ARPA-E Technical Support Memorandum
Other documents for the same rulemaking (all, by stage)
References: 6 extracted, 0 linked to papers
FERC, Project No. 4306, Order Amending License, Mississippi Lock and Dam No. 2 Hydrokinetic Project (Dec. 13, 2008).
Protection, Roosevelt Island Tidal Energy (RITE) Environmental Assessment, Summary Sheet (2009), http://www.nyserda.org/programs/environment/EMEP/project/9892/alternative_energy_9892.pdf. area, and a characterization and analysis of the river’s benthic habitat. These monitoring activities showed no observed evidence of increased fish mortality or injury as a result of turbine operation, nor any irregular bird impacts in the project area. The data demonstrated that fish avoid zones of impact with Verdant Power’s system and populate inshore areas. 27 Verdant Power and NYSERDA’s environmental monitoring program indicates that, at its current scale, the RITE project does not significantly impact the surrounding environment. 28 References: Draft Environmental Report for FERC License Application, including monitoring data, available at http://www.theriteproject.com/Documents.html (See Volume 2, Parts 1-3).
PMSS Ltd., Wave Dragon Pre-Commercial Wave Energy Device, Environmental Statement, Non-Technical Summary, Vol. I (April 2007). Id. at 8. Id. at 8-9. Id. at 10. Id. at 10, 14. Id. at 10-11. Id. at 11. The potential impacts to rocky reef, intertidal, and beach areas as a result of cable landfall are negligible to moderate.58 The potential impacts to bird species are minor.59 Wave Dragon submitted PMSS’s Environmental Statement to UK regulatory authorities in April 2007 for review and consent. At this time, the Environmental Statement remains under review. References: Environmental Statement, Non-Technical Summary, available at http://waveenergy.dk/files/WDNTS.pdf?PHPSESSID=03be3fac970efe4b40fd724696c5ba8e E. South West Regional Development Agency - Wave Hub (United Kingdom) Developed by the South West Regional Development Agency (RDA) in the UK, Wave Hub operates as a “power splitter” under the sea. Wave Hub’s core purpose is to serve as a central connector for various wave and sea power generation devices, permitting centralized transmission of electricity to an on-shore station for delivery to the power grid.
OpenHydro, Press Release, “OpenHydro Successfully Deploys 1MW Commercial Tidal Turbine in the Bay of Fundy” (Nov. 17, 2009), http://www.openhydro.com/news/OpenHydroPR-171109.pdf .
AECOM Canada Ltd., Environmental Assessment Registration Document – Fundy Tidal Energy Demonstration Project, Vol. I – Environmental Assessment (June 2009), at 13-14. As part of the FORCE tidal demonstration initiative, the NSP project was subject to environmental review under an Environmental Assessment prepared by AECOM Canada Ltd. and approved by the Nova Scotia Department of Environment.65 AECOM’s Environmental Assessment considered the potential impact of deploying the OpenHydro turbine, in conjunction with two other demonstration turbines, on marine benthos, marine fish, marine mammals, marine birds, marine and terrestrial species at risk, terrestrial wildlife and wildlife habitat, water quality, intertidal environment, recreational and commercial fishing, archaeological and heritage resources, and tourism and recreation. 66 On balance, AECOM’s Environmental Assessment determined that, with the implementation of proposed mitigation measures, the tidal demonstration initiative would not result in any significant environmental impacts. 67 To ensure that no significant impacts will arise, the project is accompanied by a comprehensive monitoring program managed by FORCE, in conjunction with Nova Scotia Power, the Nova Scotia Department of the
BAL Chile S.A. – Macroalgae Mariculture for Production of Biofuels (Chile) Environmental Report, Multiple Wave Energy Converter Project (2007), at 41. Id. at 42. Id. at 43. Id. at 49.