Test Procedure Interim Waiver Process U.S. Dept. of Energy
2020-12-17 Docket documentDocumentation of Changes between the draft Final Rule submitted to the Office of Information and Regulatory Affairs (OIRA) and the issued Final Rule
2021-08-20 Federal RegisterTest Procedure Interim Waiver Process
2021-12-14 Federal RegisterTest Procedure Interim Waiver Process

References: 2 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Total numbers of basic models per product category are accessible via the DOE's Compliance Certification Database. [fn 10: https://www.regulations.doe.gov/certification-data/#q=Product_Group_s%3A*.]
datasetNot linked to a paper · fn 10 · cited link
A full list of petitions for interim waiver can be accessed at https://www.energy.gov/eere/buildings/current-test-procedure-waivers.
web pageNot linked to a paper · Section IV.B.i (National Cost Savings and Forgone Benefits) · cited link