{"document":{"doc_id":276,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Rule","title":"Coordination of Federal Authorizations for Electric Transmission Facilities","date":"2024-05-01","url":"https://www.federalregister.gov/documents/2024/05/01/2024-08157/coordination-of-federal-authorizations-for-electric-transmission-facilities","source_native_id":"2024-08157","status":"fetched","abstract":"The Department of Energy (DOE) is amending its regulations for the timely coordination of Federal authorizations for proposed interstate electric transmission facilities pursuant to the Federal Power Act (FPA). Specifically, DOE is establishing an integrated and comprehensive Coordinated Interagency Transmission Authorizations and Permits Program (CITAP Program); making participation in the Integrated Interagency Pre-Application (IIP) Process a pre-condition for assistance under the CITAP Program; re-establishing the IIP Process as an iterative and collaborative process between the proponent of a proposed electric transmission project and Federal and State agencies to develop information needed for Federal authorizations; requiring the project proponent to engage in robust engagement with the public, communities of interest, and Indian Tribes during the IIP Process; aligning and harmonizing the IIP Process and implementation of the FPA with the Fixing America's Surface Transportation Act; and ensuring that DOE may carry out its statutory obligation to prepare a single environmental review document sufficient for the purposes of all Federal authorizations necessary to site a proposed project.","action":"Final rule."},"dockets":["DOE-HQ-2023-0050"],"rins":["RIN 1901-AB62"],"related":[{"doc_id":4813,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Coordination of Federal Authorizations for Electric Transmission Facilities","date":"2023-08-16"},{"doc_id":4486,"source":"fr_rule","org":"DEPARTMENT OF ENERGY","doc_type":"Proposed Rule","title":"Coordination of Federal Authorizations for Electric Transmission Facilities","date":"2023-08-22"}],"references":[{"citation_id":730,"raw_reference":"Millstein, A. et al. (2022) Empirical estimates of transmission value using locational marginal prices, Electricity Markets and Policy Group, 6. Available at: https://emp.lbl.gov/publications/empirical-estimates-transmission.","cited_authors":"Millstein, A. et al.","cited_year":"2022","cited_title":"Empirical estimates of transmission value using locational marginal prices","cited_venue":"Electricity Markets and Policy Group","cited_doi":"10.2172/1879833","cited_url":"https://emp.lbl.gov/publications/empirical-estimates-transmission","ref_kind":"working_paper","section":"fn 15","page":null,"context_sentence":"Grid operation benefits include a reduction in the congestion costs for generating and delivering energy; mitigation of weather and variable generation uncertainty, enhanced diversity of supply, which increases market competition and reduces the need for regional backup power options; and increased market liquidity and competition.\\15\\ From a system planning standpoint, accelerated transmission investments will allow the development of new, low cost power plants in areas of high congestion which might not otherwise see investment due to capacity constraints, and additional grid hardening or resilience.","paper_id":209,"paper_title":"Empirical Estimates of Transmission Value using Locational Marginal Prices [Slides]","paper_year":2022,"paper_doi":"10.2172/1879833"},{"citation_id":731,"raw_reference":"DOE, National Transmission Needs Study (Oct. 2023), available at https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf","cited_authors":"DOE","cited_year":"2023","cited_title":"National Transmission Needs Study","cited_venue":"U.S. Department of Energy, Grid Deployment Office","cited_doi":null,"cited_url":"https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf","ref_kind":"research_report","section":"fn 17","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":732,"raw_reference":"Berkeley Lab, Queued up: Characteristics of power plants seeking transmission interconnection (2023), Electricity Markets and Policy Group. Available at: https://emp.lbl.gov/queues.","cited_authors":"Berkeley Lab","cited_year":"2023","cited_title":"Queued up: Characteristics of power plants seeking transmission interconnection","cited_venue":"Electricity Markets and Policy Group, Berkeley Lab","cited_doi":null,"cited_url":"https://emp.lbl.gov/queues","ref_kind":"research_report","section":"fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":733,"raw_reference":"(2023) Transmission congestion costs rise again in U.S. RTOS, Available at: https://gridstrategiesllc.com/wp-content/uploads/2023/07/GS_Transmission-Congestion-Costs-in-the-U.S.-RTOs1.pdf.","cited_authors":"Grid Strategies LLC","cited_year":"2023","cited_title":"Transmission congestion costs rise again in U.S. RTOS","cited_venue":"Grid Strategies LLC","cited_doi":null,"cited_url":"https://gridstrategiesllc.com/wp-content/uploads/2023/07/GS_Transmission-Congestion-Costs-in-the-U.S.-RTOs1.pdf","ref_kind":"research_report","section":"fn 19","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":734,"raw_reference":"Howland, E. (2023) US grid congestion costs jumped 56% to $20.8B in 2022: Report, Utility Dive.","cited_authors":"Howland, E.","cited_year":"2023","cited_title":"US grid congestion costs jumped 56% to $20.8B in 2022: Report","cited_venue":"Utility Dive","cited_doi":null,"cited_url":"https://www.utilitydive.com/news/grid-congestion-costs-transmission-gets-grid-strategies-report/687309/","ref_kind":"news","section":"fn 21","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":735,"raw_reference":"Nationwide transmission congestion costs rise to $20.8 billion in 2022 (2023). Advanced Power Alliance.","cited_authors":"Advanced Power Alliance","cited_year":"2023","cited_title":"Nationwide transmission congestion costs rise to $20.8 billion in 2022","cited_venue":"Advanced Power Alliance","cited_doi":null,"cited_url":"https://poweralliance.org/2023/07/13/nationwide-transmission-congestion-costs-rise-to-20-8-billion-in-2022/","ref_kind":"news","section":"fn 21","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":736,"raw_reference":"Jenkins, J.D. et al. (2022) Electricity transmission is key to unlock the full potential of the Inflation Reduction Act, Zenodo.","cited_authors":"Jenkins, J.D. et al.","cited_year":"2022","cited_title":"Electricity transmission is key to unlock the full potential of the Inflation Reduction Act","cited_venue":"Zenodo","cited_doi":null,"cited_url":"https://zenodo.org/record/7106176","ref_kind":"dataset","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":737,"raw_reference":"Technical support document: Social cost of carbon, methane, (2021) whitehouse.gov, 5. Available at: https://www.whitehouse.gov/wp-content/uploads/2021/02/TechnicalSupportDocument_SocialCostofCarbonMethaneNitrousOxide.pdf.","cited_authors":null,"cited_year":"2021","cited_title":"Technical support document: Social cost of carbon, methane, and nitrous oxide","cited_venue":"whitehouse.gov","cited_doi":null,"cited_url":"https://www.whitehouse.gov/wp-content/uploads/2021/02/TechnicalSupportDocument_SocialCostofCarbonMethaneNitrousOxide.pdf","ref_kind":"government_report","section":"fn 24","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3361,"raw_reference":"United States Department of Energy, National Transmission Needs Study (Feb. 2023)","cited_authors":"United States Department of Energy","cited_year":"2023","cited_title":"National Transmission Needs Study","cited_venue":"Department of Energy","cited_doi":null,"cited_url":"https://www.energy.gov/sites/default/files/2023-02/022423-DRAFTNeedsStudyforPublicComment.pdf","ref_kind":"research_report","section":"fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3362,"raw_reference":"\"Recommended Performance Schedules.\" Permitting Dashboard: Federal Infrastructure Projects, FEDERAL PERMITTING IMPROVEMENT STEERING COUNCIL, Nov. 2023","cited_authors":"Federal Permitting Improvement Steering Council","cited_year":"2023","cited_title":"Recommended Performance Schedules","cited_venue":"Federal Permitting Improvement Steering Council","cited_doi":null,"cited_url":"www.permits.performance.gov/sites/permits.dot.gov/files/2023-11/RPS_November%202023.pdf","ref_kind":"government_report","section":"fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3363,"raw_reference":"\"Draft Standard Schedule.\" Grid Deployment Office, United States Department of Energy, Aug. 2023","cited_authors":"Grid Deployment Office, U.S. Department of Energy","cited_year":"2023","cited_title":"Draft Standard Schedule","cited_venue":"Department of Energy","cited_doi":null,"cited_url":"www.energy.gov/sites/default/files/2023-08/CITAP-Standard-Schedule-Draft.pdf","ref_kind":"government_report","section":"fn 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":5161,"raw_reference":"Memorandum of Understanding among the U.S. Department of Agriculture, Department of Commerce, Department of Defense, Department of Energy, the Environmental Protection Agency, the Council on Environmental Quality, the Federal Permitting Improvement Steering Council, Department of the Interior, and the Office of Management and Budget Regarding Facilitating Federal Authorizations for Electric Transmission Facilities","cited_authors":null,"cited_year":"2023","cited_title":"Memorandum of Understanding Regarding Facilitating Federal Authorizations for Electric Transmission Facilities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"K.iv.2 MOU Signatory Agency","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":5162,"raw_reference":"Guidance on Implementing Section 216(a) of the Federal Power Act to Designate National Interest Electric Transmission Corridors, DOE Grid Deployment Office, December 2023","cited_authors":"U.S. Department of Energy Grid Deployment Office","cited_year":"2023","cited_title":"Guidance on Implementing Section 216(a) of the Federal Power Act to Designate National Interest Electric Transmission Corridors","cited_venue":"U.S. Department of Energy","cited_doi":null,"cited_url":"www.energy.gov/sites/default/files/2023-12/2023-12-15GDONIETCFinalGuidanceDocument.pdf","ref_kind":"government_report","section":"fn 13","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}