Preliminary Data Summary of Urban Storm Water Best Management Practices
Other documents for the same rulemaking (all, by stage)
References
ASCE Database Clearinghouse for entry into the database. As new data are gathered, periodic updates will be made available to the public through use of the Internet. Center for Watershed Protection National Pollutant Removal Performance Database In 1997, the Center for Watershed Protection developed a database for the Chesapeake Research Consortium titled, "National Pollutant Removal Performance Database for Stormwater BMPs" (Brown and Schueler, 1997a). This database focuses on the pollutant removal efficiency of commonly used and innovative urban BMPs for storm water control. The database is derived from 123 research studies developed between 1977 and 1996. All of the studies in the database utilized data collected with automated sampling equipment and had documented methods to compute pollutant removal efficiencies. More than three-quarters of the studies were based on four or more storm samples, while the remaining studies were either based on fewer than four storms or the sample size was not stated. Literature Cited • EPA reports including the Nationwide Urban Runoff Program (NURP), National Water Quality Inventory, Coastal Nonpoint Pollution Program Guidance, NPDES
EPA conducted field performance evaluations at three structural BMP sites during 1998. While these evaluations contribute to the literature on BMP performance, EPA also intended that the field testing would serve as an experimental framework for refining evaluation methodology. Three sites in the Washington, D.C. area were monitored: a constructed wetland, a peat-sand filter, and a regional wet pond. Data summaries for these monitoring activities appear in Chapter 5. Additional findings will be provided in a supplement to this report. Existing Storm Water Regulations and Permits Congress added Section 402(p) to the Clean Water Act in 1987 to require implementation of a comprehensive approach for addressing storm water discharges in two phases. Section 402(p)(4) required EPA to develop permit application regulations under the National Pollutant Discharge Elimination System (NPDES), submission of NPDES permit applications, issuance of
NPDES permits for the first time. EPA issued "baseline" general permits to cover a wide range of facilities with basic requirements, with the intent that more specific requirements would follow in subsequent permit cycles. Industry-specific or "group" permits were issued based on applications submitted by business associations, and other sites were issued individual permits. The management and pollution prevention plans prepared by MS4s and industrial permittees vary in their level of detail and specificity regarding design and implementation of best management practices (BMPs). EPA and some states have issued guidance on preparation of these plans (US EPA, 1992d; US EPA, 1992e). The Agency has not conducted a nationwide review of these plans. Phase II NPDES
EPA proposed the NPDES storm water regulations for the second phase of storm water discharge control (“Phase II”) on January 9, 1998 (US EPA, 1998c). EPA is required to promulgate the Phase II rule in 1999 under a separate consent decree. The proposal designates two classes of facilities for automatic coverage on a nationwide basis under the NPDES program, (1) small municipal separate storm sewer systems located in urbanized areas (about 3,500 municipalities would be included in the program); and (2) construction activities (pollutants include sediments and erosion from these sites) that disturb equal to or greater than one and less than five acres of land (about 110,000 sites per year will be included in the program). Those facilities designated above would need to apply for NPDES storm water permits by 2002. EPA is anticipating that most permittees would be covered under general permits.