National Bridge Inspection Standards
This final rule updates the National Bridge Inspection Standards (NBIS) for highway bridges. The Moving Ahead for Progress in the 21st Century Act (MAP-21) required the Secretary of Transportation (Secretary) to update the NBIS. Through this final rule, FHWA updates the NBIS to address MAP-21 requirements, incorporate technological advancements including the use of unmanned aircraft systems, and addresses ambiguities identified since the last update to the regulation in 2009. FHWA also is repealing two outdated regulations: the Highway Bridge Replacement and Rehabilitation Program and the Discretionary Bridge Candidate Rating Factor.
Original sourceXML (378 KB)PDF (2.6 MB)
Other documents for the same rulemaking (all, by stage)
References: 9 extracted, 3 linked to papers
Michael J. Parr; Robert J. Connor; and Mark Bowman, M.ASCE, Proposed Method for Determining the Interval for Hands-on Inspection of Steel Bridges with Fracture Critical Members, may be found at the following URL: https://ascelibrary.org/doi/10.1061/%28ASCE%29BE.1943-5592.0000057.
The commenters cited research findings by Purdue University.\6\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------
NCHRP Report 782—Proposed Guideline for Reliability-Based Bridge Inspection Practices
Underwater Bridge Inspection (FHWA-NHI-10-027)
Bridge Inspector's Reference Manual (BIRM)
Hydraulic Engineering Circular No. 23 (HEC-23)—Bridge Scour and Stream Instability Countermeasures: Experience, Selection, and Design Guidance, Third Edition
AASHTO Guide Specifications for Internal Redundancy of Mechanically-Fastened Built-Up Steel Members, 1st Edition
AASHTO Guide Specifications for Analysis and Identification of Fracture Critical Members and System Redundant Members, 1st Edition
Proposed Guideline for Reliability-Based Bridge Inspection Practices. Washington, DC: The National Academies Press. https://doi.org/10.17226/22277.
The rulemaking follows the recommendations of the NCHRP Report 782, Proposed Guideline for Reliability-Based Bridge Inspection Practices which demonstrated and verified that inspection intervals of 72 months (24 months longer than the proposed rulemaking) will be suitable for certain bridges based on their risk profiles.\19\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------
NCHRP Report 782, Proposed Guideline for Reliability-Based Bridge Inspection Practices