{"document":{"doc_id":4267,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Technical Corrections; Response to Petitions for Reconsideration","date":"2023-04-24","url":"https://www.federalregister.gov/documents/2023/04/24/2023-08548/pipeline-safety-safety-of-gas-transmission-pipelines-repair-criteria-integrity-management","source_native_id":"2023-08548","status":"fetched","abstract":"PHMSA is making necessary technical corrections to ensure consistency within, and the intended effect of, a recently issued final rule titled \"Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments.\" PHMSA also alerts the public to its November 18, 2022, and April 19, 2023, responses to petitions for reconsideration of this final rule.","action":"Final rule; technical corrections; response to petitions for reconsideration."},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AF39"],"related":[{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":5137,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments","date":"2022-08-24"},{"doc_id":7204,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis (RIA)","date":"2022-08-26"},{"doc_id":128438,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Final Rule Draft -Redline Comparison Document","date":"2022-08-26"},{"doc_id":5232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments","date":"2022-10-25"},{"doc_id":7209,"source":"ria","org":"PHMSA","doc_type":"regulatory_flexibility_analysis","title":"2137 AF39 Final Regulatory Flexibility Analysis RIN 2","date":"2023-09-15"},{"doc_id":7214,"source":"ria","org":"PHMSA","doc_type":"benefit_cost_analysis","title":"EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses","date":"2023-09-15"},{"doc_id":7219,"source":"ria","org":"PHMSA","doc_type":"regulatory_analysis","title":"Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010","date":"2023-09-15"},{"doc_id":7224,"source":"ria","org":"PHMSA","doc_type":"economic_analysis","title":"U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis","date":"2023-09-15"},{"doc_id":3403,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Corrections To Conform to Judicial Review","date":"2025-01-15"}],"references":[{"citation_id":447513,"raw_reference":"Final Regulatory Impact Analysis, Doc. No. PHMSA-2011-0023-0637, at 44 (Aug. 26, 2022).","cited_authors":"PHMSA","cited_year":"2022","cited_title":"Final Regulatory Impact Analysis","cited_venue":"Pipeline and Hazardous Materials Safety Administration, Department of Transportation; Doc. No. PHMSA-2011-0023-0637","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":447514,"raw_reference":"Final Environmental Assessment, Doc. No. PHMSA-2011-0023-0635 (July 2022).","cited_authors":"PHMSA","cited_year":"2022","cited_title":"Final Environmental Assessment","cited_venue":"Pipeline and Hazardous Materials Safety Administration, Department of Transportation; Doc. No. PHMSA-2011-0023-0635","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 11","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}