{"document":{"doc_id":30694,"source":"crs","org":"CRS","doc_type":"Reports","title":"Semiconductor Fabrication Facilities Funded by the CHIPS Act: Project Status and Considerations for Congress","date":"2026-07-14","url":"https://www.congress.gov/crs-product/R49031","source_native_id":"R49031","status":"fetched","abstract":null,"action":null},"dockets":[],"rins":[],"related":[],"references":[{"citation_id":416708,"raw_reference":"Akhil Thadani and Gregory Allen, \"Mapping the Semiconductor Supply Chain: The Critical Role of the Indo-Pacific Region,\" May 30, 2023, https://www.csis.org/analysis/mapping-semiconductor-supply-chain-critical-role-indo-pacific-region.","cited_authors":"Akhil Thadani; Gregory Allen","cited_year":"2023","cited_title":"Mapping the Semiconductor Supply Chain: The Critical Role of the Indo-Pacific Region","cited_venue":"Center for Strategic and International Studies","cited_doi":null,"cited_url":"https://www.csis.org/analysis/mapping-semiconductor-supply-chain-critical-role-indo-pacific-region","ref_kind":"other","section":"fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416709,"raw_reference":"Semiconductor Industry Association (SIA), 2025 State of the U.S. Semiconductor Industry, https://www.semiconductors.org/2025-state-of-the-u-s-semiconductor-industry/.","cited_authors":"Semiconductor Industry Association","cited_year":"2025","cited_title":"2025 State of the U.S. Semiconductor Industry","cited_venue":"Semiconductor Industry Association","cited_doi":null,"cited_url":"https://www.semiconductors.org/2025-state-of-the-u-s-semiconductor-industry/","ref_kind":"research_report","section":"fn 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416710,"raw_reference":"David Park, \"Legacy Process Nodes Are Critical To Many Industries,\" Semiconductor Engineering, September 19, 2024.","cited_authors":"David Park","cited_year":"2024","cited_title":"Legacy Process Nodes Are Critical To Many Industries","cited_venue":"Semiconductor Engineering","cited_doi":null,"cited_url":"https://semiengineering.com/legacy-process-nodes-are-critical-to-many-industries/","ref_kind":"news","section":"fn 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416711,"raw_reference":"Arjun Kharpal, \"Memory chip shortage to last through 2027, semiconductor boss says,\" CNBC, January 26, 2026.","cited_authors":"Arjun Kharpal","cited_year":"2026","cited_title":"Memory chip shortage to last through 2027, semiconductor boss says","cited_venue":"CNBC","cited_doi":null,"cited_url":"https://www.cnbc.com/2026/01/26/memory-chip-shortage-synopsys-lenovo-ai-data-centers.html","ref_kind":"news","section":"fn 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416712,"raw_reference":"U.S. Department of Commerce (DOC), Office of Inspector General (OIG), CHIPS Act Programs Status Report, OIG-25-021-I, June 2, 2025, https://www.oig.doc.gov/wp-content/OIGPublications/OIG-25-021-I.pdf.","cited_authors":"U.S. Department of Commerce Office of Inspector General","cited_year":"2025","cited_title":"CHIPS Act Programs Status Report","cited_venue":"U.S. Department of Commerce, Office of Inspector General","cited_doi":null,"cited_url":"https://www.oig.doc.gov/wp-content/OIGPublications/OIG-25-021-I.pdf","ref_kind":"government_report","section":"fn 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416713,"raw_reference":"U.S. Government Accountability Office (GAO), Semiconductors: Information on Projects Funded to Strengthen U.S. Supply Chain, GAO-26-107882, December 11, 2025, https://www.gao.gov/products/gao-26-107882.","cited_authors":"U.S. Government Accountability Office","cited_year":"2025","cited_title":"Semiconductors: Information on Projects Funded to Strengthen U.S. Supply Chain","cited_venue":"U.S. Government Accountability Office","cited_doi":null,"cited_url":"https://www.gao.gov/products/gao-26-107882","ref_kind":"government_report","section":"fn 21","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416714,"raw_reference":"Sujai Shivakumar et al., \"Securing the U.S. Industrial Base in Semiconductors: Investing in a National Champion,\" Center for Strategic and International Studies, August 25, 2025.","cited_authors":"Sujai Shivakumar et al.","cited_year":"2025","cited_title":"Securing the U.S. Industrial Base in Semiconductors: Investing in a National Champion","cited_venue":"Center for Strategic and International Studies","cited_doi":null,"cited_url":"https://www.csis.org/analysis/securing-us-industrial-base-semiconductors-investing-national-champion","ref_kind":"research_report","section":"fn 38","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416715,"raw_reference":"John Ruwitch, \"The U.S. government is taking a stake in Intel. It's rare-and it has some risks,\" NPR, September 6, 2025.","cited_authors":"John Ruwitch","cited_year":"2025","cited_title":"The U.S. government is taking a stake in Intel. It's rare-and it has some risks","cited_venue":"NPR","cited_doi":null,"cited_url":"https://www.npr.org/2025/09/06/nx-s1-5530190/government-stake-intel-ai-competition-china","ref_kind":"news","section":"fn 39","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416716,"raw_reference":"Bilge Erten et al., \"Employment Impacts of the CHIPS Act,\" National Bureau of Economic Research, Working Paper 34625, February 2026, https://www.nber.org/papers/w34625.","cited_authors":"Bilge Erten et al.","cited_year":"2026","cited_title":"Employment Impacts of the CHIPS Act","cited_venue":"National Bureau of Economic Research","cited_doi":"10.3386/w34625","cited_url":"https://www.nber.org/papers/w34625","ref_kind":"working_paper","section":"fn 51","page":null,"context_sentence":null,"paper_id":27683,"paper_title":"Employment Impacts of the CHIPS Act","paper_year":2026,"paper_doi":"10.3386/w34625"},{"citation_id":416717,"raw_reference":"Jon VerWey, \"No Permits, No Fabs: The Importance of Regulatory Reform for Semiconductor Manufacturing,\" Center for Security and Emerging Technology, October 2021.","cited_authors":"Jon VerWey","cited_year":"2021","cited_title":"No Permits, No Fabs: The Importance of Regulatory Reform for Semiconductor Manufacturing","cited_venue":"Center for Security and Emerging Technology","cited_doi":"10.51593/20210053","cited_url":"https://cset.georgetown.edu/publication/no-permits-no-fabs/","ref_kind":"research_report","section":"fn 84","page":null,"context_sentence":null,"paper_id":27682,"paper_title":"No Permits, No Fabs: The Importance of Regulatory Reform for Semiconductor Manufacturing","paper_year":2021,"paper_doi":"10.51593/20210053"},{"citation_id":416718,"raw_reference":"Pete Singer, \"Building Fabs in the U.S. vs Taiwan: Twice as Long, Twice as Much,\" Semiconductor Digest, February 18, 2025.","cited_authors":"Pete Singer","cited_year":"2025","cited_title":"Building Fabs in the U.S. vs Taiwan: Twice as Long, Twice as Much","cited_venue":"Semiconductor Digest","cited_doi":null,"cited_url":"https://www.semiconductor-digest.com/building-fabs-in-the-u-s-vs-taiwan-twice-as-long-twice-as-much/","ref_kind":"news","section":"fn 84","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416719,"raw_reference":"SIA and Oxford Economics, Chipping Away: Assessing and Addressing the Labor Market Gap Facing the U.S. Semiconductor Industry, July 2023.","cited_authors":"Semiconductor Industry Association; Oxford Economics","cited_year":"2023","cited_title":"Chipping Away: Assessing and Addressing the Labor Market Gap Facing the U.S. Semiconductor Industry","cited_venue":"Semiconductor Industry Association and Oxford Economics","cited_doi":null,"cited_url":"https://www.semiconductors.org/wp-content/uploads/2023/07/SIA_July2023_ChippingAway_website.pdf","ref_kind":"research_report","section":"fn 82","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416720,"raw_reference":"John Jacobs, \"Permitting Speeds Up, but 61% of Reviews Are Still Late,\" Bipartisan Policy Center, January 28, 2025.","cited_authors":"John Jacobs","cited_year":"2025","cited_title":"Permitting Speeds Up, but 61% of Reviews Are Still Late","cited_venue":"Bipartisan Policy Center","cited_doi":null,"cited_url":"https://bipartisanpolicy.org/article/permitting-speeds-up-but-61-of-reviews-are-still-late/","ref_kind":"research_report","section":"fn 75","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416721,"raw_reference":"Jake Lai and Zoey Hsu, \"TSMC to Cut Fab14 Mature-Node Capacity by 15%-20% to Reflect Changing Demand Mix,\" Counterpoint, January 22, 2026.","cited_authors":"Jake Lai; Zoey Hsu","cited_year":"2026","cited_title":"TSMC to Cut Fab14 Mature-Node Capacity by 15%-20% to Reflect Changing Demand Mix","cited_venue":"Counterpoint","cited_doi":null,"cited_url":"https://counterpointresearch.com/en/insights/TSMC-to-Cut-Fab14-Mature-Node-Capacity-to-Reflect-Changing-Demand-Mix","ref_kind":"web_page","section":"fn 92","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416722,"raw_reference":"Andrea Shalal et al., \"US examines equity stake in chip makers for CHIPS Act cash grants, sources say,\" Reuters, August 20, 2025.","cited_authors":"Andrea Shalal et al.","cited_year":"2025","cited_title":"US examines equity stake in chip makers for CHIPS Act cash grants, sources say","cited_venue":"Reuters","cited_doi":null,"cited_url":"https://www.reuters.com/business/media-telecom/us-examines-equity-stake-chip-makers-chips-act-cash-grants-sources-say-2025-08-20/","ref_kind":"news","section":"fn 31","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416723,"raw_reference":"Michael Acton and Joe Miller, \"Trump Intel deal designed to block sale of chipmaking unit, CFO says,\" Financial Times, August 28, 2025.","cited_authors":"Michael Acton; Joe Miller","cited_year":"2025","cited_title":"Trump Intel deal designed to block sale of chipmaking unit, CFO says","cited_venue":"Financial Times","cited_doi":null,"cited_url":"https://www.ft.com/content/29fb5020-2b25-429a-b63f-18356b467e7a","ref_kind":"news","section":"fn 37","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416724,"raw_reference":"Christine Mui and Brendan Bordelon, \"Biden's high-tech legacy fraying even before Election Day,\" Politico, November 2, 2024.","cited_authors":"Christine Mui; Brendan Bordelon","cited_year":"2024","cited_title":"Biden's high-tech legacy fraying even before Election Day","cited_venue":"Politico","cited_doi":null,"cited_url":"https://www.politico.com/news/2024/11/02/biden-tech-chips-achievement-losing-support-00186851","ref_kind":"news","section":"fn 52","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416725,"raw_reference":"Kate Magill, \"Lutnick says Commerce Department 'renegotiating' CHIPS contracts,\" Manufacturing Dive, June 5, 2025.","cited_authors":"Kate Magill","cited_year":"2025","cited_title":"Lutnick says Commerce Department 'renegotiating' CHIPS contracts","cited_venue":"Manufacturing Dive","cited_doi":null,"cited_url":"https://www.manufacturingdive.com/news/lutnick-chips-act-renegotiating-contracts-trump-budget-bill/749857/","ref_kind":"news","section":"fn 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416726,"raw_reference":"Drake, John and Jordan Crenshaw, \"Congress Must Fund Semiconductor Legislation to Bolster Innovation and Supply Chains,\" U.S. Chamber of Commerce, November 22, 2021.","cited_authors":"John Drake; Jordan Crenshaw","cited_year":"2021","cited_title":"Congress Must Fund Semiconductor Legislation to Bolster Innovation and Supply Chains","cited_venue":"U.S. Chamber of Commerce","cited_doi":null,"cited_url":"https://www.uschamber.com/security/congress-must-fund-semiconductor-legislation-to-bolster-innovation-and-supply-chains","ref_kind":"web_page","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416727,"raw_reference":"Sebastian Obando, \"Labor shortages delay Arizona chip plant opening until 2025,\" Construction Dive, July 21, 2023.","cited_authors":"Sebastian Obando","cited_year":"2023","cited_title":"Labor shortages delay Arizona chip plant opening until 2025","cited_venue":"Construction Dive","cited_doi":null,"cited_url":"https://www.constructiondive.com/news/labor-shortages-delay-arizona-chip-tsmc-plant-2025/688661/","ref_kind":"news","section":"Labor Availability","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":416728,"raw_reference":"Anton Shilov, \"TSMC delays 3nm Arizona fab by a year, cites lack of U.S. subsidies and waning demand,\" Tom's Hardware, January 18, 2024.","cited_authors":"Anton Shilov","cited_year":"2024","cited_title":"TSMC delays 3nm Arizona fab by a year, cites lack of U.S. subsidies and waning demand","cited_venue":"Tom's Hardware","cited_doi":null,"cited_url":"https://www.tomshardware.com/tech-industry/tsmc-delays-3nm-arizona-fab-by-a-year-cites-lack-of-us-subsidies-and-waning-demand","ref_kind":"news","section":"fn 48","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}