{"document":{"doc_id":3685,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Extension of Deadlines in Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review Final Rule","date":"2025-07-31","url":"https://www.federalregister.gov/documents/2025/07/31/2025-14531/extension-of-deadlines-in-standards-of-performance-for-new-reconstructed-and-modified-sources-and","source_native_id":"2025-14531","status":"fetched","abstract":"The U.S. Environmental Protection Agency (EPA) is taking interim final action to extend certain deadlines within the final rule titled \"Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review,\" 89 FR 16820 (March 8, 2024) (hereafter \"2024 final rule\"). Specifically, the EPA is extending deadlines for certain provisions related to control devices, equipment leaks, storage vessels, process controllers, and covers/closed vent systems in \"Subpart OOOOb--Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After December 6, 2022\" (NSPS OOOOb). The EPA also is extending the date for future implementation of the SuperEmitter Program. Finally, the EPA is extending the state plan submittal deadline in \"Subpart OOOOc--Emissions Guidelines (EG) for Greenhouse Gas Emissions From Existing Crude Oil and Natural Gas Facilities\" (EG OOOOc). The EPA is requesting comments on all aspects of this interim final rule and will consider all comments received in determining whether amendments to this rule are appropriate after the conclusion of the comment period.","action":"Interim final rule; request for comments."},"dockets":["EPA-HQ-OAR-2025-0162"],"rins":["RIN 2060-AW61"],"related":[{"doc_id":127451,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO12866 ONG IFR 12866 Stakeholder Meeting Memo","date":"2025-07-31"},{"doc_id":127452,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO12866 Correspondence EPA Passback 1 Response","date":"2025-07-31"},{"doc_id":127453,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Initiated DRAFT Oil And Gas Interim Final Rule 20250603 Upload Version","date":"2025-07-31"},{"doc_id":127454,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Initated 2025.05.02 Oil and Gas IFR Impacts Memo Clean","date":"2025-07-31"},{"doc_id":127455,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO12866 Correspondence Oil and Gas IFR Passback 2","date":"2025-07-31"},{"doc_id":127456,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO12866 Oil and Gas IFR Passback 1","date":"2025-07-31"},{"doc_id":3832,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Oil and Natural Gas Sector Climate Review: Extension of Deadlines in Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources","date":"2025-12-03"},{"doc_id":3839,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"10.31.2025 Affirmation of Economic Impact Analysis for the Interim Final Rule","date":"2025-12-03"},{"doc_id":127410,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence - EPA Response to OMB Passback 1 10.31.2025","date":"2025-12-03"},{"doc_id":127411,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence OMB Passback 1 ONG IFR Final Rule 10302025","date":"2025-12-03"},{"doc_id":127412,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Initiated Upload Version 12675 EPA-OAR Final Extension of Deadlines NSPS EG Oil and Natural Gas Sector Climate Review eBF Clean re","date":"2025-12-03"},{"doc_id":127413,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Initiated Upload Version Final ONG IFR RTC 10.28.2025 to OMB","date":"2025-12-03"},{"doc_id":127414,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Initiated Upload Version EPA-OAR Extension of Deadlines NSPS EG Oil and Natural Gas Sector Climate Review Impacts Memo 2060-AW61","date":"2025-12-03"},{"doc_id":127415,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence Between OMB and EPA Oil Gas Final Final to IFR","date":"2025-12-03"},{"doc_id":127416,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence OMB Passback 2 ONG IFR Final Rule 11.04.2025","date":"2025-12-03"},{"doc_id":127417,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence - EPA response to OMB passback 211122025","date":"2025-12-03"},{"doc_id":127418,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence OMB Passback 3 ONG IFR Final Rule 11192025","date":"2025-12-03"},{"doc_id":127419,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence EPA response to OMB passback 3 ONG IFR Final Rule 11.19.2025","date":"2025-12-03"},{"doc_id":127420,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Correspondence EPA to OMB Passback 4 ONG IFR Final Rule 11.21.2025","date":"2025-12-03"},{"doc_id":127421,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 11.17.2025  Correspondence Between OMB and EPA Oil Gas Final Final to IFR","date":"2025-12-03"},{"doc_id":127422,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 11.24.2025  Correspondence and Passback Between OMB and EPA Oil Gas Final Final to IFR","date":"2025-12-03"}],"references":[{"citation_id":14943,"raw_reference":"Economic Impact Analysis for the Extension of Deadlines in the NSPS OOOOb and EG OOOOc, is available in the docket.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2025","cited_title":"Economic Impact Analysis for the Extension of Deadlines in the NSPS OOOOb and EG OOOOc","cited_venue":"U.S. Environmental Protection Agency (docket)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"V.A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":14944,"raw_reference":"In a press release dated March 12, 2025, the EPA Administrator announced various reconsideration efforts including NSPS OOOOb and EG OOOOc. https://www.epa.gov/newsreleases/trump-epa-announces-oooo-bc-reconsideration-biden-harris-rules-strangling-american.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2025","cited_title":null,"cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":"https://www.epa.gov/newsreleases/trump-epa-announces-oooo-bc-reconsideration-biden-harris-rules-strangling-american","ref_kind":"news","section":"II.A. Background and Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}