Missouri River Bed Degradation Feasibility Study - Technical Report
Other documents for the same rulemaking (all, by stage)
References
Alexander, J.S., Jacobson, R.B., and Rus, D.L., 2013, Sediment transport and deposition in the lower Missouri River during the 2011 flood: U.S. Geological Survey Professional Paper 1798–F, 27 p., http://dx.doi.org/10.3133/pp1798f.
Blevins, D.W., 2006. The response of suspended sediment, turbidity, and velocity to historical alterations of the Missouri River: U.S. Geological Survey Circular 1301, 8 p. Council on Environmental Quality. 1997. January 1997. Considering Cumulative Effects Under the National Environmental Policy Act. Executive Office of the President,
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and weepwater habitats of the United States. U.S. Fish and Wildlife Service. FWS/OBS 79/31.
Funk, J.L., and Robinson, J.W. 1974. Changes in the Channel of the Lower Missouri River and Effects on Fish and Wildlife. Missouri Department of Conservation. p. 52.
Hesse, L. W., C. W. Wolfe, and N. K. Cole. 1988. Some aspects of energy flow in the Missouri River ecosystem and a rationale for recovery. Pages 13-29 in N. G. Benson, editor. The Missouri River: the resources their uses and values. North Central Division of the American Fisheries Society Special Publication 8.
Jacobson, R.B., Blevins, D.W., and Bitner, C.J. 2009. Sediment Regime Constraints on River Restoration—An Example from the Lower Missouri River. The Geological Society of America Special Paper. v. 451.
Kondolf, G. M. 1994. Geomorphic and environmental effects of instream gravel mining. Landscape and Urban Planning, 28 (1994) 225-243.
Kondolf, G. M. 1997. Hungry Water: Effects of Dams and Gravel Mining on River Channels. Environmental Management Vol 21, No 4. pp 533-551.
Meade, R. and Moody, J. 2010. Causes for the decline of suspended sediment discharge in the Mississippi River system, 1940-2007. Hydrological Processes Vol 24, Issue 1. pp 35-49.
NRC. 2002. The Missouri River Ecosystem: Exploring the Prospects for Recovery.
NRC. 2011. Missouri River planning: Recognizing and incorporating sediment management. Washington, DC: National Academies Press.
Rinaldi, M., Wyzga, B., and Surian, N. 2005. Sediment Mining in Alluvial Channels: Physical Effects and Management Perspectives. River Research and Applications 21: 805-828.
Scott, K.M. 1973. Scour and fill in Tujunga Wash – A fanhead valley in urban southern California – 1969. US Geological Survey Professional Paper 732-B.
Schneiders, R. K. 1999. Unruly River: Two Centuries of Change along the Missouri. University Press of Kansas, 1999. Lawrence, KS.
Stevens, M.A., Urbonas, B. and Tucker, L.S. 1990. Public-private cooperation protects river. APWA Reporter, September: 25: 7-27.
USACE. 1980. Potamology Investigation Missouri River, Rulo, Nebraska to Mouth.
MRD Sediment Series No. 22. USACE. 1990. Commercial Dredging Activities on the Kansas River, Kansas. Final Regulatory Report and EIS. January 1990.
USACE. 2003. Missouri River Fish and Wildlife Mitigation Project, Final Supplemental
USACE 2006. Missouri River Mainstem Reservoir System – Master Water Control Manual. Missouri River Basin. Reservoir Control Center. U.S. Army Corps of Engineers, Northwestern Division – Missouri River Basin. Omaha, Nebraska. Retrieved from http://www.nwd-mr.usace.army.mil/rcc/reports/mmanual/MasterManual.pdf.
USACE. 2009. Missouri River Bed Degradation Reconnaissance Study, Section 905(b) Analysis. Kansas City District. Retrieved from: www.nwk.usace.army.mil/projects/MoRiverDegradation/Documents/MORiverBedDegra dationReconStudy.pdf
USACE. 2010. Memorandum for Record: Documentation of Missouri River Low Water Surface Profile Adjustment Procedure. U.S. Army Corps of Engineers, Kansas City District. Kansas City, MO.
USACE. 2011a. United States Army Corps of Engineers Missouri River Bed Degradation Final EIS. Retrieved from http://www.nwk.usace.army.mil/Missions/RegulatoryBranch/MissouriRiverCommercialDr edging.aspx. U.S. Army Corps of Engineers (USACE). 2011b. Record of Decision for Authorization of Commercial Sand and Gravel Dredging on the Lower Missouri River. Kansas City District. Retrieved from: www.nwk.usace.army.mil/Missions/RegulatoryBranch/MissouriRiverCommercialDredgin g.aspx
USACE. 2013. Lewis and Clark Lake Sediment Management Study (LCLSMS) Part II: Sediment Transport and Flow Analysis with GSTARS4.
USACE. 2015a. A Sediment Budget Approach to Stable Dredging Levels on the Lower
Missouri River, 1994 to 2014. CENWK-ED-HR Memorandum for Record, October 2015.
USACE. 2015b. Missouri River bed and water-surface changes between 2009 and 2014 as they relate to Renewal of Commercial Dredging Permits under Section 404 of Clean Water Act and Section 10 of the Rivers and Harbors Act (Section 404/10 Permits).
CENWK-ED-HR Memorandum for CENWK-OD-R, 14 July 2015.
USACE. 2016. Draft Missouri River Recovery Management Plan and EIS. Retrieved from: https://parkplanning.nps.gov/documentsList.cfm?parkID=155&projectID=48574
USFWS. 1993. Pallid sturgeon (Scaphirhynchus albus) recovery plan. Region 6,
USFWS, Denver, Colorado. USFWS. 1999. Final EIS for Proposed Expansion of Big Muddy National Fish & Wildlife