U.S. DOT/FRA - Notice of Proposed Rulemaking and Regulatory Impact Analysis for Train Crew Staffing NPRM
Original sourceAttachment (102 KB)Attachment (27 KB)Attachment (970 KB)Attachment (16 KB)Attachment (35 KB)Attachment (230 KB)Attachment (781 KB)Attachment (113 KB)Attachment (1.3 MB)Attachment (54 KB)Attachment (90 KB)Attachment (96 KB)Attachment (78 KB)Attachment (110 KB)Attachment (115 KB)Attachment (71 KB)Attachment (4.3 MB)Attachment (1.1 MB)Attachment (2.9 MB)Attachment (460 KB)Attachment (501 KB)Attachment (1.2 MB)Attachment (548 KB)Attachment (380 KB)Attachment (5.9 MB)Attachment (336 KB)Attachment (61 KB)
Other documents for the same rulemaking (all, by stage)
References: 234 extracted, 118 linked to papers
Discussion of Current Class I Operations Using Vehicles When Assisting Trains, AAR, March 28, 2014.
Use of Locomotive Horns at Highway-Rail Grade Crossings; Interim Final Rule, Federal Register, December 18, 2003, p. 70603.
Borbely, A. (1982). A two-process model of sleep regulation. Human Neurobiology, 1, 195204.
Daan, S., Beersma, D., and Borbely, A. (1984). Timing of human sleep: recovery process gated by a circadian pacemaker. American Journal of Physiology, 246, R161–178.
Federal Railroad Administration. (2011). Measurement and estimation of sleep in railroad worker employees. (RR11-02). (available at http://www.fra.dot.gov/eLib/details/L01337)
Gertler, J., & DiFiore, A. (2009). Work schedules and sleep patterns of railroad train and engine service workers. (DOT/FRA/ORD-09/22). Washington, DC: Federal Railroad Administration.
Gertler, J., & DiFiore, A. (2011). Work schedules and sleep patterns of railroad train and engine service employees in passenger operations. (DOT/FRA/ORD-11/05).
Gertler, J., & Viale, A. (2006). Work Schedules and Sleep Patterns of Railroad Signalmen. (DOT/FRA/ORD-06/16).
Gertler, J., & Viale, A. (2006). Work Schedules and Sleep Patterns of Railroad Maintenance of Way Workers. (DOT/FRA/ORD-06/25).
Gertler, J., & Viale, A. (2007). Work Schedules and Sleep Patterns of Railroad Dispatchers. (DOT/FRA/ORD-07/11).
Gertler, J., Hursh, S., Fanzone, J., & Raslear, T. (2012). Validation of FAST model sleep estimates with actigraph measured sleep in locomotive engineers. (DOT/FRA/ORD-12/05).
Hursh, S., Balkin, T., Miller, J., & Eddy, D. (2004b). The fatigue avoidance scheduling tool: Modeling to minimize the effect of fatigue on cognitive performance. SAE Transactions, 113, 1, 111–119.
Hursh, S., Fanzone, J., & Raslear, T. (2011). Analysis of the relationship between operator effectiveness measures and economic impacts of rail accidents. (DOT/FRA/ORD-11/13).
Hursh, S., Raslear, T., Kaye, S., & Fanzone, J. (2006). Validation and calibration of a fatigue assessment tool for railroad work schedules, summary report. (DOT/FRA/ORD06/21).
Hursh, S., Raslear, T., Kaye, S., & Fanzone, J. (2008). Validation and calibration of a fatigue assessment tool for railroad work schedules, final report. (DOT/FRA/ORD08/04).
Hursh, S., Redmond, D., Johnson, M., Thorne, D., Belenky, G., Balkin, T., Storm, W., Miller, J., and Eddy, D. (2004a). Fatigue models for applied research in warfighting. Aviation, Space, and Environmental Medicine, 75, A44–53.
Kumamoto, H., & Henley, E. (1996). Probabilistic risk assessment and management for engineers and scientists (2nd ed.). New York: IEEE Press.
National Sleep Foundation. (2008). 2008 Sleep in America poll.
National Transportation Safety Board. (1991a). Railroad Accident Report: Collision and Derailment of Norfolk Southern Train 188 with Norfolk Southern Train G-38 at Sugar Valley, Georgia, August 9, 1990. (NTSB/RAR-91/02).
National Transportation Safety Board. (1991b). Railroad Accident Report: Atchison, Topeka and Santa Fe Railway Company (ATSF) Freight Trains ATSF 818 and ATSF 891 on the ATSF Railway, Corona, California, November 8, 1990. (NTSB/RAR-91/03).
National Transportation Safety Board. (1999). Safety Report: Evaluation of U.S. Department of Transportation Efforts in the 1990s to Address Operator Fatigue (NTSB Number SR-99/01).
Parzen, E. (1960). Modern probability theory and its applications. New York: Wiley.
Pollard, J. (1996). Locomotive engineer's activity diary. (Report No. DOT/FRA/RRP-96/02).
Raslear, T.G., Hursh, S.R., & Van Dongen, H.P.A. (2011). Predicting cognitive impairment and accident risk. In H.P.A. Van Dongen and G.A. Kerkhof (eds.), Progress in Brain Research, Vol. 190.
Raslear, T. (2011). Criteria and procedures for validating biomathematical models of human performance and fatigue: Procedures for analysis of work schedules (Docket No. FRA2009-0043-0003).
Roach, G., Fletcher, A., & Dawson, D. (2004). A model to predict work-related fatigue based on hours of work. Aviation, Space, and Environmental Medicine, 75, A61–69.
Tabak, B., & Raslear, T.G. (2010). Procedures for validation and calibration of human fatigue models: The Fatigue Audit InterDyne tool. (Report No. DOT/FRA/ORD-10/14).
Thomas, G., Raslear, T., & Kuehn, G. (1997). The effects of work schedule on train handling performance and sleep of locomotive engineers: a simulator study. (Report No. DOT/FRA/ORD-97-09).
Young, T., Palta, M., Dempsey, J., Skatrud, J., Weber, S., & Bare, S. (1993). The occurrence of sleep-disordered breathing among middle-aged adults. New England Journal of Medicine, 328, 1230–1235.
Shapiro, J., Quinn, J., & Barnes-Farrell, J. (2013). Rail Industry Job Analysis: Passenger Conductor. DOT/FRA/ORD-13/07.
Rosenhand, H., Roth, E., & Multer, J. (2012). Cognitive and Collaborative Demands of Freight Conductor Activities: Results and Implications of a Cognitive Task Analysis. DOT/FRA/ORD-12/13.
Walsh, B., Golay, L., Barnes-Farrell, J. & Morrow, S. (2010). A job analysis design for the rail industry: Description and model job analysis for the job of freight conductor. IPAC TR-2010-01.
Morrow, S., Walsh, B., & Barnes-Farrell, J. (2009). Shiftwork schedule management gap analysis. IPAC TR-2009-03.
Roth, E., & Multer, J. (2009). Technology implications of a cognitive task analysis for locomotive engineers. (DOT/FRA/ORD-09/03).
Sanders, M. S., Jankovich, J. J., & Goodpaster, P. R. (1974). Task analysis for the jobs of freight train conductor and brakeman. (Publication No. RTDR 263).
Savage, Ian (1998).
FRA, Impact of the Staggers Rail Act of 1980 (2011).
Webber, Sheila Simsarian, and Richard J. Klimoski. “ Crews: A distinct type of work team.” Journal of Business and Psychology, 18.3, pp. 261–279 (2004).
Roop, Stephen S., et al., Rail Crew Resource Management (CRM): The Business Case for CRM Training in the Railroad Industry, No. DOT/FRA/ORD-07/21 (2007).
Kunreuther, Howard, and Mark V. Pauly, Encouraging Mitigation Against Disasters Through Private and Public Sector Initiatives (2012).
Roth, Emilie, Hadar Rosenhand, and Jordan Multer, Using Cognitive Task Analysis to Inform Issues in Human Systems Integration in Railroad Operations, No. DOT/FRA/ORD-13/31 (2013).
Li, Guohua, et al., “ Drug Violations and Aviation Accidents: Findings From the U.S. Mandatory Drug Testing Programs.” Addiction, 106.7, pp. 1287–1292 (2011).
Westergren, A., et al, Journal of Clinical Nursing, Vol. 10, Issue 2, p. 268 (March 2001).
Rosenhand, Hadar, Emilie Roth, and Jordan Multer, “ Cognitive and Collaborative Demands of Freight Conductor Activities Results and Implications of a Cognitive Task Analysis,” Proceedings of the Human Factors and Ergonomics Society Annual Meeting, Vol. 55, No. 1, SAGE Publications, p. 30 (2011).
Oliver Wyman, report sponsored by the AAR
STB, A Study of Competition in the U.S. Freight Railroad Industry and Analysis of Proposals That Might Enhance Competition (2008).
TRB conference report on Teamwork in U.S. Railroad Operations
Wreathall et al. (2007) indicated that risk of human error can also arise in cases where the PTC system malfunctions.
Wreathall, J., Woods, D. D., Bing, A. J. and Christoffersen, K. (2007). Relative risk of workload transitions in positive train control. Washington, D C: U. S. Department of Transportation/Federal Railroad Administration. DOT/FRA/ORD-07/12.
Pasquini, et al. (2004), reviewing an Italian cab signal system