{"document":{"doc_id":25234,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Safety of Hazardous Regulatory Impact Analysis","date":"2019-10-02","url":"https://www.regulations.gov/document/PHMSA-2010-0229-0137","source_native_id":"PHMSA-2010-0229-0137","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2010-0229"],"rins":["RIN 2137-AE66"],"related":[{"doc_id":14604,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines","date":"2010-10-18"},{"doc_id":14370,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines","date":"2011-01-04"},{"doc_id":131024,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting on RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid","date":"2014-06-24"},{"doc_id":25237,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"U.S. DOT/PHMSA - Regulatory Impact Analysis (RIA)","date":"2015-10-01"},{"doc_id":25243,"source":"ria","org":"PHMSA","doc_type":"economic_analysis","title":"U.S. DOT/PHMSA - Small Business Economic Impact Screening Analysis (SBREFA)","date":"2015-10-01"},{"doc_id":10375,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Hazardous Liquid Pipelines","date":"2015-10-13"},{"doc_id":7500,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Hazardous Liquid Pipelines","date":"2019-10-01"},{"doc_id":25245,"source":"ria","org":"PHMSA","doc_type":"economic_analysis","title":"Safety of Hazardous - Small Business Economic Impact Screening Analysis","date":"2019-10-02"},{"doc_id":129371,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on March 18, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"}],"references":[{"citation_id":297566,"raw_reference":"ORNL, 2013","cited_authors":"ORNL","cited_year":"2013","cited_title":null,"cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 1.1.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297567,"raw_reference":"Kiefner and Associates, 2012","cited_authors":"Kiefner and Associates","cited_year":"2012","cited_title":null,"cited_venue":"Kiefner and Associates","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 1.1.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297568,"raw_reference":"Carruthers, 2006","cited_authors":"Carruthers","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 2.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297569,"raw_reference":"Parfomak, 2013","cited_authors":"Parfomak","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 2.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297570,"raw_reference":"Pharris and Kolpa, 2007","cited_authors":"Pharris and Kolpa","cited_year":"2007","cited_title":"Argonne National Laboratory Environmental Science Division report on pipeline natural hazards","cited_venue":"Argonne National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297571,"raw_reference":"Porter et al., 2011","cited_authors":"Porter et al.","cited_year":"2011","cited_title":"Study for the United States Geological Survey and the California Geological Survey on pipeline damage from ground shaking","cited_venue":"United States Geological Survey; California Geological Survey","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297572,"raw_reference":"Woodyard, 1996","cited_authors":"Woodyard","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 3.3.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":297573,"raw_reference":"AOPL and API, 2011","cited_authors":"AOPL and API","cited_year":"2011","cited_title":"Annual infrastructure study, Pipeline Performance Tracking System","cited_venue":"Association of Oil Pipe Lines; American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.1.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298725,"raw_reference":"Kiefner and Maxey, 2013","cited_authors":"Kiefner, J. F., and Maxey, W.A.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 3.7.1 Baseline","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298726,"raw_reference":"Kiefner, J. F., and Maxey, W.A. (2000). \"The benefits and limitations of hydrostatic testing.\" API's 51st Annual Pipeline Conference & Cybernetics Symposium, New Orleans, Louisiana (April 18-20, 2000","cited_authors":"Kiefner, J. F., and Maxey, W.A.","cited_year":"2000","cited_title":"The benefits and limitations of hydrostatic testing","cited_venue":"API's 51st Annual Pipeline Conference & Cybernetics Symposium, New Orleans, Louisiana","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298727,"raw_reference":"Kiefner and Associates (2012). “Leak Detection Study.” DTPH56-11-D-000001. Final Report No. 12-173.","cited_authors":"Kiefner and Associates","cited_year":"2012","cited_title":"Leak Detection Study","cited_venue":"Final Report No. 12-173, DTPH56-11-D-000001","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.2 Analysis of Costs and Benefits","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298728,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). (2012a). “Final Report, Leak Detection Study—DTPH56-11-D-000001.” Prepared by Kiefner and Associates for the U.S. Department of Transportation.","cited_authors":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_year":"2012","cited_title":"Final Report, Leak Detection Study—DTPH56-11-D-000001","cited_venue":"Prepared by Kiefner and Associates for the U.S. Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.1 Baseline","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298729,"raw_reference":"Center for Transportation Analysis (CTA). (2016). Freight Analysis Data Tabulation Tool (FAF4).","cited_authors":"Center for Transportation Analysis (CTA)","cited_year":"2016","cited_title":"Freight Analysis Data Tabulation Tool (FAF4)","cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":"http://faf.ornl.gov/fafweb/Extraction1.aspx","ref_kind":"dataset","section":"Section 3.4 Benefits (fn 42)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298730,"raw_reference":"Greene’s Energy Group, LLC (2013). Budgetary Proposal. Various 12”, 24” & 36” Pipelines Located In Nashville, Tennessee. Prepared for PHMSA.","cited_authors":"Greene's Energy Group, LLC","cited_year":"2013","cited_title":"Budgetary Proposal. Various 12”, 24” & 36” Pipelines Located In Nashville, Tennessee","cited_venue":"Prepared for PHMSA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.5 Alternatives Considered (fn 44)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298731,"raw_reference":"Gulf Interstate Engineering. 2017. Pipeline Testing, Inspection, and Replacement Cost Estimates. Gulf Project No.: 1765.","cited_authors":"Gulf Interstate Engineering","cited_year":"2017","cited_title":"Pipeline Testing, Inspection, and Replacement Cost Estimates","cited_venue":"Estimate Basis Memorandum, prepared for Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298732,"raw_reference":"Oak Ridge National Laboratory (ORNL). (2013). “Review of Existing Federal and State Regulations for Gas and Hazardous Liquid Gathering Lines” ORNL/TM-2013/133.","cited_authors":"Oak Ridge National Laboratory (ORNL)","cited_year":"2013","cited_title":"Review of Existing Federal and State Regulations for Gas and Hazardous Liquid Gathering Lines","cited_venue":"ORNL/TM-2013/133","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298733,"raw_reference":"National Transportation Safety Board (2006). Supervisory Control and Data Acquisition (SCADA) in Liquid Pipelines. Safety Study NTSB/SS-05/02.","cited_authors":"National Transportation Safety Board","cited_year":"2006","cited_title":"Supervisory Control and Data Acquisition (SCADA) in Liquid Pipelines","cited_venue":"Safety Study NTSB/SS-05/02","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.2 Analysis of Costs and Benefits","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298734,"raw_reference":"U.S. Department of Transportation (DOT). (2007). “Leak Detection Technology Study for the PIPES Act, H.R. 5782.”","cited_authors":"U.S. Department of Transportation (DOT)","cited_year":"2007","cited_title":"Leak Detection Technology Study for the PIPES Act, H.R. 5782","cited_venue":"U.S. DOT","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.1 Baseline","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298735,"raw_reference":"Carruthers, C. (2006). “Preliminary Cost-Benefit Analysis of the Oil Spill Contingency Plan Rule.” Washington State Department of Ecology.","cited_authors":"Carruthers, C.","cited_year":"2006","cited_title":"Preliminary Cost-Benefit Analysis of the Oil Spill Contingency Plan Rule","cited_venue":"Washington State Department of Ecology, Spill Prevention, Preparedness, Response Program","cited_doi":null,"cited_url":"https://fortress.wa.gov/ecy/publications/SummaryPages/0608013.html","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298736,"raw_reference":"No, T. A. (1993). “Economic Impacts of Oil Spills: Spill Unit Costs for Tankers, Pipelines, Refineries, and Offshore Facilities.” Prepared for U.S. Department of Energy.","cited_authors":"No, T. A.","cited_year":"1993","cited_title":"Economic Impacts of Oil Spills: Spill Unit Costs for Tankers, Pipelines, Refineries, and Offshore Facilities","cited_venue":"U.S. Department of Energy: Office of Domestic and International Energy Policy","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298737,"raw_reference":"Parfomak, P.W. (2013). “Keeping America’s Pipelines Safe and Secure: Key Issues for Congress” Congressional Research Service, p. 25.","cited_authors":"Parfomak, P.W.","cited_year":"2013","cited_title":"Keeping America's Pipelines Safe and Secure: Key Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298738,"raw_reference":"Pharris, T.C., and Kolpa, R.L. (2007). “Overview of the Design, Construction, and Operation of Interstate Liquid Petroleum Pipelines.” p. 29.","cited_authors":"Pharris, T.C., and Kolpa, R.L.","cited_year":"2007","cited_title":"Overview of the Design, Construction, and Operation of Interstate Liquid Petroleum Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298739,"raw_reference":"Porter, K., Jones, L., Cox, D., Goltz, J., and Hudnut, K. (2011). “The ShakeOut scenario: A hypothetical Mw7. 8 earthquake on the southern San Andreas fault.” Earthquake Spectra, 27(2), 239-261.","cited_authors":"Porter, K., Jones, L., Cox, D., Goltz, J., and Hudnut, K.","cited_year":"2011","cited_title":"The ShakeOut scenario: A hypothetical Mw7.8 earthquake on the southern San Andreas fault","cited_venue":"Earthquake Spectra, 27(2)","cited_doi":"10.1193/1.3563624","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":56547,"paper_title":"The ShakeOut Scenario: A Hypothetical M w 7.8 Earthquake on the Southern San Andreas Fault","paper_year":2011,"paper_doi":"10.1193/1.3563624"},{"citation_id":298740,"raw_reference":"Pipeline101. (2010). “Overview: Crude Oil Pipelines.”","cited_authors":"Pipeline101","cited_year":"2010","cited_title":"Overview: Crude Oil Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298741,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). (2013). “Results of Hazardous Liquid Incidents at Certain Inland Water Crossings Study.” Report to Congress.","cited_authors":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_year":"2013","cited_title":"Results of Hazardous Liquid Incidents at Certain Inland Water Crossings Study","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298742,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). (2016b). “Pipeline Incident 20 Year Trends.”","cited_authors":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_year":"2016","cited_title":"Pipeline Incident 20 Year Trends","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"http://phmsa.dot.gov/pipeline/library/datastatistics/pipelineincidenttrends","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298743,"raw_reference":"Woodyard, Chris (1996). “Safety Panel Faults Design of Pipelines, Flood in 1994 Led to River Blaze.” Houston Chronicle, September 5, 1996.","cited_authors":"Woodyard, Chris","cited_year":"1996","cited_title":"Safety Panel Faults Design of Pipelines, Flood in 1994 Led to River Blaze","cited_venue":"Houston Chronicle","cited_doi":null,"cited_url":null,"ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298744,"raw_reference":"Association of Oil Pipelines (AOPL). (2015). “Pipeline Safety Records Show Improved Safety Performance.”","cited_authors":"Association of Oil Pipelines (AOPL)","cited_year":"2015","cited_title":"Pipeline Safety Records Show Improved Safety Performance","cited_venue":"AOPL","cited_doi":null,"cited_url":"http://www.aopl.org/safety/improved-safety record/","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":298745,"raw_reference":"Bureau of Labor Statistics (BLS). (2016). “May 2014 National Industry-Specific Occupational Employment and Wage Estimates: NAICS 211100.”","cited_authors":"Bureau of Labor Statistics (BLS)","cited_year":"2016","cited_title":"May 2014 National Industry-Specific Occupational Employment and Wage Estimates: NAICS 211100","cited_venue":"BLS","cited_doi":null,"cited_url":"http://www.bls.gov/oes/current/naics4_211100.htm#11-0000","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}