H. Rept. 119-824: HIGH-CAPACITY GRID ACT
The Committee on Energy and Commerce, to whom was referred the bill (H.R. 6633) to establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass.
Original sourcePDF (340 KB)Text (34 KB)
References: 6 extracted, 0 linked to papers
Electric Power Research Institute (EPRI), Powering Intelligence: Updated Scenarios of U.S. Data Center Electricity Usage and Power Strategies (February 2026) https://www.epri.com/research/products/000000003002034696.
Lawrence Berkeley National Laboratory (LBNL), United States Data Center Energy Usage Report: 2025 Update (June 2026) https://eta.lbl.gov/publications/united-states-data-centerenergy-2025.
North American Electric Reliability Corporation (NERC), Long-Term Reliability Assessment (January 2026) https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf.
Wood Mackenzie, Why US power transmission needs reinventing (August 2026) https://www.woodmac.com/news/opinion/why-us-power-transmission-needs-reinventing/.
Idaho National Laboratory, Advanced Conductor Scan Report (September 2024) https://inl.gov/content/uploads/2024/04/23-50856_R13_-AdvConductorsScanProjectReportCompressed.pdf.
Energy Innovation Policy and Technology Inc. & Grid Lab, Supporting Advanced Conductor Deployment: Barriers and Policy Solutions (April 2024) https://www.2035report.com/wp-content/uploads/2024/04/Supporting-Advanced-Conductor-Deployment-Barriers-and-Policy-Solutions.pdf.