Pavement Score Synthesis FHWATX-090-6386-1 2009
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking
References: 55 extracted, 0 linked to papers
Jackson, N.C., Development of Revised Pavement Condition Indices for Portland Cement Concrete Pavement for the WSDOT Pavement Management System WA-RD 682.3, November 2008, Washington State Department of Transportation, Olympia
Kay, R. K., Mahoney, J. P, Jackson, N. C., “The WSDOT Pavement Management System – A 1993 Update,” WSDOT Report No. WA-RD-274.1, Washington State Department of Transportation, Olympia WA, September 1993.
Lots, Report No. CERL-TR-M-294, U.S. Army Construction Engineering Research Laboratory, Champaign IL, October 1981. Standard Guide for Conducting Subjective Pavement Ride Quality Ratings, American Society for Testing of Materials, ASTM Book of Standards Volume 04.03, E1927-98, West Conshohocken, PA, 1998. B-10
Deighton, R. and J.Sztraka, Pavement Condition dTV Technical Guide Vol. 3. Deighton and Associates Ltd, Bowmansville, Ont., July 1995. New Vermont Agency Transportation Pavement Performance Models; Phase I Report Deighton and Associates and Applied Pavement Technology, Feb. 2005. B-12
ALABAMA DOT 1. We generate a report, and associated map, based on the age of the pavement and traffic. We have a “default” decay curve that we use to give that pavement a score based on the age. Then a further deduct is made based on the traffic. The traffic deduct = ( AADT/312.5)1/2 which means that an additional 8 points was subtracted for an AADT = 20,000. Don’t ask me how the equation was derived. It is what one of our field offices was doing and the Pavement Management Steering Committee liked they started to apply statewide back in the early 1990s. The attachment has different curves that we recently looked at. Our resurfacing threshold score is 55. The original curve was based on my predecessor’s engineering judgment from year 0 to 4 and, since we design our overlays for 8 B-13 years, at year 8 the score is 55. After we looked at our historic rating data we discovered that, on average, it was taking 11 years for the pavement to reach 55.