Policy Replication

H. Rept. 119-823: LOAD FORECASTING ENHANCEMENT ACT

Committee report2026-09-14 · House Committee on Energy and Commerce · house_report · CRPT-119hrpt823

The Committee on Energy and Commerce, to whom was referred the bill (H.R. 9332) to require the Federal Energy Regulatory Commission to establish regional joint boards to study electric load forecasting, and for other purposes, having considered the same, reports favorably thereon without amendment and recommends that the bill do pass.

References: 5 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Electric Power Research Institute (EPRI), Powering Intelligence: Updated Scenarios of U.S. Data Center Electricity Usage and Power Strategies (February 2026) https://www.epri.com/research/products/000000003002034696.
research reportNot linked to a paper · fn 1 · cited link
Lawrence Berkeley National Laboratory (LBNL), United States Data Center Energy Usage Report: 2025 Update (June 2026) https://eta.lbl.gov/publications/united-states-data-center-energy-2025.
research reportNot linked to a paper · fn 2 · cited link
North American Electric Reliability Corporation (NERC), Long-Term Reliability Assessment (January 2026) https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf.
research reportNot linked to a paper · fn 3 · cited link
Federal Energy Regulatory Commission, Joint Federal-State Task Force on Electric Transmission (June 2021), https://www.ferc.gov/media/e-1-ad21-15-000.
web pageNot linked to a paper · fn 4 · cited link
Federal Energy Regulatory Commission, Federal and State Current Issues Collaborative (August 2024), https://www.ferc.gov/federal-state-current-issues-collaborative.
web pageNot linked to a paper · fn 5 · cited link