Policy Replication

Revising the Duration of Design Certifications

Federal Register2025-08-26 · NUCLEAR REGULATORY COMMISSION · Rule (administrative) · 2025-16286
Direct final rule; confirmation of effective date.

The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of September 15, 2025, for the direct final rule published in the Federal Register on July 2, 2025. This direct final rule amended the NRC's regulations to revise the duration of design certifications (DCs). This action replaced the 15-year duration for DCs with a 40-year duration period, both for existing DCs currently in effect and generically for future DCs. This direct final rule did not change the date of issuance for existing DCs (i.e., the start date by which an existing DC may be referenced remains unchanged). This direct final rule also incorporated a minor editorial correction.

RIN 3150-AL26 · Docket NRC-2025-0018

Other documents for the same rulemaking (all, by stage)

2025-07-02 Federal RegisterRevising the Duration of Design Certifications
2025-07-02 Federal RegisterRevising the Duration of Design Certifications
2025-07-02 Docket documentUnofficial Redline Rule Language (ML25076A696)
2025-07-02 Docket documentEnvironmental Assessment and Finding of No Significant Impact

References

No references to show.