DOI. Bureau of Ocean Energy Management (BOEM). 2016. Outer Continental Shelf Oil and Gas Leasing Program: 2017-2022. Final Environmental Impact Statement. U.S. Dept. of the Interior, Bureau of Ocean Energy Management, Sterling, VA. OCS
EIS/EIA BOEM 2016-060. Accessible at https://www.boem.gov/National-OCS-Program-for2017-2022/.
DOI. BOEM. 2012. Outer Continental Shelf Oil and Gas Leasing Program: 2012-2017. Final Programmatic Environmental Impact Statement. U.S. Department of the Interior, Bureau of Ocean Energy Management, Herndon, Virginia. OCS EIS/EA, BOEM 2012-030. Accessible at https://www.boem.gov/5-year/2012-2017/PEIS/.
DOI. Bureau of Safety and Environmental Enforcement (BSEE) and BOEM. 2016. Programmatic Environmental Assessment of the Use of Well Stimulation Treatments on the Pacific Outer Continental Shelf. Final Programmatic Environmental Assessment. U.S. Department of the
NOAA, 2012. Natural Resource Damage Assessment Status Update for the Deepwater Horizon Oil Spill, April. Electronically available at: http://www.gulfspillrestoration.noaa.gov/sites/default/files/wpcontent/uploads/FINAL_NRDA_StatusUpdate_April2012.pdf
SPPE to ensure it will function in the full range of operating conditions for which it is designed. Where there is a gap in the API standards, BSEE addresses this by requiring the third party review and certification for SPPE devices that are removed from service and moved to another location. With respect to the safety system drawings and diagrams that no longer require a PE seal, BSEE recognizes that there are limitations as to which documents that a PE may seal. Based on those limitations, BSEE has concluded that it is impractical to impose such a requirement in the full range of contexts identified by existing regulations. However, the operator is ultimately responsible for submitting reliable, accurate safety system diagrams and drawings to BSEE. While a seal would not be required for certain documents, the operator would still be required to certify that the documents they submit have been reviewed for compliance with applicable regulations and accurately represent the new or modified system as installed. Therefore, any potential change in the BSEE’s ability to manage potential safety and environmental protection risks as a result of the 2018 Final Rule are expected to be minimal.
Overall, the preferred alternative (2018 Final Rule) is expected to reduce unnecessarily burdensome regulatory requirements while ensuring safety and environmental protection.
David S. Fish Chief, Environmental Compliance Division 25 September, 2018 ___________________________ Date