{"document":{"doc_id":269981,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation of Proposed Panel Closure Modifications At WIPP [DOE/AL58309-82] (EEG-82)","date":"2006-07-25","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2004-0025-0092","source_native_id":"EPA-HQ-OAR-2004-0025-0092","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2004-0025"],"rins":["RIN 2060-AG85"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"},{"doc_id":269972,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)","date":"2006-07-25"},{"doc_id":269973,"source":"docket_item","org":"EPA","doc_type":"report","title":"Analysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)","date":"2006-07-25"},{"doc_id":269974,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report","date":"2006-07-25"},{"doc_id":269975,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Peer Review Plan","date":"2006-07-25"},{"doc_id":269976,"source":"docket_item","org":"EPA","doc_type":"report","title":"Individual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)","date":"2006-07-25"},{"doc_id":269977,"source":"docket_item","org":"EPA","doc_type":"report","title":"PEER 1-Conceptual Models Peer Review (CMPR)","date":"2006-07-25"},{"doc_id":269978,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)","date":"2006-07-25"},{"doc_id":269979,"source":"docket_item","org":"EPA","doc_type":"report","title":"International Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)","date":"2006-07-25"}],"references":[{"citation_id":4611909,"raw_reference":"Silva, Matthew; Chaturvedi, Lokesh. 1995. Need for engineered barriers at the Waste Isolation Pilot Plant. In Transactions of the American Nuclear Society, October 29- November 2, 1995. La Grange Park (IL): American Nuclear Society, TANSAO 73:123-124. [DOE] US Department of Energy. 1996. Detailed design report for an operational phase panel-closure system. Carlsbad: DOE. DOE/WIPP96-2150. [DOE] US Department of Energy. 1996a. Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant, October 1996. Carlsbad (NM): Carlsbad Area Office. DOE/CAO-1996-2184. 21 volumes. [EPA] US Environmental Protection Agency. 1998 May 18. Criteria for the certification and recertification of the Waste Isolation Pilot Plant's compliance with 40 CFR 191 disposal regulations: certification decision; final rule. Federal Register 63(5):27354-27406.","cited_authors":"Silva, Matthew; Chaturvedi, Lokesh","cited_year":"1995","cited_title":"Need for engineered barriers at the Waste Isolation Pilot Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611910,"raw_reference":"APPENDICES APPENDIX A April 17, 2001 letter, Triay to Marcinowski","cited_authors":null,"cited_year":null,"cited_title":"APPENDICES APPENDIX A April 17, 2001 letter, Triay to Marcinowski","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611911,"raw_reference":"AMEC Earth and Environmental Limited APPENDIX D September 4, 2001 letter, Triay to Marcinowski","cited_authors":null,"cited_year":null,"cited_title":"AMEC Earth and Environmental Limited APPENDIX D September 4, 2001 letter, Triay to Marcinowski","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611912,"raw_reference":"EEG-1 Goad, Donna, A Compilation of Site Selection Criteria Considerations and Concerns Appearing in the Literature on the Deep Disposal of Radioactive Wastes, June 1979.","cited_authors":"EEG-1 Goad, Donna, A Compilation of Site Selection Criteria Considerations and Concerns Appearing in the Literature on the Deep Disposal of Radioactive Wastes, June","cited_year":"1979","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611913,"raw_reference":"EEG-2 Review Comments on Geological Characterization Report, Waste Isolation Pilot Plant (WIPP) Site, Southeastern New Mexico SAND 78-1596, Volume I and II, December 1978.","cited_authors":"EEG-2 Review Comments on Geological Characterization Report, Waste Isolation Pilot Plant (WIPP) Site, Southeastern New Mexico SAND 78-1596, Volume I and II, December","cited_year":"1978","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611914,"raw_reference":"Energy, August 1979. EEG-4 Little, Marshall S., Review Comments on the Report of the Steering Committee on Waste Acceptance Criteria for the Waste Isolation Pilot Plant, February 1980.","cited_authors":"Energy, August","cited_year":"1979","cited_title":"EEG-4 Little, Marshall S., Review Comments on the Report of the Steering Committee on Waste Acceptance Criteria for the Waste Isolation Pilot Plant, February 1980","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611915,"raw_reference":"EEG-5 Channell, James K., Calculated Radiation Doses From Deposition of Material Released in Hypothetical Transportation Accidents Involving WIPP-Related Radioactive Wastes, October 1980.","cited_authors":"EEG-5 Channell, James K., Calculated Radiation Doses From Deposition of Material Released in Hypothetical Transportation Accidents Involving WIPP-Related Radioactive Wastes, October","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611916,"raw_reference":"EEG-6 Geotechnical Considerations for Radiological Hazard Assessment of WIPP. A Report of a Meeting Held on January 17-18, 1980, April 1980.","cited_authors":"EEG-6 Geotechnical Considerations for Radiological Hazard Assessment of WIPP. A Report of a Meeting Held on January 17-18","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611917,"raw_reference":"EEG-8 Wofsy, Carla, The Significance of Certain Rustler Aquifer Parameters for Predicting Long-Term Radiation Doses from WIPP, September 1980.","cited_authors":"EEG-8 Wofsy, Carla, The Significance of Certain Rustler Aquifer Parameters for Predicting Long-Term Radiation Doses from WIPP, September","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611918,"raw_reference":"Breach, September 1981. EEG-10 Radiological Health Review of the Final Environmental Impact Statement (DOE/EIS0026) Waste Isolation Pilot Plant, U. S. Department of Energy, January 1981.","cited_authors":"Breach, September","cited_year":"1981","cited_title":"EEG-10 Radiological Health Review of the Final Environmental Impact Statement (DOE/EIS0026) Waste Isolation Pilot Plant, U. S. Department of Energy, January 1981","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611919,"raw_reference":"EEG-11 Channell, James K., Calculated Radiation Doses From Radionuclides Brought to the Surface if Future Drilling Intercepts the WIPP Repository and Pressurized Brine, January 1982.","cited_authors":"EEG-11 Channell, James K., Calculated Radiation Doses From Radionuclides Brought to the Surface if Future Drilling Intercepts the WIPP Repository and Pressurized Brine, January","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611920,"raw_reference":"EEG-12 Little, Marshall S., Potential Release Scenario and Radiological Consequence Evaluation of Mineral Resources at WIPP, May 1982.","cited_authors":"EEG-12 Little, Marshall S., Potential Release Scenario and Radiological Consequence Evaluation of Mineral Resources at WIPP, May","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611921,"raw_reference":"WIPP Repository, May, 1982. EEG-14 Not published.","cited_authors":"WIPP Repository, May","cited_year":"1982","cited_title":"EEG-14 Not published","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611922,"raw_reference":"EEG-15 Bard, Stephen T., Estimated Radiation Doses Resulting if an Exploratory Borehole Penetrates a Pressurized Brine Reservoir Assumed to Exist Below the WIPP Repository Horizon - A Single Hole Scenario, March 1982.","cited_authors":"EEG-15 Bard, Stephen T., Estimated Radiation Doses Resulting if an Exploratory Borehole Penetrates a Pressurized Brine Reservoir Assumed to Exist Below the WIPP Repository Horizon - A Single Hole Scenario, March","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611923,"raw_reference":"EEG-16 Radionuclide Release, Transport and Consequence Modeling for WIPP. A Report of a Workshop Held on September 16-17, 1981, February 1982.","cited_authors":"EEG-16 Radionuclide Release, Transport and Consequence Modeling for WIPP. A Report of a Workshop Held on September 16-17","cited_year":"1981","cited_title":"February 1982","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611924,"raw_reference":"EEG-17 Spiegler, Peter, Hydrologic Analyses of Two Brine Encounters in the Vicinity of the Waste Isolation Pilot Plant (WIPP) Site, December 1982.","cited_authors":"EEG-17 Spiegler, Peter, Hydrologic Analyses of Two Brine Encounters in the Vicinity of the Waste Isolation Pilot Plant (WIPP) Site, December","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611925,"raw_reference":"Oxygen, March 1983. EEG-19 Channell, James K., Review Comments on Environmental Analysis Cost Reduction Proposals (WIPP/DOE-136) July 1982, November 1982.","cited_authors":"Oxygen, March","cited_year":"1983","cited_title":"EEG-19 Channell, James K., Review Comments on Environmental Analysis Cost Reduction Proposals (WIPP/DOE-136) July 1982, November 1982","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611926,"raw_reference":"EEG-20 Baca, Thomas E., An Evaluation of the Non-Radiological Environmental Problems Relating to the WIPP, February 1983.","cited_authors":"EEG-20 Baca, Thomas E., An Evaluation of the Non-Radiological Environmental Problems Relating to the WIPP, February","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611927,"raw_reference":"EEG-21 Faith, Stuart, et al., The Geochemistry of Two Pressurized Brines From the Castile Formation in the Vicinity of the Waste Isolation Pilot Plant (WIPP) Site, April 1983.","cited_authors":"EEG-21 Faith, Stuart, et al., The Geochemistry of Two Pressurized Brines From the Castile Formation in the Vicinity of the Waste Isolation Pilot Plant (WIPP) Site, April","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611928,"raw_reference":"EEG-22 EEG Review Comments on the Geotechnical Reports Provided by DOE to EEG Under the Stipulated Agreement Through March 1, 1983, April 1983.","cited_authors":"EEG-22 EEG Review Comments on the Geotechnical Reports Provided by DOE to EEG Under the Stipulated Agreement Through March 1","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611929,"raw_reference":"EEG-23 Neill, Robert H., et al., Evaluation of the Suitability of the WIPP Site, May 1983.","cited_authors":"EEG-23 Neill, Robert H., et al., Evaluation of the Suitability of the WIPP Site, May","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611930,"raw_reference":"EEG-24 Neill, Robert H. and James K. Channell, Potential Problems From Shipment of HighCurie Content Contact-Handled Transuranic (CH-TRU) Waste to WIPP, August 1983.","cited_authors":"EEG-24 Neill, Robert H. and James K. Channell, Potential Problems From Shipment of HighCurie Content Contact-Handled Transuranic (CH-TRU) Waste to WIPP, August","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611931,"raw_reference":"EEG-25 Chaturvedi, Lokesh, Occurrence of Gases in the Salado Formation, March 1984.","cited_authors":"EEG-25 Chaturvedi, Lokesh, Occurrence of Gases in the Salado Formation, March","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611932,"raw_reference":"WIPP, November 1984. LIST OF EEG REPORTS (CONTINUED)","cited_authors":"WIPP, November","cited_year":"1984","cited_title":"LIST OF EEG REPORTS (CONTINUED)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611933,"raw_reference":"EEG-27 Rehfeldt, Kenneth, Sensitivity Analysis of Solute Transport in Fractures and Determination of Anisotropy Within the Culebra Dolomite, September 1984.","cited_authors":"EEG-27 Rehfeldt, Kenneth, Sensitivity Analysis of Solute Transport in Fractures and Determination of Anisotropy Within the Culebra Dolomite, September","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611934,"raw_reference":"EEG-28 Knowles, H. B., Radiation Shielding in the Hot Cell Facility at the Waste Isolation Pilot Plant: A Review, November 1984.","cited_authors":"EEG-28 Knowles, H. B., Radiation Shielding in the Hot Cell Facility at the Waste Isolation Pilot Plant: A Review, November","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611935,"raw_reference":"EEG-29 Little, Marshall S., Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project, May 1985.","cited_authors":"EEG-29 Little, Marshall S., Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project, May","cited_year":"1985","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611936,"raw_reference":"EEG-30 Dougherty, Frank, Tenera Corporation, Evaluation of the Waste Isolation Pilot Plant Classification of Systems, Structures and Components, July 1985.","cited_authors":"EEG-30 Dougherty, Frank, Tenera Corporation, Evaluation of the Waste Isolation Pilot Plant Classification of Systems, Structures and Components, July","cited_year":"1985","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611937,"raw_reference":"EEG-31 Ramey, Dan, Chemistry of the Rustler Fluids, July 1985.","cited_authors":"EEG-31 Ramey, Dan, Chemistry of the Rustler Fluids, July","cited_year":"1985","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611938,"raw_reference":"EEG-32 Chaturvedi, Lokesh and James K. Channell, The Rustler Formation as a Transport Medium for Contaminated Groundwater, December 1985.","cited_authors":"EEG-32 Chaturvedi, Lokesh and James K. Channell, The Rustler Formation as a Transport Medium for Contaminated Groundwater, December","cited_year":"1985","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611939,"raw_reference":"EEG-33 Channell, James K., et al., Adequacy of TRUPACT-I Design for Transporting Contact-Handled Transuranic Wastes to WIPP, June 1986.","cited_authors":"EEG-33 Channell, James K., et al., Adequacy of TRUPACT-I Design for Transporting Contact-Handled Transuranic Wastes to WIPP, June","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611940,"raw_reference":"EEG-34 Chaturvedi, Lokesh, (edi.), The Rustler Formation at the WIPP Site, February 1987.","cited_authors":"EEG-34 Chaturvedi, Lokesh, (edi.), The Rustler Formation at the WIPP Site, February","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611941,"raw_reference":"EEG-35 Chapman, Jenny B., Stable Isotopes in Southeastern New Mexico Groundwater: Implications for Dating Recharge in the WIPP Area, October 1986.","cited_authors":"EEG-35 Chapman, Jenny B., Stable Isotopes in Southeastern New Mexico Groundwater: Implications for Dating Recharge in the WIPP Area, October","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611942,"raw_reference":"Evaporites, WIPP Site, New Mexico, April 1987.","cited_authors":"Evaporites, WIPP Site, New Mexico, April","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611943,"raw_reference":"EEG-37 Rodgers, John C., Exhaust Stack Monitoring Issues at the Waste Isolation Pilot Plant, November 1987.","cited_authors":"EEG-37 Rodgers, John C., Exhaust Stack Monitoring Issues at the Waste Isolation Pilot Plant, November","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611944,"raw_reference":"EEG-38 Rodgers, John C. and Jim W. Kenney, A Critical Assessment of Continuous Air Monitoring Systems at the Waste Isolation Pilot Plant, March 1988.","cited_authors":"EEG-38 Rodgers, John C. and Jim W. Kenney, A Critical Assessment of Continuous Air Monitoring Systems at the Waste Isolation Pilot Plant, March","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611945,"raw_reference":"EEG-39 Chapman, Jenny B., Chemical and Radiochemical Characteristics of Groundwater in the Culebra Dolomite, Southeastern New Mexico, March 1988.","cited_authors":"EEG-39 Chapman, Jenny B., Chemical and Radiochemical Characteristics of Groundwater in the Culebra Dolomite, Southeastern New Mexico, March","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611946,"raw_reference":"EEG-40 Review of the Final Safety Analyses Report (Draft), DOE Waste Isolation Pilot Plant, December 1988, May 1989.","cited_authors":"EEG-40 Review of the Final Safety Analyses Report (Draft), DOE Waste Isolation Pilot Plant, December","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611947,"raw_reference":"EEG-41 Review of the Draft Supplement Environmental Impact Statement, DOE Waste Isolation Pilot Plant, July 1989.","cited_authors":"EEG-41 Review of the Draft Supplement Environmental Impact Statement, DOE Waste Isolation Pilot Plant, July","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611948,"raw_reference":"LIST OF EEG REPORTS (CONTINUED) EEG-42 Chaturvedi, Lokesh, Evaluation of the DOE Plans for Radioactive Experiments and Operational Demonstration at WIPP, September 1989.","cited_authors":"LIST OF EEG REPORTS (CONTINUED) EEG-42 Chaturvedi, Lokesh, Evaluation of the DOE Plans for Radioactive Experiments and Operational Demonstration at WIPP, September","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611949,"raw_reference":"EEG 1985-1988, January 1990. EEG-44 Greenfield, Moses A., Probabilities of a Catastrophic Waste Hoist Accident at the Waste Isolation Pilot Plant, January 1990.","cited_authors":"EEG","cited_year":"1985-1988","cited_title":"January 1990","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611950,"raw_reference":"EEG-45 Silva, Matthew K., Preliminary Investigation into the Explosion Potential of Volatile Organic Compounds in WIPP CH-TRU Waste, June 1990.","cited_authors":"EEG-45 Silva, Matthew K., Preliminary Investigation into the Explosion Potential of Volatile Organic Compounds in WIPP CH-TRU Waste, June","cited_year":"1990","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611951,"raw_reference":"EEG-46 Gallegos, Anthony F. and James K. Channell, Risk Analysis of the Transport of Contact Handled Transuranic (CH-TRU) Wastes to WIPP Along Selected Highway Routes in New Mexico Using RADTRAN IV, August 1990.","cited_authors":"EEG-46 Gallegos, Anthony F. and James K. Channell, Risk Analysis of the Transport of Contact Handled Transuranic (CH-TRU) Wastes to WIPP Along Selected Highway Routes in New Mexico Using RADTRAN IV, August","cited_year":"1990","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611952,"raw_reference":"WIPP Project by EEG During 1989, December 1990.","cited_authors":"WIPP Project by EEG During","cited_year":"1989","cited_title":"December 1990","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611953,"raw_reference":"EEG-48 Silva, Matthew, An Assessment of the Flammability and Explosion Potential of Transuranic Waste, June 1991.","cited_authors":"EEG-48 Silva, Matthew, An Assessment of the Flammability and Explosion Potential of Transuranic Waste, June","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611954,"raw_reference":"EEG-49 Kenney, Jim, Preoperational Radiation Surveillance of the WIPP Project by EEG During 1990, November 1991.","cited_authors":"EEG-49 Kenney, Jim, Preoperational Radiation Surveillance of the WIPP Project by EEG During","cited_year":"1990","cited_title":"November 1991","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611955,"raw_reference":"WIPP on Compliance with EPA TRU Waste Disposal Standards, June 1992.","cited_authors":"WIPP on Compliance with EPA TRU Waste Disposal Standards, June","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611956,"raw_reference":"EEG-51 Kenney, Jim W., Preoperational Radiation Surveillance of the WIPP Project by EEG During 1991, October 1992.","cited_authors":"EEG-51 Kenney, Jim W., Preoperational Radiation Surveillance of the WIPP Project by EEG During","cited_year":"1991","cited_title":"October 1992","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611957,"raw_reference":"EEG-52 Bartlett, William T., An Evaluation of Air Effluent and Workplace Radioactivity Monitoring at the Waste Isolation Pilot Plant, February 1993.","cited_authors":"EEG-52 Bartlett, William T., An Evaluation of Air Effluent and Workplace Radioactivity Monitoring at the Waste Isolation Pilot Plant, February","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611958,"raw_reference":"EEG-53 Greenfield, Moses A. and Thomas J. Sargent, A Probabilistic Analysis of a Catastrophic Transuranic Waste Hoist Accident at the WIPP, June 1993.","cited_authors":"EEG-53 Greenfield, Moses A. and Thomas J. Sargent, A Probabilistic Analysis of a Catastrophic Transuranic Waste Hoist Accident at the WIPP, June","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611959,"raw_reference":"EEG-54 Kenney, Jim W., Preoperational Radiation Surveillance of the WIPP Project by EEG During 1992, February 1994.","cited_authors":"EEG-54 Kenney, Jim W., Preoperational Radiation Surveillance of the WIPP Project by EEG During","cited_year":"1992","cited_title":"February 1994","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611960,"raw_reference":"LIST OF EEG REPORTS (CONTINUED) EEG-55 Silva, Matthew K., Implications of the Presence of Petroleum Resources on the Integrity of the WIPP, June 1994.","cited_authors":"LIST OF EEG REPORTS (CONTINUED) EEG-55 Silva, Matthew K., Implications of the Presence of Petroleum Resources on the Integrity of the WIPP, June","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611961,"raw_reference":"EEG-56 Silva, Matthew K. and Robert H. Neill, Unresolved Issues for the Disposal of RemoteHandled Transuranic Waste in the Waste isolation Pilot Plant, September 1994.","cited_authors":"EEG-56 Silva, Matthew K. and Robert H. Neill, Unresolved Issues for the Disposal of RemoteHandled Transuranic Waste in the Waste isolation Pilot Plant, September","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611962,"raw_reference":"EEG-57 Lee, William W.-L, Lokesh Chaturvedi, Matthew K. Silva, Ruth Weiner, and Robert H. Neill, An Appraisal of the 1992 Preliminary Performance Assessment for the Waste Isolation Pilot Plant, September 1994.","cited_authors":"EEG-57 Lee, William W.-L, Lokesh Chaturvedi, Matthew K. Silva, Ruth Weiner, and Robert H. Neill, An Appraisal of the 1992 Preliminary Performance Assessment for the Waste Isolation Pilot Plant, September","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611963,"raw_reference":"EEG-58 Kenney, Jim W., Paula S. Downes, Donald H. Gray, Sally C. Ballard, Radionuclide Baseline in Soil Near Project Gnome and the Waste Isolation Pilot Plant, June 1995.","cited_authors":"EEG-58 Kenney, Jim W., Paula S. Downes, Donald H. Gray, Sally C. Ballard, Radionuclide Baseline in Soil Near Project Gnome and the Waste Isolation Pilot Plant, June","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611964,"raw_reference":"EEG-59 Greenfield, Moses A. and Thomas J. Sargent, An Analysis of the Annual Probability of Failure of the Waste Hoist Brake System at the Waste Isolation Pilot Plant (WIPP), November 1995.","cited_authors":"EEG-59 Greenfield, Moses A. and Thomas J. Sargent, An Analysis of the Annual Probability of Failure of the Waste Hoist Brake System at the Waste Isolation Pilot Plant (WIPP), November","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611965,"raw_reference":"EEG-60 Bartlett, William T. and Ben A. Walker, The Influence of Salt Aerosol on Alpha Radiation Detection by WIPP Continuous Air Monitors, January 1996.","cited_authors":"EEG-60 Bartlett, William T. and Ben A. Walker, The Influence of Salt Aerosol on Alpha Radiation Detection by WIPP Continuous Air Monitors, January","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611966,"raw_reference":"Standards, March 1996. EEG-62 Silva, Matthew K., Fluid Injection for Salt Water Disposal and Enhanced Oil Recovery as a Potential Problem for the WIPP: Proceedings of a June 1995 Workshop and Analysis, August 1996.","cited_authors":"Standards, March","cited_year":"1996","cited_title":"EEG-62 Silva, Matthew K., Fluid Injection for Salt Water Disposal and Enhanced Oil Recovery as a Potential Problem for the WIPP: Proceedings of a June 1995 Workshop and Analysis, August 1996","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611967,"raw_reference":"EEG-63 Maleki, Hamid and Lokesh Chaturvedi, Stability Evaluation of the Panel 1 Rooms and the E140 Drift at WIPP, August 1996.","cited_authors":"EEG-63 Maleki, Hamid and Lokesh Chaturvedi, Stability Evaluation of the Panel 1 Rooms and the E140 Drift at WIPP, August","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611968,"raw_reference":"EEG-64 Neill, Robert H., James K. Channell, Peter Spiegler, Lokesh Chaturvedi, Review of the Draft Supplement to the WIPP Environmental Impact Statement, DOE/EIS-0026S-2, April 1997.","cited_authors":"EEG-64 Neill, Robert H., James K. Channell, Peter Spiegler, Lokesh Chaturvedi, Review of the Draft Supplement to the WIPP Environmental Impact Statement, DOE/EIS-0026S-2, April","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611969,"raw_reference":"EEG-65 Greenfield, Moses A. and Thomas J. Sargent, Probability of Failure of the Waste Hoist Brake System at the Waste Isolation Pilot Plant (WIPP), January 1998.","cited_authors":"EEG-65 Greenfield, Moses A. and Thomas J. Sargent, Probability of Failure of the Waste Hoist Brake System at the Waste Isolation Pilot Plant (WIPP), January","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611970,"raw_reference":"EEG-66 Channell, James K. and Robert H. Neill, Individual Radiation Doses From Transuranic Waste Brought to the Surface by Human Intrusion at the WIPP, February 1998.","cited_authors":"EEG-66 Channell, James K. and Robert H. Neill, Individual Radiation Doses From Transuranic Waste Brought to the Surface by Human Intrusion at the WIPP, February","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611971,"raw_reference":"LIST OF EEG REPORTS (CONTINUED) EEG-67 Kenney, Jim W., Donald H. Gray, and Sally C. Ballard, Preoperational Radiation Surveillance of the WIPP Project by EEG During 1993 Though 1995, March 1998.","cited_authors":"LIST OF EEG REPORTS (CONTINUED) EEG-67 Kenney, Jim W., Donald H. Gray, and Sally C. Ballard, Preoperational Radiation Surveillance of the WIPP Project by EEG During 1993 Though","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611972,"raw_reference":"Waste, March 1998. EEG-69 Rucker, Dale, Sensitivity Analysis of Performance Parameters Used In Modeling the Waste Isolation Pilot Plant, April 1998.","cited_authors":"Waste, March","cited_year":"1998","cited_title":"EEG-69 Rucker, Dale, Sensitivity Analysis of Performance Parameters Used In Modeling the Waste Isolation Pilot Plant, April 1998","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611973,"raw_reference":"EEG-70 Bartlett, William T. and Jim W. Kenney, EEG Observations of the March 1998 WIPP Operational Readiness Review Audit, April 1998.","cited_authors":"EEG-70 Bartlett, William T. and Jim W. Kenney, EEG Observations of the March 1998 WIPP Operational Readiness Review Audit, April","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611974,"raw_reference":"EEG-71 Maleki, Hamid, Mine Stability Evaluation of Panel 1 During Waste Emplacement Operations at WIPP, July 1998.","cited_authors":"EEG-71 Maleki, Hamid, Mine Stability Evaluation of Panel 1 During Waste Emplacement Operations at WIPP, July","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611975,"raw_reference":"EEG-72 Channell, James K. and Robert H. Neill, A Comparison of the Risks From the Hazardous Waste and Radioactive Waste Portions of the WIPP Inventory, July 1999.","cited_authors":"EEG-72 Channell, James K. and Robert H. Neill, A Comparison of the Risks From the Hazardous Waste and Radioactive Waste Portions of the WIPP Inventory, July","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611976,"raw_reference":"EEG-73 Kenney, Jim W., Donald H. Gray, Sally C. Ballard, and Lokesh Chaturvedi, Preoperational Radiation Surveillance of the WIPP Project by EEG from 1996 - 1998, October 1999.","cited_authors":"EEG-73 Kenney, Jim W., Donald H. Gray, Sally C. Ballard, and Lokesh Chaturvedi, Preoperational Radiation Surveillance of the WIPP Project by EEG from 1996 -","cited_year":"1998","cited_title":"October 1999","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611977,"raw_reference":"EEG-74 Greenfield, Moses A. and Thomas J. Sargent, Probability of Failure of the TRUDOCK Crane System at the Waste Isolation Pilot Plant (WIPP), April 2000.","cited_authors":"EEG-74 Greenfield, Moses A. and Thomas J. Sargent, Probability of Failure of the TRUDOCK Crane System at the Waste Isolation Pilot Plant (WIPP), April","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611978,"raw_reference":"EEG-75 Channell, James K. and Ben A. Walker, Evaluation of Risks and Waste Characterization Requirements for the Transuranic Waste Emplaced in WIPP During 1999, May 2000.","cited_authors":"EEG-75 Channell, James K. and Ben A. Walker, Evaluation of Risks and Waste Characterization Requirements for the Transuranic Waste Emplaced in WIPP During","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611979,"raw_reference":"EEG-76 Rucker, Dale F., Air Dispersion Modeling at the Waste Isolation Pilot Plant, August 2000.","cited_authors":"EEG-76 Rucker, Dale F., Air Dispersion Modeling at the Waste Isolation Pilot Plant, August","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611980,"raw_reference":"EEG-77 Oversby, Virginia M., Plutonium Chemistry Under Conditions Relevant for WIPP Performance Assess, Review of Experimental Results and Recommendations for Future Work, September 2000.","cited_authors":"EEG-77 Oversby, Virginia M., Plutonium Chemistry Under Conditions Relevant for WIPP Performance Assess, Review of Experimental Results and Recommendations for Future Work, September","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611981,"raw_reference":"EEG-78 Rucker, Dale F., Probabilistic Safety Assessment of Operational Accidents at the Waste Isolation Pilot Plant, September 2000.","cited_authors":"EEG-78 Rucker, Dale F., Probabilistic Safety Assessment of Operational Accidents at the Waste Isolation Pilot Plant, September","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611982,"raw_reference":"LIST OF EEG REPORTS (CONTINUED) EEG-79 Gray, Donald H., Jim W. Kenney, Sally C. Ballard, Operational Radiation Surveillance of the WIPP Project by EEG During 1999, September 2000.","cited_authors":"LIST OF EEG REPORTS (CONTINUED) EEG-79 Gray, Donald H., Jim W. Kenney, Sally C. Ballard, Operational Radiation Surveillance of the WIPP Project by EEG During","cited_year":"1999","cited_title":"September 2000","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611983,"raw_reference":"EEG-80 Kenney, Jim W., Recommendations to Address Air Sampling Issues at WIPP, January 2001.","cited_authors":"EEG-80 Kenney, Jim W., Recommendations to Address Air Sampling Issues at WIPP, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":4611984,"raw_reference":"WIPP Project During 2000, October 2001. EEG-82 Allen, Lawrence E., Matthew K. Silva, James K. Channell, John F. Abel, and Dudley R. Morgan, Evaluation of Proposed Panel Closure Modifications at WIPP, December 2001.","cited_authors":"WIPP Project During","cited_year":"2000","cited_title":"October 2001","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}