{"document":{"doc_id":2741,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Class Location Change RIA January 2026","date":"2026-01-13","url":"https://www.regulations.gov/document/PHMSA-2017-0151-0083","source_native_id":"PHMSA-2017-0151-0083","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2017-0151"],"rins":["RIN 2137-AF29"],"related":[{"doc_id":88421,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2018-07-31"},{"doc_id":129008,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting with CNGC and INGAA - 07272020.pdf.2020.9.28","date":"2020-09-28"},{"doc_id":2753,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"2137-AF29 Class Location PRIA","date":"2020-10-14"},{"doc_id":6602,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2020-10-14"},{"doc_id":128894,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Class Location NPRM OMB Redline 2017-0151","date":"2020-12-23"},{"doc_id":2735,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"RIA gas tariff rate cases","date":"2026-01-13"},{"doc_id":2747,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional RIA Support","date":"2026-01-13"},{"doc_id":127396,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive changes in Class Location Change Final Rule Preamble During OIRA Review - EO 12866","date":"2026-01-13"},{"doc_id":2722,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2026-01-14"},{"doc_id":2868,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration","date":"2026-04-01"},{"doc_id":2967,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Class Location Change Requirements; Correction","date":"2026-05-29"}],"references":[{"citation_id":177112,"raw_reference":"Oak Ridge/Gulf Interstate Engineering survey (2017)","cited_authors":"Oak Ridge/Gulf Interstate Engineering","cited_year":"2017","cited_title":"survey","cited_venue":"Oak Ridge/Gulf Interstate Engineering","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix B, Exhibit B-2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177113,"raw_reference":"Greene's Energy Group (2013)","cited_authors":"Greene's Energy Group","cited_year":"2013","cited_title":null,"cited_venue":"Greene's Energy Group","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix B, Exhibit B-8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177114,"raw_reference":"Mears Group, Inc., Typical Costs for Indirect Surveys and Coupon Test Station (CTS) Installations (Feb. 9, 2018)","cited_authors":"Mears Group, Inc.","cited_year":"2018","cited_title":"Typical Costs for Indirect Surveys and Coupon Test Station (CTS) Installations","cited_venue":"Mears Group, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix B, B2.2 (fn 85)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177115,"raw_reference":"Kishawy & Gabbar, Review of Pipeline Integrity Management Practices, 87 Int'l J. Pressure Vessels and Piping 373 (2010)","cited_authors":"Hossam A. Kishawy, Hossam A. Gabbar","cited_year":"2010","cited_title":"Review of Pipeline Integrity Management Practices","cited_venue":"International Journal of Pressure Vessels and Piping, 87","cited_doi":"10.1016/j.ijpvp.2010.04.003","cited_url":"https://doi.org/10.1016/j.ijpvp.2010.04.003","ref_kind":"journal_article","section":"Appendix B, B1.2 (fn 78)","page":null,"context_sentence":null,"paper_id":28611,"paper_title":"Review of pipeline integrity management practices","paper_year":2010,"paper_doi":"10.1016/j.ijpvp.2010.04.003"},{"citation_id":177116,"raw_reference":"GAO, 2020 Census, A More Complete Lessons Learned Process for Costs and Schedule Would Help the Next Decennial (Mar. 2023)","cited_authors":"U.S. Government Accountability Office","cited_year":"2023","cited_title":"2020 Census, A More Complete Lessons Learned Process for Costs and Schedule Would Help the Next Decennial","cited_venue":"GAO-23-105819","cited_doi":null,"cited_url":"https://www.gao.gov/assets/gao-23-105819.pdf","ref_kind":"government_report","section":"Alternative 5 (fn 67)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177117,"raw_reference":"JHP, Calculator Density Guide","cited_authors":"JHP","cited_year":null,"cited_title":"Calculator Density Guide","cited_venue":"JHP Architecture","cited_doi":null,"cited_url":"https://jhparch.com/density","ref_kind":"web_page","section":"Alternative 5 (fn 66)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177118,"raw_reference":"Pac. Gas & Elec., 2019 Gas Transmission and Storage Rate Case Workpapers Supporting Chapter 9: Operations and Maintenance (Sept. 2018)","cited_authors":"Pacific Gas & Electric","cited_year":"2018","cited_title":"2019 Gas Transmission and Storage Rate Case Workpapers Supporting Chapter 9: Operations and Maintenance","cited_venue":"California Public Utilities Commission","cited_doi":null,"cited_url":"https://docs.cpuc.ca.gov/PublishedDocs/SupDoc/A1711009/1703/229104246.pdf","ref_kind":"government_report","section":"Appendix B, B2.8 (fn 91)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177119,"raw_reference":"Southern Calif. Gas Co., Revised Capital Workpapers, Direct Testimony of Rich H. Chiapa, et al. (Aug. 2022)","cited_authors":"Southern California Gas Company","cited_year":"2022","cited_title":"Revised Capital Workpapers, Direct Testimony of Rich H. Chiapa, et al.","cited_venue":"Public Utilities Commission of California","cited_doi":null,"cited_url":"https://www.socalgas.com/sites/default/files/SCG-06-WPR_Rick_Chiapa_and_Aaron_Bell_and_Steve_Hruby-Gas_Transmission_Operations_and_Construction_49459.pdf","ref_kind":"government_report","section":"Appendix B, B2.8 (fn 91)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177120,"raw_reference":"Berntsen, LineMarker Round Top (Jan. 2019)","cited_authors":"Berntsen International","cited_year":"2019","cited_title":"LineMarker Round Top","cited_venue":"Berntsen International","cited_doi":null,"cited_url":"https://www.berntsen.com/Utilities/Carsonite-PipelineMarkers/LineMarker-Round-Top","ref_kind":"web_page","section":"Appendix B, B2.10 (fn 93)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177765,"raw_reference":"American Gas Association, American Petroleum Institute, American Public Gas Association, and Interstate Natural Gas Association of America (collectively, JTA), Comments, Docket ID PHMSA-2017-0151-0018, at 9 n. 26 (Oct. 1, 2018)","cited_authors":"American Gas Association, American Petroleum Institute, American Public Gas Association, Interstate Natural Gas Association of America","cited_year":"2018","cited_title":"Comments, Docket ID PHMSA-2017-0151-0018","cited_venue":"PHMSA docket","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"ES-3 fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177766,"raw_reference":"Gulf Interstate Engineering, Oak Ridge Nat'l Lab., Pipeline Testing, Inspection, and Replacement Cost Estimates, Gulf Project No. 1765, Document No. 1765-000-EBM-0001-00 (Rev. C, Nov. 30, 2017)","cited_authors":"Gulf Interstate Engineering, Oak Ridge National Laboratory","cited_year":"2017","cited_title":"Pipeline Testing, Inspection, and Replacement Cost Estimates","cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Pipe Replacement, fn 28","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177767,"raw_reference":"Greene's Energy Group, Budgetary Proposal 8251, Various 12”, 24” & 36” Pipelines Located in Nashville, TN (May 8, 2013)","cited_authors":"Greene's Energy Group","cited_year":"2013","cited_title":"Budgetary Proposal 8251, Various 12”, 24” & 36” Pipelines Located in Nashville, TN","cited_venue":"Greene's Energy Group","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Pressure Test, fn 32","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177768,"raw_reference":"INGAA, Report to the NTSB on Historical and Future Development of Advanced In-Line Inspection Platforms for Use in Gas Pipeline Systems, at 23 (Mar. 26, 2012)","cited_authors":"INGAA","cited_year":"2012","cited_title":"Report to the NTSB on Historical and Future Development of Advanced In-Line Inspection Platforms for Use in Gas Pipeline Systems","cited_venue":"Interstate Natural Gas Association of America","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.5, fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177769,"raw_reference":"Process Performance Improvement Consultants, LLC, INGAA, Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation (March 2017)","cited_authors":"Process Performance Improvement Consultants, LLC; INGAA","cited_year":"2017","cited_title":"Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","cited_venue":"INGAA","cited_doi":null,"cited_url":"https://ingaa.org/wp-content/uploads/2018/08/35005.PDF","ref_kind":"research_report","section":"Reductions in Venting and Blowdowns Benefits, fn 52","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177770,"raw_reference":"EPA, Lessons Learned from Natural Gas STAR Partners: Reducing Emissions When Taking Compressors Off-Line (Oct. 2006)","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2006","cited_title":"Lessons Learned from Natural Gas STAR Partners: Reducing Emissions When Taking Compressors Off-Line","cited_venue":"EPA Natural Gas STAR","cited_doi":null,"cited_url":"https://19january2017snapshot.epa.gov/sites/production/files/2016-06/documents/ll_compressorsoffline.pdf","ref_kind":"government_report","section":"Reductions in Venting and Blowdowns Benefits, fn 49","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177771,"raw_reference":"PHMSA, 2024 Annual Report, Part K","cited_authors":"PHMSA","cited_year":"2024","cited_title":"Gas Transmission & Gathering Annual Data","cited_venue":"PHMSA","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/data-and-statistics/pipeline/gas-distribution-gas-gathering-gas-transmission-hazardous-liquids","ref_kind":"dataset","section":"Quantity of Class Location Change Activity, fn 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177772,"raw_reference":"PHMSA, Gas Transmission & Gathering Incident Data – January 2010 to present (2025)","cited_authors":"PHMSA","cited_year":"2025","cited_title":"Gas Transmission & Gathering Incident Data – January 2010 to present","cited_venue":"PHMSA","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/data-and-statistics/pipeline/distribution-transmission-gathering-lng-and-liquid-accident-and-incident-data","ref_kind":"dataset","section":"Safety Benefits, fn 38","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177773,"raw_reference":"Amy Andryszak, President, Interstate Nat. Gas Assoc. Am., to Jeff Duncan & Diana DeGette, Chairman & Ranking Member, H. Comm. on Energy & Com. (Jan. 18, 2024)","cited_authors":"Amy Andryszak","cited_year":"2024","cited_title":"Letter to House Energy and Commerce Subcommittee on Energy, Climate, and Grid Security","cited_venue":"Interstate Natural Gas Association of America","cited_doi":null,"cited_url":"https://s47476.pcdn.co/wp-content/uploads/2024/01/2024.01.18-House-EC-Pipeline-Safety-Reauthorization-letter-FINAL.pdf","ref_kind":"other","section":"ES-3 fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}