NUREG-1569_2003 Standard Review Plan for In Situ Leach Uranium Extraction License Applications
Other documents for the same rulemaking (all, by stage)
References: 75 extracted, 1 linked to papers
Application, Including Environment Report (NRC, 1982) concerning human residences, nearest site boundary(ies) to residences, surface- and ground-water use, and projected water use, is provided. As described in Section 2.2 of the Standard Format and Content of License Application, Including Environment Report (NRC, 1982), appropriate presentation of the data should include mapped data as appropriate, a tabular summary for each of the 22½-degree sectors centered on the 16 cardinal compass points, and for each, the distance from the center of the site to the site boundary and the nearest residence. Site Characterization Data sources are documented in reports such as U.S. Geological Survey open files or existing published reports or maps. If data have been generated by the applicant, the data documentation should include a description of the investigations and data reduction techniques. Maps include designation of scale, orientation (e.g., north arrow), and geographic coordinates. 2.2.4 Evaluation Findings If the staff review as described in this section results in the acceptance of the described uses of adjacent lands and waters, the following conclusions may be presented in the technical evaluation report and in the environmental assessment.
Standards Development. 1982. –––––. NUREG–1748, “Environmental Review Guidance for Licensing Actions Associated with
NMSS Programs.” Washington, DC: NRC. 2001.
Management, 2001). If the rating is below 19 (scale of 0 to 33), no special management is required. If the rating is 19 or above, the application provides a management plan for minimizing the impact of the proposed facility. 2.4.4 Evaluation Findings If the staff review as described in this section results in the acceptance of the characterization of the historic, scenic, and cultural resources the following conclusions may be presented in the environmental assessment.
Interior. 1995. –––––. “Guidelines for Evaluating and Documenting Traditional Cultural Properties. National Register Bulletin No. 38. Washington, DC: National Park Service, U.S. Department of the
Interior. 1990. –––––. “Preparation of Environmental Statements: Guidelines for Discussion of Cultural (Historic, Archeological, Architectural) Resources.” Washington, DC: National Park
Service. 1973. NRC. NUREG–1748, “Environmental Review Guidance for Licensing Actions Associated with
Standards Development. 1988. –––––. Regulatory Guide 3.46, “Standard Format and Content of License Applications, Including Environmental Reports, for In Situ Uranium Solution Mining.” Washington, DC: NRC, Office of Standards Development. 1982. Geology and Seismology 2.6.1 Areas of Review The reviewer should examine information on the geologic aspects of the site acquired through standard geologic analyses, including a survey of pertinent literature and field investigations. This information should include regional seismicity and seismic history, local stratigraphy, petrology or lithology of rock units, tectonic features (faulting, folding, fracturing), and the continuity of the geologic strata at the site and in nearby regions.
Materials. 2001. –––––. “Standard Guide for Sampling Groundwater Monitoring Wells.” Guide D4448-85a. West Conshohcken, Pennsylvania: American Society for Testing and Materials. 1992.
USGS Water Supply Paper No. 1887. Denver, Colorado: U.S. Geological Survey. 1977.
USGS Water Supply Paper 1473. Denver, Colorado: U.S. Geological Survey. 1970.
Lohman, S.W. “Groundwater Hydraulics.” USGS Professional Paper 708. Reston, Virginia: U.S. Geological Survey. 1979. 2-27 Site Characterization
Washington, DC: NRC. 2002. U.S. Army Corps of Engineers. “Flood Hydrograph Package.” HEC–1. Washington, DC: U.S. Army Corps of Engineers, Hydrologic Engineering Center. 1997a. –––––. “Water Surface Profiles.” HEC–2. Davis, California: Hydrologic Engineering
Center. 1997b. –––––. “Wave Runup and Wind Setup on Reservoir Embankments.”
NUREG–1575, Revision 1, “Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). For license renewals and amendment applications, Appendix A to this standard review plan provides guidance for examining facility operations and the approach that should be used in evaluating amendments and renewal applications. 2.9.3 Acceptance Criteria The characterization of the site background radiological characteristics is acceptable if it meets the following criteria: Monitoring programs to establish background radiological characteristics, including sampling frequency, sampling methods, and sampling location and density are established in accordance with pre-operational monitoring guidance provided in Regulatory Guide 4.14, Revision 1, Section 1.1 (NRC, 1980). Air monitoring stations are located in a manner consistent with the principal wind directions reviewed in Section 2.5 of the standard review plan. Soil sampling is conducted at both a 5-cm [2-inch] depth as described in Regulatory Guide 4.14, Section 1.1.4 (NRC, 1980) and 15 cm [6 in] for background decommissioning data. 2-32 Site Characterization 2.9.4 Evaluation Findings If the staff review, as described in this section, results in the acceptance of the description of the site background radiological characteristics, the following conclusions may be presented in the technical evaluation report and in the environmental assessment.
Berger, J.D. NUREG/CR–5849, “Manual for Conducting Radiological Surveys in Support of License Termination.” Washington, DC: NRC. 1992.
NRC. Regulatory Guide 4.14, “Radiological Effluent and Environmental Monitoring at Uranium Mills.” Revision 1. Washington, DC: NRC, Office of Standards Development. 1980. –––––. “Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).” Revision 1. Washington, DC: NRC. 2000.
Inc. 1989. NRC. “Recommendation on Ways to Improve the Efficiency of NRC Regulation at In Situ Leach Uranium Recovery Facilities.” SECY–99–0013. Washington, DC: NRC. 2000. –––––. NUREG–1623, “Design of Erosion Protection for Long-Term Stabilization.”
Washington, DC: NRC. 1998. –––––. Regulatory Guide 3.11, “Design, Construction, and Inspection of Embankment Retention Systems for Uranium Mills.” Washington, DC: NRC, Office of Standards
Specifications, quantities, locations, and operating conditions such as flow rates, temperatures, and pressures of radioactive materials and those hazardous materials with the potential to impact radiological safety, are clearly identified together with the hazards associated with these materials. A list of applicable federal, state and local regulations that the licensee intends to use to ensure that process chemicals having the potential to impact radiological safety are Description of Proposed Facility safely handled, is provided. Controls used for eliminating or mitigating the hazards presented by the radioactive materials and those hazardous materials with the potential to impact radiological safety, are adequately described. Further discussion on Criteria 4–7 may be found in NUREG/CR–6733 (NRC, 2001). 3.2.4 Evaluation Findings If the staff review as described in this section results in the acceptance of the equipment used and materials processed in the in situ leach facility, the following conclusions may be presented in the technical evaluation report.
NRC. Regulatory Guide 3.11.1 “Operational Inspection and Surveillance of Embankment Retention Systems for Uranium Mill Tailings.” Revision 1. Washington, DC: NRC. 1980. –––––. Regulatory Guide 3.11, “Design, Construction, and Inspection of Embankment Retention Systems for Uranium Mills.” Washington, DC: NRC, Office of Standards
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. Regulatory Guide 4.15, “Quality Assurance for Radiological Monitoring Programs (Normal Operations)–Effluent Streams and the Environment.” Revision 1. Washington, DC:
NRC, Office of Standards Development. 1979. –––––. Regulatory Guide 8.2, “Guide for Administrative Practices in Radiation Monitoring.”
DC: NRC, Office of Nuclear Regulatory Research. 2002. ––– Regulatory Guide 3.11.1, Revision 1, “Operational Inspection and Surveillance of Embankment Retention Systems for Uranium Mills.” Washington, DC: NRC, Office of
DC: NRC, Office of Nuclear Regulatory Research. 2002. 5-10 Operations ––– Regulatory Guide 3.11.1, Revision 1, “Operational Inspection and Surveillance of Embankment Retention Systems for Uranium Mills.” Washington, DC: NRC, Office of
Standards Development. 1980. –––––. Regulatory Guide 3.11, “Design, Construction, and Inspection of Embankment Retention Systems for Uranium Mills.” Revision 2. Washington, DC: NRC, Office of Standards
NRC has completed its review of the qualifications of facility personnel conducting the radiation in situ leach facility. This review included an safety program at the evaluation using the review procedures in standard review plan Section 5.4.2 and the acceptance criteria outlined in standard review plan Section 5.4.3. Based on the information provided in the application and the detailed review conducted of the qualifications of the personnel conducting the radiation safety program for the in situ leach facility, the staff concludes that the qualifications of the personnel are acceptable and are in compliance with 10 CFR 20.1101, which defines radiation protection program requirements, and 10 CFR 40.32(b), which provides requirements for applicant qualifications. The qualifications of personnel conducting the radiation safety program are acceptable consistent with NRC Regulatory Guide 8.31 (NRC, 2002). 5.4.5 Reference
Exposure, Revision 3” (NRC, 1999). This guide provides guidance for protection of the fetus. It is consistent with Regulatory Guide 8.29, “Instruction Concerning Risks from Occupational Radiation Exposure, Revision 1” (NRC, 1996). This guide provides a basis for training employees on the risks from radiation exposure in the work place. 5.5.4 Evaluation Findings If the staff review, as described in this section, results in the acceptance of the radiation safety training program, the following conclusions may be presented in the technical evaluation report.
NRC has completed its review of the radiation safety training program at the in situ leach facility. This review included an evaluation using the review procedures in standard review plan Section 5.5.2 and the acceptance criteria outlined in standard review plan Section 5.5.3. in situ leach site is consistent with The radiation safety training program at the the guidance contained in NRC Regulatory Guides 8.31 (NRC, 2002), 8.13 (NRC, 1999), and 8.29 (NRC, 1996). The content of the training material, testing, on-the-job training, and the extent and frequency of retraining are acceptable. Radiation safety instructions for employees are acceptable. Based on the information provided in the application and the detailed review conducted of the in situ leach facility, the staff radiation safety training program for the concludes that the radiation safety training program is acceptable and is in compliance with 10 CFR 20.1101, which defines radiation protection program requirements, and 10 CFR 40.32(b), as it relates to applicant qualifications through training. 5-13 Operations 5.5.5 References
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. Regulatory Guide 8.13, “Instruction Concerning Prenatal Radiation Exposure.” Revision 3. Washington, DC: NRC, Office of Standards Development. 1999. –––––. Regulatory Guide 8.29, “Instruction Concerning Risks from Occupational Radiation Exposure.” Revision 1.” Washington, DC: NRC, Office of Standards Development. 1996. Security 5.6.1 Areas of Review The staff should review the security measures proposed to prevent unauthorized entry into the controlled area. 5.6.2 Review Procedures The staff should determine whether the proposed security measures are sufficient to prevent unauthorized entry into the controlled area in accordance with regulatory requirements in 10 CFR Part 20, Subpart I. For license renewals and amendment applications, Appendix A to this standard review plan provides guidance for examining facility operations and the approach that should be used in evaluating amendments and renewal applications. 5.6.3 Acceptance Criteria The security program is acceptable if the applicant has acceptable passive controls, such as fencing for well fields, and active controls, such as daily inspections and locks for plant buildings. 5.6.4 Evaluation Findings If the staff review, as described in this section, results in the acceptance of the security measures, the following conclusions may be presented in the technical evaluation report and environmental assessment. in situ
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. Regulatory Guide 8.37, “ALARA Levels for Effluent from Materials Facilities.”
Washington, DC: NRC, Office of Standards Development. 1993. 5-18 Operations –––––. Regulatory Guide 3.56, “General Guidance for Designing, Testing, Operating, and Maintaining Emission Control Devices at Uranium Mills.” Washington, DC: NRC, Office of
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002a. –––––. Regulatory Guide 8.31, “Information Relevant to Ensuring That Occupational Radiation Exposures at Uranium Recovery Facilities Will Be As Low As Is Reasonably Achievable.” Rev. 1. Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002b. –––––. Regulatory Guide 8.34, “Monitoring Criteria and Methods to Calculate Occupational Radiation Doses.” Washington, DC: NRC, Office of Standards Development. 1992a. 5-21 Operations –––––. Regulatory Guide 8.7, “Instructions for Recording and Reporting Occupational Radiation Exposure Data.” Revision 1. Washington, DC: NRC, Office of Standards
Development. 1992b. –––––. Regulatory Guide 4.14, “Radiological Effluent and Environmental Monitoring at Uranium Mills.” Washington, DC: NRC, Office of Standards Development. 1980. –––––. Regulatory Guide 8.10, “Operating Philosophy for Maintaining Occupational Radiation Exposures As Low As Is Reasonably Achievable.” Washington, DC: NRC, Office of Standards
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002a. –––––. Regulatory Guide 8.31, “Information Relevant to Ensuring that Occupational Radiation Exposures at Uranium Mills Will Be As Low As Reasonably Achievable.” Rev. 1. Washington,
DC: NRC, Office of Nuclear Regulatory Research. 2002b. –––––. Regulatory Guide 8.15, “Acceptable Programs for Respiratory Protection.” Revision 1.
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. Regulatory Guide 8.13, “Instruction Concerning Prenatal Radiation Exposure.” Revision 3. Washington, DC: NRC, Office of Standards Development. 1999. –––––. Regulatory Guide 8.34, “Monitoring Criteria and Methods To Calculate Occupational Radiation Doses.” Washington, DC: NRC, Office of Standards Development. 1992a. –––––. Regulatory Guide 8.36, “Radiation Dose to the Embryo/Fetus.” Washington, DC:
NRC, Office of Standards Development. 1992b. –––––. Regulatory Guide 8.7, “Instructions for Recording and Reporting Occupational Radiation Exposure Data.” Revision 1. Washington, DC: NRC, Office of Standards
Concepts, Equations, and Assumptions for a Bioassay Program” (NRC, 1993). Action levels for bioassay monitoring are set in accordance with Regulatory Guide 8.22, Section 5 (NRC, 1988). All reporting and record keeping are done in conformance with the requirements of 10 CFR Part 20, Subpart L and Subpart M. For license renewal applications, the historical bioassay program results are included through the most recent reporting period preceding the submittal of the application. The effectiveness of the historical program is discussed with regard to all applicable 10 CFR Part 20 regulatory requirements. Long-term trends are discussed, and any short-term deviations from the long-term trend are explained. 5-28 Operations 5.7.5.4 Evaluation Findings If the staff review, as described in this section, results in the acceptance of the bioassay program, the following conclusions may be presented in the technical evaluation report.
NRC has completed its review of the bioassay program at the in situ leach facility. This review included an evaluation using the review procedures in standard review plan Section 5.7.5.2 and the acceptance criteria outlined in standard review plan Section 5.7.5.3. in situ The applicant has established an acceptable bioassay program at the leach site that is consistent with Regulatory Guide 8.22 (NRC, 1988). An acceptable program for baseline urinalysis and exit bioassay is in place. Individuals routinely exposed to yellowcake dust are a part of the bioassay program. An acceptable action program to curtail uranium intake is established, and appropriate actions levels are set. The applicant has established reporting and record keeping protocols in conformance with the requirements of 10 CFR Part 20, Subpart L. Based on the information provided in the application and the detailed review conducted of the in situ leach facility, the staff concludes that the bioassay program at the bioassay program is acceptable and is in compliance with 10 CFR 20.1204, which provides requirements for the determination of internal exposure; and 10 CFR Part 20, Subpart L, which establishes record keeping requirements. 5.7.5.5 References
DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. Regulatory Guide 8.9, “Acceptable Concepts, Models, Equations, and Assumptions for a Bioassay Program.” Revision 1. Washington, DC: NRC, Office of Standards
Development. 1993. –––––. Regulatory Guide 8.22, “Bioassay at Uranium Mills.” Revision 1. Washington, DC:
Washington, DC: NRC, Office of Nuclear Regulatory Research. 2002. –––––. NUREG–1575, “Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).” Revision 1. Washington, DC: NRC. 2000. –––––. Regulatory Guide 8.7, “Instructions for Recording and Reporting Occupational Radiation Exposure Data.” Revision 1. Washington, DC: NRC, Office of Standards
NRC has completed its review of the airborne effluent and environmental monitoring programs at the in situ leach facility. This review included an evaluation using the review procedures in standard review plan Section 5.7.7.2 and the acceptance criteria outlined in standard review plan Section 5.7.7.3. The applicant has established acceptable airborne effluent and environmental monitoring in situ leach site. The programs are consistent with programs at the guidance in Regulatory Guide 4.14 (NRC, 1980). The applicant will sample radon, air particulates, surface soils, subsurface soils, vegetation, direct radiation, and sediment. Locations of monitoring stations are consistent with Regulatory Guide 4.14 (NRC, 1980). Instrumentation is appropriate. Based on the information provided in the application and the detailed review conducted of the in situ leach airborne effluent and environmental monitoring programs at the facility, the staff concludes that the airborne effluent and environmental monitoring programs are acceptable and are in compliance with 10 CFR 20.1302, which requires effluent monitoring to determine dose to individual members of the public; 10 CFR 20.1501, which specifies survey and monitoring requirements; 10 CFR Part 20, Subpart L, which establishes record keeping requirements; and10 CFR 40.65, which specifies effluent and environmental monitoring requirements. 5.7.7.5 References
Conshohocken, Pennsylvania: American Society for Testing and Materials. 1998. –––––. “Standard Practice for Dealing with Outlying Observations.” Designation E178. West
Conshohocken, Pennsylvania: American Society for Testing and Materials. 1994. –––––. “Standard Guide for Sampling Groundwater Monitoring Wells.” Designation D4448–85a. West Conshohocken, Pennsylvania: American Society for Testing and
Materials. 1992. Deutsch, W.J., et al. NUREG/CR–3709, “Method of Minimizing Ground-Water Contamination From In Situ Leach Uranium Mining.” Washington, DC: NRC. 1985.
Washington, DC: EPA. 1989. 5-46 Operations
USGS Water Supply Paper 2254. Third edition. Reston, Virginia: U.S. Geological Survey. 1985.
NRC. NUREG/CR–6733, “A Baseline Risk-Informed, Performance-Based Approach for In Situ Leach Uranium Extraction Licensees.” Washington, DC: NRC. 2001. –––––. NUREG–1475, “Applying Statistics.” Washington, DC: NRC. 1994. –––––. NUREG/CR–4604, “Statistical Methods for Nuclear Material Management.”