Policy Replication

RIA gas tariff rate cases

Regulatory impact analysis2026-01-13 · PHMSA · regulatory_impact_analysis · PHMSA-2017-0151-0079
RIN 2137-AF29 · Docket PHMSA-2017-0151

Other documents for the same rulemaking

2018-07-31 Federal RegisterPipeline Safety: Class Location Change Requirements
2020-09-28 Docket documentEO 12866 Meeting with CNGC and INGAA - 07272020.pdf.2020.9.28
2020-10-14 Regulatory impact analysis2137-AF29 Class Location PRIA
2020-10-14 Federal RegisterPipeline Safety: Class Location Change Requirements
2020-12-23 Docket documentClass Location NPRM OMB Redline 2017-0151
2026-01-13 Regulatory impact analysisClass Location Change RIA January 2026
2026-01-13 Regulatory impact analysisAdditional RIA Support
2026-01-13 Docket documentSubstantive changes in Class Location Change Final Rule Preamble During OIRA Review - EO 12866
2026-01-14 Federal RegisterPipeline Safety: Class Location Change Requirements
2026-04-01 Federal RegisterPipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration
2026-05-29 Federal RegisterPipeline Safety: Class Location Change Requirements; Correction

References: 4 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Federal Energy Regulatory Commission "FERC NGA Gas Tariff" Columbia Gas Transmission, LLC Baseline Tariffs
otherNot linked to a paper · Columbia Gas Transmission FTS Service Agreement
Pacific Gas and Electric Company, 2019 Gas Transmission and Storage Rate Case, Workpapers Supporting Chapter 9, Operations and Maintenance
otherNot linked to a paper · WP 9-47 through WP 9-93 (workpaper tables)
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: April 1, 2023
otherNot linked to a paper · Columbia Gas Transmission FTS Service Agreement No. 198766
PACIFIC GAS AND ELECTRIC COMPANY 2019 GAS TRANSMISSION AND STORAGE RATE CASE NOVEMBER 17, 2017 WORKPAPERS WITH ERRATA SUPPORTING CHAPTER 9 OPERATIONS AND MAINTENANCE
otherNot linked to a paper · Pacific Gas and Electric Company 2019 Gas Transmission and Storage Rate Case workpapers