{"document":{"doc_id":2747,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional RIA Support","date":"2026-01-13","url":"https://www.regulations.gov/document/PHMSA-2017-0151-0074","source_native_id":"PHMSA-2017-0151-0074","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2017-0151"],"rins":["RIN 2137-AF29"],"related":[{"doc_id":88421,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2018-07-31"},{"doc_id":129008,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting with CNGC and INGAA - 07272020.pdf.2020.9.28","date":"2020-09-28"},{"doc_id":2753,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"2137-AF29 Class Location PRIA","date":"2020-10-14"},{"doc_id":6602,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2020-10-14"},{"doc_id":128894,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Class Location NPRM OMB Redline 2017-0151","date":"2020-12-23"},{"doc_id":2735,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"RIA gas tariff rate cases","date":"2026-01-13"},{"doc_id":2741,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Class Location Change RIA January 2026","date":"2026-01-13"},{"doc_id":127396,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive changes in Class Location Change Final Rule Preamble During OIRA Review - EO 12866","date":"2026-01-13"},{"doc_id":2722,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2026-01-14"},{"doc_id":2868,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration","date":"2026-04-01"},{"doc_id":2967,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Class Location Change Requirements; Correction","date":"2026-05-29"}],"references":[{"citation_id":176405,"raw_reference":"Gulf, under contract with Oak Ridge National Laboratories (ORNL) has prepared an unclassified estimate. Document No. 1765-000-EBM-0001-00, Pipeline Testing, Inspection, and Replacement Cost Estimates, 11/30/2017","cited_authors":"Gulf Project","cited_year":"2017","cited_title":"Pipeline Testing, Inspection, and Replacement Cost Estimates (Estimate Basis Memorandum)","cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Pipeline Testing, Inspection, and Replacement Cost Estimates section","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176406,"raw_reference":"Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation, March, 2017, Prepared for INGAA by Process Performance Improvement Consultants, LLC (P-PIC)","cited_authors":"Process Performance Improvement Consultants, LLC (P-PIC)","cited_year":"2017","cited_title":"Analysis of Natural Gas Transmission Pipeline Releases for Pipeline MAOP Reconfirmation and Mitigation Options","cited_venue":"Interstate Natural Gas Association of America (INGAA)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Analysis of Natural Gas Transmission Pipeline Releases report","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176407,"raw_reference":"M.J. Bradley & Associates, \"Analysis of Pipeline and Hazardous Materials Safety Administration Proposed New Safety Rules: Pipeline Blowdown Emissions and Mitigation Options,\" June 2016","cited_authors":"M.J. Bradley & Associates","cited_year":"2016","cited_title":"Analysis of Pipeline and Hazardous Materials Safety Administration Proposed New Safety Rules: Pipeline Blowdown Emissions and Mitigation Options","cited_venue":"Environmental Defense Fund and Pipeline Safety Trust","cited_doi":null,"cited_url":"http://pstrust.org/wp-content/uploads/2015/10/PHMSA-Blowdown-Analysis-DRAFT-FINAL-30jun16.pdf","ref_kind":"research_report","section":"fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176408,"raw_reference":"Blue Source Canada, Blowdown Protocol for Pipeline Systems, Appendix A GAS DEVIATION FACTOR QUANTIFICATION, April 2011","cited_authors":"Blue Source Canada","cited_year":"2011","cited_title":"Blowdown Protocol for Pipeline Systems, Appendix A Gas Deviation Factor Quantification","cited_venue":"Blue Source Canada","cited_doi":null,"cited_url":"http://pacificcarbontrust.com/assets/Uploads/Protocols/Blowdown-Protocol-Apr-14.pdf","ref_kind":"research_report","section":"fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176409,"raw_reference":"Budgetary Proposal #8251, Greene's Energy Group, LLC, May 8, 2013","cited_authors":"Krista Cundiff","cited_year":"2013","cited_title":"Proposal #8251 Various 12\", 24\" & 36\" Pipelines Located In Nashville, Tennessee","cited_venue":"Greene's Energy Group, LLC","cited_doi":null,"cited_url":"www.greenesenergy.com","ref_kind":"other","section":"Greene's Energy Group proposal section","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176410,"raw_reference":"Lessons Learned from Natural Gas STAR Partners: Reducing Emissions When Taking Compressors Off-Line","cited_authors":null,"cited_year":null,"cited_title":"Reducing Emissions When Taking Compressors Off-Line","cited_venue":"Natural Gas STAR Program, EPA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Lessons Learned from Natural Gas STAR Partners section","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176411,"raw_reference":"1999 PRCI Final Report","cited_authors":null,"cited_year":"1999","cited_title":"PRCI Final Report","cited_venue":"Pipeline Research Council International","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Exhibit 1 source note, Reducing Emissions When Taking Compressors Off-Line","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176633,"raw_reference":"GAO, 2020 Census: Update on the Census Bureau's Implementation of Partnership and Outreach Activities, GAO-20-496 (Washington, D.C.: May 13, 2020).","cited_authors":"GAO","cited_year":"2020","cited_title":"2020 Census: Update on the Census Bureau's Implementation of Partnership and Outreach Activities","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 15","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176634,"raw_reference":"GAO, 2020 Census: Status Update on Early Operations, GAO-20-111R (Washington, D.C.: Oct. 31, 2019).","cited_authors":"GAO","cited_year":"2019","cited_title":"2020 Census: Status Update on Early Operations","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176635,"raw_reference":"GAO, 2020 Census: Bureau Is Making Progress Opening Offices and Recruiting, but Could Improve Its Ability to Evaluate Training, GAO-19-602 (Washington, D.C.: July 19, 2019).","cited_authors":"GAO","cited_year":"2019","cited_title":"2020 Census: Bureau Is Making Progress Opening Offices and Recruiting, but Could Improve Its Ability to Evaluate Training","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 17","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176636,"raw_reference":"GAO, 2020 Census: Lessons Learned from Planning and Implementing the 2020 Census Offer Insights to Support 2030 Preparations, GAO-22-104357 (Washington, D.C.: February 2022).","cited_authors":"GAO","cited_year":"2022","cited_title":"2020 Census: Lessons Learned from Planning and Implementing the 2020 Census Offer Insights to Support 2030 Preparations","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176637,"raw_reference":"GAO, 2020 Census: Bureau Released Apportionment and Redistricting Data, but Needs to Finalize Plans for Future Data Products, GAO-22-105324 (Washington, D.C.: March 14, 2022).","cited_authors":"GAO","cited_year":"2022","cited_title":"2020 Census: Bureau Released Apportionment and Redistricting Data, but Needs to Finalize Plans for Future Data Products","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 21","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176638,"raw_reference":"GAO, Federal Real Property Security: Interagency Security Committee Should Implement a Lessons-Learned Process, GAO-12-901 (Washington, D.C: September 2012).","cited_authors":"GAO","cited_year":"2012","cited_title":"Federal Real Property Security: Interagency Security Committee Should Implement a Lessons-Learned Process","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176639,"raw_reference":"GAO, Schedule Assessment Guide: Best Practices for Project Schedules, GAO-16-89G (Washington, D.C.: December 2015).","cited_authors":"GAO","cited_year":"2015","cited_title":"Schedule Assessment Guide: Best Practices for Project Schedules","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176640,"raw_reference":"A Guide to the Program Management Book of Knowledge, PMBOK® Guide, Sixth Edition.","cited_authors":null,"cited_year":null,"cited_title":"A Guide to the Program Management Book of Knowledge, PMBOK® Guide, Sixth Edition","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 24","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176641,"raw_reference":"GAO-21-478.","cited_authors":"GAO","cited_year":"2021","cited_title":null,"cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 26","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":176642,"raw_reference":"GAO-19-588T.","cited_authors":"GAO","cited_year":"2019","cited_title":null,"cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 28","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178555,"raw_reference":"NTSB Safety Study (NTSB/SS-97/01; PB97-917003)","cited_authors":"National Transportation Safety Board","cited_year":"1997","cited_title":"Safety Study (NTSB/SS-97/01; PB97-917003)","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 3: 811 Center (Practice 3-1)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178556,"raw_reference":"Subsurface Utility Engineering, Federal Highway Administration (FHWA), February 1999, Office of Program Administration","cited_authors":"Federal Highway Administration","cited_year":"1999","cited_title":"Subsurface Utility Engineering","cited_venue":"Federal Highway Administration, Office of Program Administration","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 2: Planning and Design (Practice 2-2)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178557,"raw_reference":"Highway/Utility Guide. Publication No. FHWA-SA-93-049. Office of Technology Applications, FHWA, U.S. Department of Transportation, June 1993.","cited_authors":"Federal Highway Administration","cited_year":"1993","cited_title":"Highway/Utility Guide","cited_venue":"FHWA-SA-93-049, Office of Technology Applications, U.S. Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 2: Planning and Design (Practice 2-4)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178558,"raw_reference":"Arizona Utility Coordinating Committee (AUCC) Public Improvement/Project Guide, December 1996","cited_authors":"Arizona Utility Coordinating Committee","cited_year":"1996","cited_title":"Public Improvement/Project Guide","cited_venue":"Arizona Utility Coordinating Committee","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 2: Planning and Design (Practice 2-4)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178559,"raw_reference":"\"Construction Management Interference Control Manual,\" Consolidated Edison, New York, New York, June 9, 1997","cited_authors":"Consolidated Edison","cited_year":"1997","cited_title":"Construction Management Interference Control Manual","cited_venue":"Consolidated Edison","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 2: Planning and Design (Practice 2-2)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178560,"raw_reference":"U.S. Department of Transportation—FHWA (12/1999). Cost Savings on Projects Utilizing Subsurface Utility Engineering. Pub. No. FHWA-IF-00-014","cited_authors":"Federal Highway Administration","cited_year":"1999","cited_title":"Cost Savings on Projects Utilizing Subsurface Utility Engineering","cited_venue":"FHWA-IF-00-014","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 2: Planning and Design (Practice 2-14)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178561,"raw_reference":"U.S. Department of Transportation—FHWA (3/2001). Subsurface Utility Engineering: Enhancing Construction Activities. Pub. No. FHWA-IF-01-011","cited_authors":"Federal Highway Administration","cited_year":"2001","cited_title":"Subsurface Utility Engineering: Enhancing Construction Activities","cited_venue":"FHWA-IF-01-011","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 2: Planning and Design (Practice 2-14)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178562,"raw_reference":"ASCE 38-22 Standard Guideline for Investigating and Documenting Existing Utilities","cited_authors":"American Society of Civil Engineers","cited_year":"2022","cited_title":"Standard Guideline for Investigating and Documenting Existing Utilities","cited_venue":"ASCE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 2: Planning and Design (Practice 2-14)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178563,"raw_reference":"Publication No. FHWA-HRT-16-019 \"Feasibility of Mapping and Marking Underground Utilities by State Transportation Departments\"","cited_authors":"Federal Highway Administration","cited_year":"2016","cited_title":"Feasibility of Mapping and Marking Underground Utilities by State Transportation Departments","cited_venue":"FHWA-HRT-16-019","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 2: Planning and Design (Practice 2-19)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178564,"raw_reference":"VDOT paper: Electronic RFID Marking and GPS Based Utility As-Built Mapping System","cited_authors":"Virginia Department of Transportation","cited_year":null,"cited_title":"Electronic RFID Marking and GPS Based Utility As-Built Mapping System","cited_venue":"VDOT","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 2: Planning and Design (Practice 2-19)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178565,"raw_reference":"\"Model One Call for the 20th and 21st Century,\" AT&T","cited_authors":"AT&T","cited_year":null,"cited_title":"Model One Call for the 20th and 21st Century","cited_venue":"AT&T","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 3: 811 Center (Practice 3-9)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178566,"raw_reference":"Virginia Pilot Project; Phase I—Electronic White Lining Study","cited_authors":null,"cited_year":null,"cited_title":"Electronic White Lining Study","cited_venue":"Virginia Pilot Project, Phase I","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 5: Excavation (Practice 5-2)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178567,"raw_reference":"Common Ground Study","cited_authors":"U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration","cited_year":"1999","cited_title":"Common Ground Study","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 1: Introduction","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178913,"raw_reference":"Howard, T., R. Kantamaneni, G. Jones, Indaco Air Quality Services, Inc. PRCI Final Report. “Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations”. August 1999.","cited_authors":"Howard, T., R. Kantamaneni, G. Jones","cited_year":"1999","cited_title":"Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations","cited_venue":"PRCI Final Report, Indaco Air Quality Services, Inc.","cited_doi":"10.55274/r0010166","cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":28612,"paper_title":"L51802 Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations","paper_year":1999,"paper_doi":"10.55274/r0010166"},{"citation_id":178914,"raw_reference":"\"Compressor Shutdown Leakage.\" Pipeline & Gas Journal, December 1985.","cited_authors":null,"cited_year":"1985","cited_title":"Compressor Shutdown Leakage","cited_venue":"Pipeline & Gas Journal","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178915,"raw_reference":"Kishawy, H. A., Gabbar, H. A. Review of pipeline integrity management practices. International Journal of Pressure Vessels and Piping 87 (2010) 373-380. doi:10.1016/j.ijpvp.2010.04.003","cited_authors":"Hossam A. Kishawy, Hossam A. Gabbar","cited_year":"2010","cited_title":"Review of pipeline integrity management practices","cited_venue":"International Journal of Pressure Vessels and Piping","cited_doi":"10.1016/j.ijpvp.2010.04.003","cited_url":"https://www.researchgate.net/publication/223417529","ref_kind":"journal_article","section":"Review of pipeline integrity management practices","page":null,"context_sentence":null,"paper_id":28611,"paper_title":"Review of pipeline integrity management practices","paper_year":2010,"paper_doi":"10.1016/j.ijpvp.2010.04.003"},{"citation_id":178916,"raw_reference":"Highwood Emissions Management, PHMSA Methane Detection Requirements Analysis, Technical Report, 2023-08-16, prepared for API","cited_authors":"Bruna Goes Palma, Brendan Moorhouse, Thomas Fox","cited_year":"2023","cited_title":"PHMSA Methane Detection Requirements Analysis","cited_venue":"Highwood Emissions Management Inc. for American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"PHMSA Methane Detection Requirements Analysis (front matter)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178917,"raw_reference":"Chen et al. Quantifying Regional Methane Emissions in the New Mexico Permian Basin with a Comprehensive Aerial Survey Environmental Science & Technology 2022 56 (7), 4317-4323","cited_authors":"Chen et al.","cited_year":"2022","cited_title":"Quantifying Regional Methane Emissions in the New Mexico Permian Basin with a Comprehensive Aerial Survey","cited_venue":"Environmental Science & Technology","cited_doi":"10.1021/acs.est.1c06458.s001","cited_url":null,"ref_kind":"journal_article","section":"2.2.2. Methane Emissions","page":null,"context_sentence":null,"paper_id":349,"paper_title":"Supporting information 1 of Quantifying Regional Methane Emissions in the New Mexico Permian Basin with a Comprehensive Aerial Survey","paper_year":2022,"paper_doi":"10.1021/acs.est.1c06458.s001"},{"citation_id":178918,"raw_reference":"Tian, S., Smits, K. M., Cho, Y., Riddick, S. N., Zimmerle, D. J. and Duggan, A. (2022a) Estimating methane emissions from underground natural gas pipelines using an atmospheric dispersion-based method. Elementa: Science of the Anthropocene.","cited_authors":"Tian, S., Smits, K. M., Cho, Y., Riddick, S. N., Zimmerle, D. J., Duggan, A.","cited_year":"2022","cited_title":"Estimating methane emissions from underground natural gas pipelines using an atmospheric dispersion-based method","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":"10.32855/dataset.2024.05.016","cited_url":null,"ref_kind":"journal_article","section":"3.1. PHMSA Requirements Evaluation","page":null,"context_sentence":null,"paper_id":28613,"paper_title":"Replication Data for \"Estimating methane emissions from underground natural gas pipelines using an atmospheric dispersion-based method\"","paper_year":2022,"paper_doi":"10.32855/dataset.2024.05.016"},{"citation_id":178919,"raw_reference":"Tian, S., Riddick, S. N., Cho, Y., Bell, C. S., Zimmerle, D. J. and Smits, K. M. (2022b) Investigating Detection Probability of Mobile Survey Solutions for Natural Gas Pipeline Leaks Under Different Atmospheric Conditions. Environmental Pollution.","cited_authors":"Tian, S., Riddick, S. N., Cho, Y., Bell, C. S., Zimmerle, D. J., Smits, K. M.","cited_year":"2022","cited_title":"Investigating Detection Probability of Mobile Survey Solutions for Natural Gas Pipeline Leaks Under Different Atmospheric Conditions","cited_venue":"Environmental Pollution","cited_doi":"10.32855/dataset.2024.05.027","cited_url":null,"ref_kind":"journal_article","section":"3.1. PHMSA Requirements Evaluation","page":null,"context_sentence":null,"paper_id":51462,"paper_title":"Replication Data for: Investigating Detection Probability of Mobile Survey Solutions for Natural Gas Pipeline Leaks under Different Atmospheric Conditions","paper_year":2022,"paper_doi":"10.32855/dataset.2024.05.027"},{"citation_id":178920,"raw_reference":"Rutherford, J. S. et al. Closing the methane gap in US oil and natural gas production emissions inventories. Nat Commun 12, 4715 (2021).","cited_authors":"Rutherford, J. S. et al.","cited_year":"2021","cited_title":"Closing the methane gap in US oil and natural gas production emissions inventories","cited_venue":"Nature Communications","cited_doi":"10.1038/s41467-021-25017-4","cited_url":null,"ref_kind":"journal_article","section":"2.2.2. Methane Emissions","page":null,"context_sentence":null,"paper_id":5520,"paper_title":"Closing the methane gap in US oil and natural gas production emissions inventories","paper_year":2021,"paper_doi":"10.1038/s41467-021-25017-4"},{"citation_id":178921,"raw_reference":"Omara, M. et al. Methane Emissions from Natural Gas Production Sites in the United States: Data Synthesis and National Estimate. Environ. Sci. Technol. 52, 12915–12925 (2018).","cited_authors":"Omara, M. et al.","cited_year":"2018","cited_title":"Methane Emissions from Natural Gas Production Sites in the United States: Data Synthesis and National Estimate","cited_venue":"Environmental Science & Technology","cited_doi":"10.1021/acs.est.8b03535.s002","cited_url":null,"ref_kind":"journal_article","section":"2.2.3. Cost","page":null,"context_sentence":null,"paper_id":28614,"paper_title":"Supporting information 2 of Methane Emissions from Natural Gas Production Sites in the United States: Data Synthesis and National Estimate","paper_year":2020,"paper_doi":"10.1021/acs.est.8b03535.s002"},{"citation_id":178922,"raw_reference":"Brandt, A. R., Heath, G. A. & Cooley, D. Methane Leaks from Natural Gas Systems Follow Extreme Distributions. Environ. Sci. Technol. 50, 12512–12520 (2016).","cited_authors":"Brandt, A. R., Heath, G. A., Cooley, D.","cited_year":"2016","cited_title":"Methane Leaks from Natural Gas Systems Follow Extreme Distributions","cited_venue":"Environmental Science & Technology","cited_doi":"10.1021/acs.est.6b04303","cited_url":null,"ref_kind":"journal_article","section":"2.2.3. Cost","page":null,"context_sentence":null,"paper_id":5930,"paper_title":"Methane Leaks from Natural Gas Systems Follow Extreme Distributions","paper_year":2016,"paper_doi":"10.1021/acs.est.6b04303"},{"citation_id":178923,"raw_reference":"Zavala-Araiza, D. et al. Reconciling divergent estimates of oil and gas methane emissions. Proc. Natl. Acad. Sci. U.S.A. 112, 15597–15602 (2015).","cited_authors":"Zavala-Araiza, D. et al.","cited_year":"2015","cited_title":"Reconciling divergent estimates of oil and gas methane emissions","cited_venue":"Proceedings of the National Academy of Sciences","cited_doi":"10.1073/pnas.1522126112","cited_url":null,"ref_kind":"journal_article","section":"4.1.3. Leak Rate Distributions","page":null,"context_sentence":null,"paper_id":5718,"paper_title":"Reconciling divergent estimates of oil and gas methane emissions","paper_year":2015,"paper_doi":"10.1073/pnas.1522126112"},{"citation_id":178924,"raw_reference":"Xia, H., Strayer, A., & Ravikumar, A. (2023). The Role of Emissions Size Distribution on the Efficacy of New Technologies to Reduce Methane Emissions from the Oil and Gas Sector.","cited_authors":"Xia, H., Strayer, A., Ravikumar, A.","cited_year":"2023","cited_title":"The Role of Emissions Size Distribution on the Efficacy of New Technologies to Reduce Methane Emissions from the Oil and Gas Sector","cited_venue":null,"cited_doi":"10.1021/acs.est.3c05245","cited_url":null,"ref_kind":"working_paper","section":"3.4. Aircraft and helicopters","page":null,"context_sentence":null,"paper_id":28615,"paper_title":"The Role of Emission Size Distribution on the Efficacy of New Technologies to Reduce Methane Emissions from the Oil and Gas Sector","paper_year":2024,"paper_doi":"10.1021/acs.est.3c05245"},{"citation_id":178925,"raw_reference":"Bell, Clay, Jeff Rutherford, Adam Brandt, Evan Sherwin, Timothy Vaughn, Daniel Zimmerle; Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR. Elementa: Science of the Anthropocene 4 January 2022; 10 (1): 00080.","cited_authors":"Clay Bell, Jeff Rutherford, Adam Brandt, Evan Sherwin, Timothy Vaughn, Daniel Zimmerle","cited_year":"2022","cited_title":"Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":"10.1525/elementa.2022.00080","cited_url":null,"ref_kind":"journal_article","section":"3.4. Aircraft and helicopters","page":null,"context_sentence":null,"paper_id":28616,"paper_title":"Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR","paper_year":2022,"paper_doi":"10.1525/elementa.2022.00080"},{"citation_id":178926,"raw_reference":"Sherwin, Evan D. et al. Single-blind test of airplane-based hyperspectral methane detection via controlled releases. Elementa: Science of the Anthropocene 21 January 2021; 9 (1): 00063.","cited_authors":"Evan D. Sherwin, Yuanlei Chen, Arvind P. Ravikumar, Adam R. Brandt","cited_year":"2021","cited_title":"Single-blind test of airplane-based hyperspectral methane detection via controlled releases","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"3.4. Aircraft and helicopters","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178927,"raw_reference":"Ravikumar et al. Single-blind inter-comparison of methane detection technologies – results from the Stanford/EDF Mobile Monitoring Challenge. Elementa: Science of the Anthropocene 1 January 2019; 7 37.","cited_authors":"Ravikumar et al.","cited_year":"2019","cited_title":"Single-blind inter-comparison of methane detection technologies – results from the Stanford/EDF Mobile Monitoring Challenge","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":"10.1525/elementa.373","cited_url":null,"ref_kind":"journal_article","section":"3.6. Mobile ground labs","page":null,"context_sentence":null,"paper_id":5716,"paper_title":"Single-blind inter-comparison of methane detection technologies – results from the Stanford/EDF Mobile Monitoring Challenge","paper_year":2019,"paper_doi":"10.1525/elementa.373"},{"citation_id":178928,"raw_reference":"Li, H.Z.; Mundia-Howe, M.; Reeder, M.D.; Pekney, N.J. Gathering Pipeline Methane Emissions in Utica Shale Using an Unmanned Aerial Vehicle and Ground-Based Mobile Sampling. Atmosphere 2020, 11, 716.","cited_authors":"Li, H.Z.; Mundia-Howe, M.; Reeder, M.D.; Pekney, N.J.","cited_year":"2020","cited_title":"Gathering Pipeline Methane Emissions in Utica Shale Using an Unmanned Aerial Vehicle and Ground-Based Mobile Sampling","cited_venue":"Atmosphere","cited_doi":"10.3390/atmos11070716","cited_url":null,"ref_kind":"journal_article","section":"3.5. Unmanned Aerial Vehicles","page":null,"context_sentence":null,"paper_id":51461,"paper_title":"Gathering Pipeline Methane Emissions in Utica Shale Using an Unmanned Aerial Vehicle and Ground-Based Mobile Sampling","paper_year":2020,"paper_doi":"10.3390/atmos11070716"},{"citation_id":178929,"raw_reference":"Zimmerle et al, Detection Limits of Optical Gas Imaging for Natural Gas Leak Detection in Realistic Controlled Conditions Environmental Science & Technology 2020 54 (18), 11506-11514","cited_authors":"Zimmerle et al.","cited_year":"2020","cited_title":"Detection Limits of Optical Gas Imaging for Natural Gas Leak Detection in Realistic Controlled Conditions","cited_venue":"Environmental Science & Technology","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"3.7. Close-range instruments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178930,"raw_reference":"Coburn, J. & Stott, R. Modeling Fugitive Emissions from Production Sites Using FEAST.","cited_authors":"Coburn, J., Stott, R.","cited_year":null,"cited_title":"Modeling Fugitive Emissions from Production Sites Using FEAST","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"4.1.3. Leak Rate Distributions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178931,"raw_reference":"U.S. Government Accountability Office, 2020 Census: A More Complete Lessons Learned Process for Cost and Schedule Would Help the Next Decennial, GAO-23-105819, March 2023","cited_authors":"U.S. Government Accountability Office","cited_year":"2023","cited_title":"2020 Census: A More Complete Lessons Learned Process for Cost and Schedule Would Help the Next Decennial","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"GAO-23-105819 Highlights","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":178932,"raw_reference":"GAO, GAO Cost Estimating and Assessment Guide, Best Practices for Developing and Managing Capital Program Costs, GAO-09-3SP (Washington, D.C.: March 2009).","cited_authors":"GAO","cited_year":"2009","cited_title":"GAO Cost Estimating and Assessment Guide, Best Practices for Developing and Managing Capital Program Costs","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Background","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179490,"raw_reference":"ASCE 38-02 \"Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data\"","cited_authors":"American Society of Civil Engineers","cited_year":"2002","cited_title":"Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data","cited_venue":"ASCE 38-02","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 6: Mapping (6-19 references)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179491,"raw_reference":"Consolidated Edison guideline, \"Installation of electronic markers on gas mains and services\"","cited_authors":"Consolidated Edison Company of New York, Inc.","cited_year":null,"cited_title":"Installation of electronic markers on gas mains and services","cited_venue":"Consolidated Edison","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 6: Mapping (6-19 references)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179492,"raw_reference":"Louisiana 811 Systems, Inc. Project 2000, 1998 Marketing Plan","cited_authors":"Louisiana 811 Systems, Inc.","cited_year":"1998","cited_title":"Project 2000, 1998 Marketing Plan","cited_venue":"Louisiana 811 Systems, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 8: Public Education and Awareness (8-1)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179493,"raw_reference":"Public Awareness Marketing Plan for Underground Utility Damage Prevention, prepared for the Damage Prevention Quality Action Team by The Daily Planit, November 20, 1997","cited_authors":"The Daily Planit","cited_year":"1997","cited_title":"Public Awareness Marketing Plan for Underground Utility Damage Prevention","cited_venue":"Prepared for the Damage Prevention Quality Action Team","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 8: Public Education and Awareness (8-1)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179494,"raw_reference":"API Recommended Practice (RP) 1162, \"Public Awareness Programs for Pipeline Operators\"","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Public Awareness Programs for Pipeline Operators","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 8: Public Education and Awareness (8-4)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179495,"raw_reference":"API Recommended Practice 1123","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Recommended Practice 1123","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 8: Public Education and Awareness (8-7)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179496,"raw_reference":"\"Presentation of Findings: OPS/DAMQAT Underground Facility Damage Prevention Study\" (nationwide survey)","cited_authors":null,"cited_year":null,"cited_title":"Presentation of Findings: OPS/DAMQAT Underground Facility Damage Prevention Study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 8: Public Education and Awareness (8-10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179497,"raw_reference":"\"Presentation of Findings: DAMQAT Pilot Evaluation Study\" (regional survey)","cited_authors":null,"cited_year":null,"cited_title":"Presentation of Findings: DAMQAT Pilot Evaluation Study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Chapter 8: Public Education and Awareness (8-10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179498,"raw_reference":"Great Lakes Common Carrier Committee Six-State Survey","cited_authors":"Great Lakes Common Carrier Committee","cited_year":null,"cited_title":"Six-State Survey","cited_venue":"Great Lakes Common Carrier Committee","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Chapter 8: Public Education and Awareness (8-10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179499,"raw_reference":"Virginia State Corporation Commission survey on why damages occur","cited_authors":"Virginia State Corporation Commission","cited_year":null,"cited_title":"Survey on why damages occur","cited_venue":"Virginia State Corporation Commission","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Chapter 8: Public Education and Awareness (8-10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179500,"raw_reference":"National Transportation Safety Board Safety Study: Protecting Public Safety through Excavation Damage Prevention (NTSB/SS-97-01)","cited_authors":"National Transportation Safety Board","cited_year":"1997","cited_title":"Safety Study: Protecting Public Safety through Excavation Damage Prevention","cited_venue":"NTSB/SS-97-01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 9: Reporting and Evaluation (9-20)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179501,"raw_reference":"National Transportation Safety Board, 1995. Proceedings of the Excavation Damage Prevention Workshop; Report of Proceedings NTSB/RP-95/01","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Proceedings of the Excavation Damage Prevention Workshop","cited_venue":"NTSB/RP-95/01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Appendix D: Endnote 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179502,"raw_reference":"VDOT's paper, Electronic RFID Marking and GPS Based Utility As-Built Mapping System","cited_authors":"Virginia Department of Transportation","cited_year":null,"cited_title":"Electronic RFID Marking and GPS Based Utility As-Built Mapping System","cited_venue":"VDOT","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix B: Guidelines for Underground Electronic Utility Marker Technology","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179503,"raw_reference":"American Gas Association (AGA), \"Directional Drilling Damage Prevention Guidelines for the Natural Gas Industry,\" Technical Note, December 30, 2004","cited_authors":"American Gas Association","cited_year":"2004","cited_title":"Directional Drilling Damage Prevention Guidelines for the Natural Gas Industry","cited_venue":"AGA Technical Note","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179504,"raw_reference":"American Society of Civil Engineers, ASCE Manuals and Reports on Engineering Practice No. 89, \"Pipeline Crossings,\" 1996","cited_authors":"American Society of Civil Engineers","cited_year":"1996","cited_title":"Pipeline Crossings","cited_venue":"ASCE Manuals and Reports on Engineering Practice No. 89","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179505,"raw_reference":"Bennett, R.D., S.T. Ariaratnam, and C. Como, \"Horizontal Directional Drilling Good Practices Guidelines,\" HDD Consortium, 2001","cited_authors":"Bennett, R.D.; Ariaratnam, S.T.; Como, C.","cited_year":"2001","cited_title":"Horizontal Directional Drilling Good Practices Guidelines","cited_venue":"HDD Consortium, Washington, DC","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179506,"raw_reference":"Gas Research Institute, \"Final Report—Guideline for the Application of Guided Horizontal Drilling to Install Gas Distribution Piping,\" GRI-96-0368, September 1996","cited_authors":"Gas Research Institute","cited_year":"1996","cited_title":"Final Report—Guideline for the Application of Guided Horizontal Drilling to Install Gas Distribution Piping","cited_venue":"GRI-96-0368","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179507,"raw_reference":"National Utility Contractors Association (NUCA), \"Trenchless Construction Methods and Soil Compatibility Manual,\" 3rd Edition","cited_authors":"National Utility Contractors Association","cited_year":null,"cited_title":"Trenchless Construction Methods and Soil Compatibility Manual","cited_venue":"NUCA","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":179508,"raw_reference":"National Utility Locating Contractors Association (NULCA), \"Excavation Practices & Procedures for Damage Prevention,\" Spooner, WI, 1996","cited_authors":"National Utility Locating Contractors Association","cited_year":"1996","cited_title":"Excavation Practices & Procedures for Damage Prevention","cited_venue":"Spooner, WI","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Appendix D: Trenchless Excavation References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":508987,"raw_reference":"Analysis of Natural Gas Transmission Pipeline Releases for Pipeline MAOP Reconfirmation and Mitigation Options, March 2017, Process Performance Improvement Consultants, LLC (P-PIC) for INGAA","cited_authors":"Process Performance Improvement Consultants, LLC (P-PIC)","cited_year":"2017","cited_title":"Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","cited_venue":"Interstate Natural Gas Association of America (INGAA)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Acknowledgement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":508988,"raw_reference":"\"Analysis of Pipeline and Hazardous Materials Safety Administration Proposed New Safety Rules: Pipeline Blowdown Emissions and Mitigation Options,\" http://pstrust.org/wp-content/uploads/2015/10/PHMSA-Blowdown-Analysis-DRAFT-FINAL-30jun16.pdf (June 2016)","cited_authors":"M.J. Bradley & Associates","cited_year":"2016","cited_title":"Analysis of Pipeline and Hazardous Materials Safety Administration Proposed New Safety Rules: Pipeline Blowdown Emissions and Mitigation Options","cited_venue":"Environmental Defense Fund and Pipeline Safety Trust","cited_doi":null,"cited_url":"http://pstrust.org/wp-content/uploads/2015/10/PHMSA-Blowdown-Analysis-DRAFT-FINAL-30jun16.pdf","ref_kind":"research_report","section":"1. Summary, fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":508989,"raw_reference":"Blue Source Canada, Blowdown Protocol for Pipeline Systems, Appendix A GAS DEVIATION FACTOR QUANTIFICATION, April 2011. http://pacificcarbontrust.com/assets/Uploads/Protocols/Blowdown-Protocol-Apr-14.pdf","cited_authors":"Blue Source Canada","cited_year":"2011","cited_title":"Blowdown Protocol for Pipeline Systems, Appendix A Gas Deviation Factor Quantification","cited_venue":"Blue Source Canada","cited_doi":null,"cited_url":"http://pacificcarbontrust.com/assets/Uploads/Protocols/Blowdown-Protocol-Apr-14.pdf","ref_kind":"research_report","section":"1.6 Estimated Total Gas and Methane Release Calculations, fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":508990,"raw_reference":"Gulf Project No.: 1765, Document No.: 1765-000-EBM-0001-00, Estimate Basis Memorandum, Pipeline Testing, Inspection, and Replacement Cost Estimates, Rev. C, 11/30/2017","cited_authors":"Gulf","cited_year":"2017","cited_title":"Pipeline Testing, Inspection, and Replacement Cost Estimates (Estimate Basis Memorandum)","cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Pipeline Testing and Inspection Cost Estimates section","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":508991,"raw_reference":"Common Ground Alliance, The Definitive Guide for Underground Safety & Damage Prevention, CGA Best Practices 21.0, published February 2025","cited_authors":"Common Ground Alliance","cited_year":"2025","cited_title":"CGA Best Practices 21.0","cited_venue":"Common Ground Alliance","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 1 Introduction","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510419,"raw_reference":"Consolidated Edison, \"Construction Management Interference Control Manual,\" New York, New York, June 9, 1997","cited_authors":"Consolidated Edison","cited_year":"1997","cited_title":"Construction Management Interference Control Manual","cited_venue":"Consolidated Edison","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"2-1: Plat Designation of Existing Underground Facility Easements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510420,"raw_reference":"Arizona Utility Coordinating Committee (AUCC) Public Improvement/ Project Guide, December1996","cited_authors":"Arizona Utility Coordinating Committee","cited_year":"1996","cited_title":"Public Improvement/Project Guide","cited_venue":"Arizona Utility Coordinating Committee","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"2-4: Utility Coordination","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510421,"raw_reference":"ASCE 38-22 \"Standard Guideline for Investigating and Documenting Existing Utilities\"","cited_authors":"American Society of Civil Engineers","cited_year":"2022","cited_title":"Standard Guideline for Investigating and Documenting Existing Utilities","cited_venue":"ASCE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"2-14: Subsurface Utility Engineering (SUE)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510422,"raw_reference":"AGA Plastic Pipe Manual for Gas Service, 2006 Edition","cited_authors":"American Gas Association","cited_year":"2006","cited_title":"Plastic Pipe Manual for Gas Service","cited_venue":"American Gas Association","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"2-5: Markers for Underground Facilities","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510423,"raw_reference":"National Transportation Safety Board (NTSB) Safety Study (NTSB/SS97/01; PB97-917003)","cited_authors":"National Transportation Safety Board","cited_year":"1997","cited_title":"Excavation Damage to Underground Facilities Safety Study","cited_venue":"NTSB/SS-97/01; PB97-917003","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Chapter 3: 811 Center","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510743,"raw_reference":"GAO-16-89G","cited_authors":"GAO","cited_year":"2015","cited_title":"Schedule Assessment Guide: Best Practices for Project Schedules","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510744,"raw_reference":"GAO-22-104357.","cited_authors":"GAO","cited_year":"2022","cited_title":null,"cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510745,"raw_reference":"GAO-14-389 and GAO-16-205T.","cited_authors":"GAO","cited_year":"2014","cited_title":null,"cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 27","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":510746,"raw_reference":"Clay Bell, Jeff Rutherford, Adam Brandt, Evan Sherwin, Timothy Vaughn, Daniel Zimmerle; Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR. Elementa: Science of the Anthropocene 4 January 2022; 10 (1): 00080.","cited_authors":"Bell, Clay; Rutherford, Jeff; Brandt, Adam; Sherwin, Evan; Vaughn, Timothy; Zimmerle, Daniel","cited_year":"2022","cited_title":"Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":"10.1525/elementa.2022.00080","cited_url":null,"ref_kind":"journal_article","section":"Technical Report, Sec. 3.4 (fn 9)","page":null,"context_sentence":null,"paper_id":28616,"paper_title":"Single-blind determination of methane detection limits and quantification accuracy using aircraft-based LiDAR","paper_year":2022,"paper_doi":"10.1525/elementa.2022.00080"},{"citation_id":510747,"raw_reference":"Evan D. Sherwin, Yuanlei Chen, Arvind P. Ravikumar, Adam R. Brandt; Single-blind test of airplane-based hyperspectral methane detection via controlled releases. Elementa: Science of the Anthropocene 21 January 2021; 9 (1): 00063.","cited_authors":"Sherwin, Evan D.; Chen, Yuanlei; Ravikumar, Arvind P.; Brandt, Adam R.","cited_year":"2021","cited_title":"Single-blind test of airplane-based hyperspectral methane detection via controlled releases","cited_venue":"Elementa: Science of the Anthropocene","cited_doi":"10.1525/elementa.2021.00063","cited_url":null,"ref_kind":"journal_article","section":"Technical Report, Sec. 3.4 (fn 10)","page":null,"context_sentence":null,"paper_id":28619,"paper_title":"Single-blind test of airplane-based hyperspectral methane detection via controlled releases","paper_year":2021,"paper_doi":"10.1525/elementa.2021.00063"},{"citation_id":510748,"raw_reference":"Kishawy, H.A.; Gabbar, H.A. Review of pipeline integrity management practices. International Journal of Pressure Vessels and Piping 87 (2010) 373-380. doi:10.1016/j.ijpvp.2010.04.003","cited_authors":"Hossam A. Kishawy; Hossam A. Gabbar","cited_year":"2010","cited_title":"Review of pipeline integrity management practices","cited_venue":"International Journal of Pressure Vessels and Piping","cited_doi":"10.1016/j.ijpvp.2010.04.003","cited_url":null,"ref_kind":"journal_article","section":"Attached journal article","page":null,"context_sentence":null,"paper_id":28611,"paper_title":"Review of pipeline integrity management practices","paper_year":2010,"paper_doi":"10.1016/j.ijpvp.2010.04.003"},{"citation_id":512534,"raw_reference":"Howard, T., R. Kantamaneni, G. Jones, Indaco Air Quality Services, Inc. PRCI Final Report. \"Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations\". August 1999.","cited_authors":"Howard, T., R. Kantamaneni, G. Jones","cited_year":"1999","cited_title":"Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations","cited_venue":"PRCI Final Report, Indaco Air Quality Services, Inc.","cited_doi":"10.55274/r0010166","cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":28612,"paper_title":"L51802 Cost Effective Leak Mitigation at Natural Gas Transmission Compressor Stations","paper_year":1999,"paper_doi":"10.55274/r0010166"},{"citation_id":512535,"raw_reference":"Campbell, Alastair J. Bently Nevada Corporation, Houston, Texas. Optical Alignment of Reciprocating Compressors.","cited_authors":"Campbell, Alastair J.","cited_year":null,"cited_title":"Optical Alignment of Reciprocating Compressors","cited_venue":"Bently Nevada Corporation","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":512536,"raw_reference":"France Compressor Products. Mechanical Packing - Design and Theory of Operation, Bulletin 691.","cited_authors":"France Compressor Products","cited_year":null,"cited_title":"Mechanical Packing - Design and Theory of Operation, Bulletin 691","cited_venue":"France Compressor Products","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514071,"raw_reference":"Trenchless Technology Center Louisiana Tech University","cited_authors":"Trenchless Technology Center, Louisiana Tech University","cited_year":null,"cited_title":null,"cited_venue":"Louisiana Tech University","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Chapter 8: 8-11 Cross Bore Determination and Mitigation","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514072,"raw_reference":"Bennett, R.D., S.T. Ariaratnam, and C. Como, \"Horizontal Directional Drilling Good Practices Guidelines,\" HDD Consortium, Washington, DC, ISBN 1-928984-13-4, 2001.","cited_authors":"Bennett, R.D.; Ariaratnam, S.T.; Como, C.","cited_year":"2001","cited_title":"Horizontal Directional Drilling Good Practices Guidelines","cited_venue":"HDD Consortium, Washington, DC","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Appendix D: Additional References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514073,"raw_reference":"Gas Research Institute, \"Final Report—Guideline for the Application of Guided Horizontal Drilling to Install Gas Distribution Piping,\" GRI-96-0368, September 1996.","cited_authors":"Gas Research Institute","cited_year":"1996","cited_title":"Final Report—Guideline for the Application of Guided Horizontal Drilling to Install Gas Distribution Piping","cited_venue":"Gas Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix D: Additional References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514074,"raw_reference":"American Gas Association (AGA), \"Directional Drilling Damage Prevention Guidelines for the Natural Gas Industry,\" Technical Note, December 30, 2004.","cited_authors":"American Gas Association","cited_year":"2004","cited_title":"Directional Drilling Damage Prevention Guidelines for the Natural Gas Industry","cited_venue":"American Gas Association","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix D: Additional References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514075,"raw_reference":"National Utility Locating Contractors Association (NULCA), \"Excavation Practices & Procedures for Damage Prevention,\" Spooner, WI, 1996.","cited_authors":"National Utility Locating Contractors Association","cited_year":"1996","cited_title":"Excavation Practices & Procedures for Damage Prevention","cited_venue":"NULCA","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix D: Additional References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514076,"raw_reference":"GAO-23-105819, 2020 Census: A More Complete Lessons Learned Process for Cost and Schedule Would Help the Next Decennial","cited_authors":"U.S. Government Accountability Office","cited_year":"2023","cited_title":"2020 Census: A More Complete Lessons Learned Process for Cost and Schedule Would Help the Next Decennial","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"GAO-23-105819 front matter","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":514077,"raw_reference":"GAO, 2020 Census: Bureau Generally Followed Its Plan for In-Field Address Canvassing, GAO-20-415 (Washington, D.C.: Mar. 12, 2020).","cited_authors":"U.S. Government Accountability Office","cited_year":"2020","cited_title":"2020 Census: Bureau Generally Followed Its Plan for In-Field Address Canvassing","cited_venue":"GAO","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Footnote 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}