{"document":{"doc_id":2914,"source":"cbo_other","org":"CBO","doc_type":null,"title":"Overview of Electric Transmission","date":"2026-08-27","url":"https://www.cbo.gov/publication/62705","source_native_id":"62705","status":"fetched","abstract":null,"action":null},"dockets":[],"rins":[],"related":[],"references":[{"citation_id":87390,"raw_reference":"Adler, David. 2024. How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector, Working Paper 2024-02 (Congressional Budget Office, May), www.cbo.gov/publication/59880.","cited_authors":"David Adler","cited_year":"2024","cited_title":"How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector","cited_venue":"Congressional Budget Office, Working Paper 2024-02","cited_doi":null,"cited_url":"www.cbo.gov/publication/59880","ref_kind":"working_paper","section":"Slide 7","page":null,"context_sentence":"(2023) for 1978-1999 and 2004-2016; Congressional Budget Office, using data from Adler (2024) and FERC (2023-2026) for 2017-2024.","paper_id":60008,"paper_title":"How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector: Working Paper 2024-02","paper_year":2024,"paper_doi":null},{"citation_id":87391,"raw_reference":"Blanford, Geoff, Tom Wilson, John Bistline, and Nils Johnson. 2026. Powering Intelligence 2026, Electric Power Research Institute (February), https://powering-intelligence.epri.com/.","cited_authors":"Geoff Blanford, Tom Wilson, John Bistline, Nils Johnson","cited_year":"2026","cited_title":"Powering Intelligence 2026","cited_venue":"Electric Power Research Institute","cited_doi":null,"cited_url":"https://powering-intelligence.epri.com/","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87392,"raw_reference":"BloombergNEF. 2025. AI and the Power Grid: Where the Rubber Meets the Road (December), https://tinyurl.com/57r8tx75.","cited_authors":"BloombergNEF","cited_year":"2025","cited_title":"AI and the Power Grid: Where the Rubber Meets the Road","cited_venue":"BloombergNEF","cited_doi":null,"cited_url":"https://tinyurl.com/57r8tx75","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87393,"raw_reference":"Davis, Lucas W., Catherine Hausman, and Nancy L. Rose. 2023. Transmission Impossible? Prospects for Decarbonizing the US Grid, Journal of Economic Perspectives, vol. 37 no. 4, pp. 155–180, https://dx.doi.org/10.1257/jep.37.4.155.","cited_authors":"Lucas W. Davis, Catherine Hausman, Nancy L. Rose","cited_year":"2023","cited_title":"Transmission Impossible? Prospects for Decarbonizing the US Grid","cited_venue":"Journal of Economic Perspectives","cited_doi":"10.1257/jep.37.4.155","cited_url":"https://dx.doi.org/10.1257/jep.37.4.155","ref_kind":"journal_article","section":"Slide 11","page":null,"context_sentence":"Growth of Transmission Might Lag Demand Growth Recent studies conclude that significant growth in new transmission capacity will be necessary to meet higher levels of future electricity demand. National Transmission Planning Study (DOE 2024): 2.1-2.6 times 2020 levels by 2050 (average growth of 2.5-3.2 percent per year) However, annual transmission growth in recent years has averaged 0.6 percent. Some researchers posit that regulatory constraints are reducing the buildout of new transmission lines (Davis, Hausman, and Rose 2023; DeLosa, Pfeifenberger, and Joskow 2024; Hausman 2025).","paper_id":17155,"paper_title":"Transmission Impossible? Prospects for Decarbonizing the US Grid","paper_year":2023,"paper_doi":"10.1257/jep.37.4.155"},{"citation_id":87394,"raw_reference":"DeLosa III, Joe, Johannes P. Pfeifenberger, and Paul Joskow. 2024. Regulation of Access, Pricing and Planning of High Voltage Transmission in the United States, National Bureau of Economic Research, Working Paper 32254 (March), www.nber.org/papers/w32254.","cited_authors":"Joe DeLosa III, Johannes P. Pfeifenberger, Paul Joskow","cited_year":"2024","cited_title":"Regulation of Access, Pricing and Planning of High Voltage Transmission in the United States","cited_venue":"National Bureau of Economic Research, Working Paper 32254","cited_doi":"10.3386/w32254","cited_url":"www.nber.org/papers/w32254","ref_kind":"working_paper","section":"Slide 11","page":null,"context_sentence":null,"paper_id":50099,"paper_title":"Regulation of Access, Pricing, and Planning of High Voltage Transmission in the U.S.","paper_year":2024,"paper_doi":"10.3386/w32254"},{"citation_id":87395,"raw_reference":"Denman, Aaron, Maeghan Rouch, Peter Hanbury, Padraic Brick, and Tatum Quinn. 2025. Can the U.S. Energy Grid Keep Up With AI Data Centers? (Bain and Company, October), https://tinyurl.com/3drhjpk6.","cited_authors":"Aaron Denman, Maeghan Rouch, Peter Hanbury, Padraic Brick, Tatum Quinn","cited_year":"2025","cited_title":"Can the U.S. Energy Grid Keep Up With AI Data Centers?","cited_venue":"Bain and Company","cited_doi":null,"cited_url":"https://tinyurl.com/3drhjpk6","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87396,"raw_reference":"Department of Energy. 2023. National Transmission Needs Study (October), www.energy.gov/oe/national-transmission-needs-study.","cited_authors":"Department of Energy","cited_year":"2023","cited_title":"National Transmission Needs Study","cited_venue":"Department of Energy","cited_doi":null,"cited_url":"www.energy.gov/oe/national-transmission-needs-study","ref_kind":"government_report","section":"Slide 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87397,"raw_reference":"Department of Energy. 2024. National Transmission Planning Study (October), www.energy.gov/gdo/national-transmission-planning-study.","cited_authors":"Department of Energy","cited_year":"2024","cited_title":"National Transmission Planning Study","cited_venue":"Department of Energy","cited_doi":null,"cited_url":"www.energy.gov/gdo/national-transmission-planning-study","ref_kind":"government_report","section":"Slide 11","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87398,"raw_reference":"Edison Electric Institute. 2026. Actual and Projected Transmission Investment (January), https://tinyurl.com/546rs76v.","cited_authors":"Edison Electric Institute","cited_year":"2026","cited_title":"Actual and Projected Transmission Investment","cited_venue":"Edison Electric Institute","cited_doi":null,"cited_url":"https://tinyurl.com/546rs76v","ref_kind":"research_report","section":"Slide 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87399,"raw_reference":"Elmendorf, Douglas W., R. Glenn Hubbard, and Zachary Liscow. 2025. Policies to Reduce Federal Budget Deficits by Increasing Economic Growth. Working Paper 33834 (National Bureau of Economic Research, May), http://dx.doi.org/10.3386/w33834.","cited_authors":"Douglas W. Elmendorf, R. Glenn Hubbard, Zachary Liscow","cited_year":"2025","cited_title":"Policies to Reduce Federal Budget Deficits by Increasing Economic Growth","cited_venue":"National Bureau of Economic Research, Working Paper 33834","cited_doi":"10.3386/w33834","cited_url":"http://dx.doi.org/10.3386/w33834","ref_kind":"working_paper","section":"Slide 28","page":null,"context_sentence":null,"paper_id":18016,"paper_title":"Policies to Reduce Federal Budget Deficits by Increasing Economic Growth","paper_year":2025,"paper_doi":"10.3386/w33834"},{"citation_id":87400,"raw_reference":"Energy Information Administration. 2026a. Energy Explained (accessed May 2026), https://tinyurl.com/mtnrz3mv.","cited_authors":"Energy Information Administration","cited_year":"2026","cited_title":"Energy Explained","cited_venue":"Energy Information Administration","cited_doi":null,"cited_url":"https://tinyurl.com/mtnrz3mv","ref_kind":"web_page","section":"Slide 5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87401,"raw_reference":"Energy Information Administration. 2026b. Annual Energy Outlook 2026 (April), www.eia.gov/outlooks/aeo/index.php.","cited_authors":"Energy Information Administration","cited_year":"2026","cited_title":"Annual Energy Outlook 2026","cited_venue":"Energy Information Administration","cited_doi":null,"cited_url":"www.eia.gov/outlooks/aeo/index.php","ref_kind":"government_report","section":"Slide 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87402,"raw_reference":"Energy Information Administration. 2026c. Monthly Energy Review (April), www.eia.gov/totalenergy/data/monthly/index.php.","cited_authors":"Energy Information Administration","cited_year":"2026","cited_title":"Monthly Energy Review","cited_venue":"Energy Information Administration","cited_doi":null,"cited_url":"www.eia.gov/totalenergy/data/monthly/index.php","ref_kind":"dataset","section":"Slide 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87403,"raw_reference":"Federal Energy Regulatory Commission. 2023–2026. Office of Energy Projects, Energy Infrastructure Update (Staff Reports and Papers, April 2026, April 2025, May 2024, February 2023), www.ferc.gov/staff-reports-and-papers.","cited_authors":"Federal Energy Regulatory Commission","cited_year":"2023–2026","cited_title":"Energy Infrastructure Update","cited_venue":"Federal Energy Regulatory Commission, Office of Energy Projects","cited_doi":null,"cited_url":"www.ferc.gov/staff-reports-and-papers","ref_kind":"government_report","section":"Slide 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87404,"raw_reference":"Federal Energy Regulatory Commission. 2025. An Introductory Guide to Electricity Markets Regulated by the Federal Energy Regulatory Commission (last updated April 2025), https://tinyurl.com/2rdbj6e7.","cited_authors":"Federal Energy Regulatory Commission","cited_year":"2025","cited_title":"An Introductory Guide to Electricity Markets Regulated by the Federal Energy Regulatory Commission","cited_venue":"Federal Energy Regulatory Commission","cited_doi":null,"cited_url":"https://tinyurl.com/2rdbj6e7","ref_kind":"government_report","section":"Slide 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87405,"raw_reference":"Goldman Sachs. 2025. How AI Is Transforming Data Centers and Ramping Up Power Demand (August), https://tinyurl.com/9ufxymdd.","cited_authors":"Goldman Sachs","cited_year":"2025","cited_title":"How AI Is Transforming Data Centers and Ramping Up Power Demand","cited_venue":"Goldman Sachs","cited_doi":null,"cited_url":"https://tinyurl.com/9ufxymdd","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87406,"raw_reference":"Government Accountability Office. 2019. Critical Infrastructure Protection: Action Needed to Address Significant Cybersecurity Risks Facing the Electric Grid (August), www.gao.gov/products/gao-19-332.","cited_authors":"Government Accountability Office","cited_year":"2019","cited_title":"Critical Infrastructure Protection: Action Needed to Address Significant Cybersecurity Risks Facing the Electric Grid","cited_venue":"Government Accountability Office","cited_doi":null,"cited_url":"www.gao.gov/products/gao-19-332","ref_kind":"government_report","section":"Slide 13","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87407,"raw_reference":"Green, Alastair, Humayun Tai, Jesse Noffsinger, Pankaj Sachdeva, Arjita Bhan, and Raman Sharma. 2024. How Data Centers and the Energy Sector Can Sate AI's Hunger for Power (McKinsey and Company, September), https://tinyurl.com/46ms7mfe.","cited_authors":"Alastair Green, Humayun Tai, Jesse Noffsinger, Pankaj Sachdeva, Arjita Bhan, Raman Sharma","cited_year":"2024","cited_title":"How Data Centers and the Energy Sector Can Sate AI's Hunger for Power","cited_venue":"McKinsey and Company","cited_doi":null,"cited_url":"https://tinyurl.com/46ms7mfe","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87448,"raw_reference":"Hausman, Catherine. 2025. Power Flows: Transmission Lines, Allocative Efficiency, and Corporate Profits, American Economic Review, vol. 155 no. 8 (August), pp. 2574–2615, https://dx.doi.org/10.1257/aer.20240276.","cited_authors":"Catherine Hausman","cited_year":"2025","cited_title":"Power Flows: Transmission Lines, Allocative Efficiency, and Corporate Profits","cited_venue":"American Economic Review","cited_doi":"10.1257/aer.20240276","cited_url":"https://dx.doi.org/10.1257/aer.20240276","ref_kind":"journal_article","section":"Slide 26","page":null,"context_sentence":"Growth of Transmission Might Lag Demand Growth Recent studies conclude that significant growth in new transmission capacity will be necessary to meet higher levels of future electricity demand. National Transmission Planning Study (DOE 2024): 2.1-2.6 times 2020 levels by 2050 (average growth of 2.5-3.2 percent per year) However, annual transmission growth in recent years has averaged 0.6 percent. Some researchers posit that regulatory constraints are reducing the buildout of new transmission lines (Davis, Hausman, and Rose 2023; DeLosa, Pfeifenberger, and Joskow 2024; Hausman 2025).","paper_id":18030,"paper_title":"Power Flows: Transmission Lines, Allocative Efficiency, and Corporate Profits","paper_year":2025,"paper_doi":"10.1257/aer.20240276"},{"citation_id":87449,"raw_reference":"International Energy Agency. 2025. Energy and AI (April), www.iea.org/reports/energy-and-ai.","cited_authors":"International Energy Agency","cited_year":"2025","cited_title":"Energy and AI","cited_venue":"International Energy Agency","cited_doi":null,"cited_url":"www.iea.org/reports/energy-and-ai","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87450,"raw_reference":"James, Sarah, Tony Lenoir, Ben Levitt, Dan Thompson, and Adam Wilson. 2026. AI Infrastructure Growing Pains: Ensuring Energy Resilience Amid Grid Constraints and Public Demands (S&P Global webinar, June), https://tinyurl.com/4wze959b.","cited_authors":"Sarah James, Tony Lenoir, Ben Levitt, Dan Thompson, Adam Wilson","cited_year":"2026","cited_title":"AI Infrastructure Growing Pains: Ensuring Energy Resilience Amid Grid Constraints and Public Demands","cited_venue":"S&P Global","cited_doi":null,"cited_url":"https://tinyurl.com/4wze959b","ref_kind":"web_page","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87451,"raw_reference":"Jenkins, Jesse D., Erin N. Mayfield, Jamil Farbes, Greg Schivley, Neha Patankar, and Ryan Jones. 2023. Climate Progress and the 117th Congress: The Impacts of the Inflation Reduction Act and the Infrastructure Investment and Jobs Act (REPEAT Project, July), http://dx.doi.org/10.5281/zenodo.8087805.","cited_authors":"Jesse D. Jenkins, Erin N. Mayfield, Jamil Farbes, Greg Schivley, Neha Patankar, Ryan Jones","cited_year":"2023","cited_title":"Climate Progress and the 117th Congress: The Impacts of the Inflation Reduction Act and the Infrastructure Investment and Jobs Act","cited_venue":"REPEAT Project","cited_doi":"10.5281/zenodo.8087805","cited_url":"http://dx.doi.org/10.5281/zenodo.8087805","ref_kind":"research_report","section":"Slide 7","page":null,"context_sentence":null,"paper_id":18031,"paper_title":"Climate Progress and the 117th Congress: The Impacts of the Inflation Reduction Act and Infrastructure Investment and Jobs Act","paper_year":2023,"paper_doi":"10.5281/zenodo.8087805"},{"citation_id":87452,"raw_reference":"Lee, Vivian. 2024. U.S. Data Center Power Outlook: Balancing Competing Power Consumption Needs (Boston Consulting Group, June), https://tinyurl.com/2uxymp3p.","cited_authors":"Vivian Lee","cited_year":"2024","cited_title":"U.S. Data Center Power Outlook: Balancing Competing Power Consumption Needs","cited_venue":"Boston Consulting Group","cited_doi":null,"cited_url":"https://tinyurl.com/2uxymp3p","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87453,"raw_reference":"Lyons, Cristin, and Greg Litra. 2024. Transmission in the United States: What Makes Developing Electric Transmission So Hard? An Update (ScottMadden Management Consultants), https://tinyurl.com/mrar8bdk.","cited_authors":"Cristin Lyons, Greg Litra","cited_year":"2024","cited_title":"Transmission in the United States: What Makes Developing Electric Transmission So Hard? An Update","cited_venue":"ScottMadden Management Consultants","cited_doi":null,"cited_url":"https://tinyurl.com/mrar8bdk","ref_kind":"research_report","section":"Slide 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87454,"raw_reference":"Macey, Joshua C. 2024. Outsourcing Electricity Market Design, University of Chicago Law Review, vol. 91, no. 5, pp. 1243–1330, https://tinyurl.com/mv4dy8tv.","cited_authors":"Joshua C. Macey","cited_year":"2024","cited_title":"Outsourcing Electricity Market Design","cited_venue":"University of Chicago Law Review","cited_doi":"10.2139/ssrn.4942227","cited_url":"https://tinyurl.com/mv4dy8tv","ref_kind":"journal_article","section":"Slide 25","page":null,"context_sentence":"Federal Elements Cost allocation is the process by which costs of a transmission line are assigned to the entities responsible for paying for it. The state PUC (or similar) reviews proposed transmission investments. If a project is deemed necessary, costs are allocated to the utility's customers in rate hearings. Scope of cost allocation differs between regulated and deregulated states. Some states have right of first refusal (ROFR) laws; the utility must decline to build a transmission line before any other entity can build it. FERC cost causation principle: Costs are allocated proportionally to benefits. No standardized method; grid operators and states can define their own approach (Macey and Mays 2024).","paper_id":18058,"paper_title":"Outsourcing Electricity Market Design","paper_year":2024,"paper_doi":"10.2139/ssrn.4942227"},{"citation_id":87455,"raw_reference":"Macey, Joshua, and Jacob Mays. 2024. The Law and Economics of Transmission Planning and Cost Allocation, Energy Law Journal, vol. 45 no. 2, pp. 209–249, https://dx.doi.org/10.2139/ssrn.5018777.","cited_authors":"Joshua Macey, Jacob Mays","cited_year":"2024","cited_title":"The Law and Economics of Transmission Planning and Cost Allocation","cited_venue":"Energy Law Journal","cited_doi":"10.2139/ssrn.5018777","cited_url":"https://dx.doi.org/10.2139/ssrn.5018777","ref_kind":"journal_article","section":"Slide 21","page":null,"context_sentence":"Federal Elements Cost allocation is the process by which costs of a transmission line are assigned to the entities responsible for paying for it. The state PUC (or similar) reviews proposed transmission investments. If a project is deemed necessary, costs are allocated to the utility's customers in rate hearings. Scope of cost allocation differs between regulated and deregulated states. Some states have right of first refusal (ROFR) laws; the utility must decline to build a transmission line before any other entity can build it. FERC cost causation principle: Costs are allocated proportionally to benefits. No standardized method; grid operators and states can define their own approach (Macey and Mays 2024).","paper_id":18032,"paper_title":"THE LAW AND ECONOMICS OF TRANSMISSION PLANNING AND COST ALLOCATION","paper_year":2024,"paper_doi":"10.2139/ssrn.5018777"},{"citation_id":87456,"raw_reference":"Mulvaney, Katie, Katie Siegner, Chaz Teplin, and Sarah Toth. 2024. GETting Interconnected in PJM: Grid-Enhancing Technologies (GETs) Can Increase the Speed and Scale of New Entry from PJM's Queue (RMI, February), https://tinyurl.com/45ttspdw.","cited_authors":"Katie Mulvaney, Katie Siegner, Chaz Teplin, Sarah Toth","cited_year":"2024","cited_title":"GETting Interconnected in PJM: Grid-Enhancing Technologies (GETs) Can Increase the Speed and Scale of New Entry from PJM's Queue","cited_venue":"RMI","cited_doi":null,"cited_url":"https://tinyurl.com/45ttspdw","ref_kind":"research_report","section":"Slide 29","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87457,"raw_reference":"Mural, Rachel, Dipesh Pherwani, Chaitanya Gupta, et al. 2026. AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment (Harvard Kennedy School, February), https://tinyurl.com/ymwesmkb.","cited_authors":"Rachel Mural, Dipesh Pherwani, Chaitanya Gupta, et al.","cited_year":"2026","cited_title":"AI, Data Centers, and the U.S. Electric Grid: A Watershed Moment","cited_venue":"Harvard Kennedy School","cited_doi":null,"cited_url":"https://tinyurl.com/ymwesmkb","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87458,"raw_reference":"Paltsev, Sergey, C. Adam Schossler, Etienne Berthet, et al. 2025. 2025 Global Change Outlook (Massachusetts Institute of Technology), https://tinyurl.com/yc38e7mw.","cited_authors":"Sergey Paltsev, C. Adam Schossler, Etienne Berthet, et al.","cited_year":"2025","cited_title":"2025 Global Change Outlook","cited_venue":"Massachusetts Institute of Technology","cited_doi":null,"cited_url":"https://tinyurl.com/yc38e7mw","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87459,"raw_reference":"Pfeifenberger, Johannes, and Peter Heller. 2025. Interregional Transmission and Benefits From Improved Planning (Brattle Group, December), https://tinyurl.com/3fpr6mjn.","cited_authors":"Johannes Pfeifenberger, Peter Heller","cited_year":"2025","cited_title":"Interregional Transmission and Benefits From Improved Planning","cited_venue":"Brattle Group","cited_doi":null,"cited_url":"https://tinyurl.com/3fpr6mjn","ref_kind":"research_report","section":"Slide 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87460,"raw_reference":"Pfeifenberger, Johannes, Judy Chang, Akarsh Sheilendranath, J. Michael Hagerty, Simon Levin, and Wren Jiang. 2019. Cost Savings Offered by Competition in Electric Transmission (Brattle Group, April), https://tinyurl.com/yajnjjfh.","cited_authors":"Johannes Pfeifenberger, Judy Chang, Akarsh Sheilendranath, J. Michael Hagerty, Simon Levin, Wren Jiang","cited_year":"2019","cited_title":"Cost Savings Offered by Competition in Electric Transmission","cited_venue":"Brattle Group","cited_doi":null,"cited_url":"https://tinyurl.com/yajnjjfh","ref_kind":"research_report","section":"Slide 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87461,"raw_reference":"Pfeifenberger, Johannes, Kasparas Spokas, J. Michael Hagerty, et al. 2021. Transmission Planning for the 21st Century: Proven Practices That Increase Value and Reduce Costs (Brattle Group and Grid Strategies, October), https://tinyurl.com/3zjz7a8k.","cited_authors":"Johannes Pfeifenberger, Kasparas Spokas, J. Michael Hagerty, et al.","cited_year":"2021","cited_title":"Transmission Planning for the 21st Century: Proven Practices That Increase Value and Reduce Costs","cited_venue":"Brattle Group and Grid Strategies","cited_doi":null,"cited_url":"https://tinyurl.com/3zjz7a8k","ref_kind":"research_report","section":"Slide 20","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":87462,"raw_reference":"Smith, Sarah J., Alex Hubbard, Alex Newkirk, et al. 2026. United States Data Center Energy Usage Report: 2025 Update (Lawrence Berkeley National Laboratory, June), https://doi.org/10.71468/P1RP4F.","cited_authors":"Sarah J. Smith, Alex Hubbard, Alex Newkirk, et al.","cited_year":"2026","cited_title":"United States Data Center Energy Usage Report: 2025 Update","cited_venue":"Lawrence Berkeley National Laboratory","cited_doi":"10.71468/p1rp4f","cited_url":"https://doi.org/10.71468/P1RP4F","ref_kind":"research_report","section":"Slide 10","page":null,"context_sentence":null,"paper_id":18034,"paper_title":"United States Data Center Energy Usage Report: 2025 Update","paper_year":2026,"paper_doi":"10.71468/p1rp4f"},{"citation_id":87463,"raw_reference":"Van Nostrand, James. 2026. High Natural Gas, High Electricity Prices (Kleinman Center, Implications of Rising Energy Costs: A Kleinman Center and Perry World House Q&A, May), https://tinyurl.com/e7pksbmv.","cited_authors":"James Van Nostrand","cited_year":"2026","cited_title":"High Natural Gas, High Electricity Prices","cited_venue":"Kleinman Center","cited_doi":null,"cited_url":"https://tinyurl.com/e7pksbmv","ref_kind":"web_page","section":"Slide 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}