Produced Water Management and Beneficial Use - [DCN SGE00100]
Other documents for the same rulemaking (all, by stage)
References
Brown, R. W., 1958. Fort Union Formation in the Powder River Basin, Wyoming: Wyoming Geological Association 13th Annual Field Conference Guidebook, p. 111-113.
Cherven, V. B., and Jacob, A. F., 1985. Evolution of Paleogene depositional systems, Williston
SEPM Symposium volume 3, p. 127-170. Flores, R. M., and Ethridge, F. G., 1985. Evolution of intermontane fluvial systems of Tertiary Powder River Basin, Montana and Wyoming: in Flores, R. M., and Kaplan, S. S. (eds.), Cenozoic Paleogeography of west-central United States: Rocky Mountain Section of
McDonald, R. E., 1972. Eocene and Paleocene rocks of the southern and central Basins, in Rocky Mountain Association of Geologists, 1972, Geologic Atlas of the Rocky Mountain
Region, p. 243-256. Ogunsina, O. O., and Wiggins, M. L., 2005. Review of Down-hole Separation Technology:
SPE Technical Paper No. 94276. Robinson, Peter, 1972. Tertiary History, in Rocky Mountain Association of Geologists, 1972, Geologic Atlas of the Rocky Mountain Region, p. 233-242.
Rose, S. C., Buckwalter, J. F., and Woodhall, R. J., 2001. The Design Engineering Aspects of Water flooding: Society of Petroleum Engineers, Monograph 11, p. 11-23.
Tiab, D., and Donaldson, E. C., 2004. Radial Flow Systems, Petrophysics: Reservoir Rock
Properties, Gulf Publishing Company, p. 434-447. U.S. Dept. of the Interior and State of Montana, 2002. Final Statewide Oil and Gas Environmental Impact Statement and Proposed Amendment of the Powder River and Billings Resource Management Plans:
U.S.G.S. Fort Union Coal Assessment Team, 1999. 1999 Resource Assessment of selected Tertiary coal beds and zones in the northern Rocky Mountains and Great Plains region:
U.S.G.S. Professional Paper 1625-D, compact discs 1 & 2. Van Voast, W. A., 2003. Geochemical signature of formation waters associated with coalbed methane: American Association of Petroleum Geologists Bulletin, vol. 87, no. 4, p. 667676.
Vuke, S. M., Heffern, E. L., Bergantino, R. N., and Colton, R. B., 2001. Geologic map of the Lame Deer 30’ X 60’ Quadrangle, eastern Montana: Montana Bureau of Mines and Geology Open-File Report MBMG-428, scale 1:100,000.
Vuke, S. M., Heffern, E. L., Bergantino, R. N., and Colton, R. B., 2001. Geologic map of the Powderville 30’ X 60’ Quadrangle, eastern Montana: Montana Bureau of Mines and Geology Open-File Report MBMG-429, scale 1:100,000.
Vuke, S. M., Heffern, E. L., Bergantino, R. N., and Colton, R. B., 2001. Geologic map of the Birney 30’ X 60’ Quadrangle, eastern Montana: Montana Bureau of Mines and Geology Open-File Report MBMG-431, scale 1:100,000.
Vuke, S. M., Heffern, E. L., Bergantino, R. N., and Colton, R. B., 2001. Geologic map of the Broadus 30’ X 60’ Quadrangle, eastern Montana: Montana Bureau of Mines and Geology Open-File Report MBMG-432, scale 1:100,000.
Wheaton, John, and Donato, Teresa, 2004. Coalbed-methane basics: Powder River Basin, Montana: Montana Bureau of Mines and Geology, Information Pamphlet 5, 20 p. 9-22 Final Report: Produced Water Management and Beneficial Use
Wo, Shaochang, Lopez, D. A., and Whiteman, Jason, Sr., 2004. Northern Cheyenne Reservation coal bed natural resource assessment and analysis of produced water disposal options: Idaho National Engineering and Environmental Laboratory final report for DOE Contract DE-AC07-99ID13727, 46p. 9-23 Final Report: Produced Water Management and Beneficial Use Appendix 9.A Powder River Basin Typical CBM Water Disposal Well Sketch T58N, R79W, Sheridan County, Wyoming
CEMENTING BEST PRACTICES SOURCE: Halliburton Energy Services, Evansville, WY, July 2006. 1. Cement quality and weight: You must choose a cement slurry that is designed to solve the problems specific to each casing string. 2. Waiting time: You must hold the cement slurry in place and under pressure until it reaches its’ initial set without disturbing it. A cement slurry is a time-dependent liquid and must be allowed to undergo a hydration reaction to produce a competent cement sheath. A fresh cement slurry can be worked (thickening or pump time) as long as it is in a plastic state and before going through it’s’ transition phase. If the cement slurry is not allowed to transition without being disturbed, it may be subjected to changes in density, dilution, settling, water separation, and gas cutting that may lead to a lack of zonal isolation and possible bridging in the annulus. 3. Pipe movement: Pipe movement may be one of the single most influential factors in mud removal. Reciprocation and/or rotation mechanically breaks up gelled mud and changes the flow patterns in the annulus to improve displacement efficiency. 4. Mud properties (for cementing): a. Rheology: i. Plastic Viscosity (PV) < 15 centipoise (cp) ii. Yield Point (YP) < 10 lb/100 ft2 iii. These properties should be reviewed with the Mud Engineer, Drilling
Ameridia, 2007. Personal Communication to Obtain Cost Estimations from D. Bar of Ameridia, September – November.
AWWA, 2004. Water Desalting Planning Guide for Water Utilities, John Wiley & Sons Inc.
Boysen, R., J. Boysen, J. Boysen, and D. Boysen. 2003. Natural Gas Produced Water Management Decision Tree Model. GRI Report No. GRI-03/0072.
Dallbauman, Liese and Sirivedhin, Tanita. 2003. “Reclamation of Produced Water for Beneficial Use.” Separation Science and Technology, 40:1, 185-200.
Doran, G. and L.Y.C. Leong. 2000. Developing a Cost Effective Environmental Solution for Produced Water and Creating a “New” Water Resource. U.S. Department of Energy Report DOE/MT/95008-4.
Hayes, T. 2004. “The electrodialysis alternative for produced water management.” GasTIPS, 10(3):15-20.
Hayes, T. and D. Arthur. Oct. 12, 2004. “Overview of Emerging Produced Water Treatment Technologies.” 11th International Petroleum Environmental Conference, IPEC Proceedings.
Hergert, G.W.; Knudsen, D., Aug. 1997. Irrigation Water Quality Criteria, publication G77328-A, Cooperative Extension, Institute of Agriculture and Natural Resources, University of Nebraska – Lincoln. http://www.ianr.unl.edu/pubs/water/g328.htm (accessed Sept 2003)
Lawrence, A.W., et al. 1998. Evaluation of Results from Lysite Wyoming Produced Water Treatment System Field Experiment. GRI Report No. GRI-07/0287.
Lawrence, A.W., et al., 1995. GRI ProWCalc : Produced Water Calculation Cost Model User’s Manual. GRI Report No. GRI-07/0287. 10-32 Final Report: Produced Water Management and Beneficial Use
PUBLICATIONS TO DATE Hayes, T., P. Moon and S. Snyder. 2006. “Integrated Electrodialysis for Cost Effective CBM Produced Water Demineralization.” Abstract Submitted to COGA-RMAG Conference.
Denver, CO, August 7-9. Hayes, T., P. Moon, and S. Snyder. 2006. “Transforming CBM Produced Water to Beneficial Use Through Electrodialysis Processing,” Technical Poster at the Colorado State University Produced Water Workshop, Fort Collins, CO, April 4-5.
Moon, P., Hayes, T. and, LeClair S. 2008. Electrodialysis Treatment of Produced Water from the Powder River Basin for Beneficial Use. To be submitted to Separation Science and Technology.
Moon, P., Snyder, S., and Hayes, T., June 11-13, 2006. Integrated Electrodialysis Process for
CBM Produced Water Treatment, Paper # 107248, Rocky Mountain Section of American Association of Petroleum Geologists, Billings, Montana, http://www.aapg.org/, Rocky Mountain Section of AAPG Conference (June 2006).
CONFERENCES Hayes, T., D. Arthur, 2005. Treatment Technologies for Coalbed Methane Produced Water Management. Rocky Mountain Section – AAPG, Jackson Hole, WY, September.
Hayes, T., Gowelly, S., Moon, P., and Snyder, S. Oct. 17-20, 2006. Electrodialysis Treatment of Coal Bed Methane Produced Water: Application Issues and Projections of Costs, International Petroleum Environmental Conference, San Antonio, Texas.
Hayes, T., Moon, P., and Snyder, S., April 4-5, 2006. Transforming CBM Produced Water to Beneficial Use Through Electrodialysis Processing, Produced Water Workshop, Fort
Moon, P., S. Snyder, and Hayes, T., Aug. 8, 2006. “Integrated Electrodialysis for Cost Effective CBM Produced Water Demineralization”, Presented at CERI Frontiers in Global Energy Session, RMAG Conference, Denver.
Moon, P., Snyder, S., and Hayes, T., Oct. 17-20, 2006. Integrated Electrodialysis Membrane Stability Results for Cost-Effective CBM Produced Water Demineralization, International Petroleum Environmental Conference, San Antonio, Texas. 10-33 Final Report: Produced Water Management and Beneficial Use
Wheaton, J., and Donato, T., 2004. Coalbed-methane basics: Powder River Basin, Montana: Montana Bureau of Mines and Geology, Informational Pamphlet 5, 25 pgs.
Wheaton, J., Redish-Kuzara, S., Donato, T.A., Hammer, L., 2007. 2006 Annual coalbed methane regional ground-water monitoring report: Northern portion of the Powder River Basin: Montana Bureau of Mines and Geology Open-File Report 556, 95 p., 3 sheets. 11-16 Final Report: Produced Water Management and Beneficial Use Appendix 11.A 11-17 Final Report: Produced Water Management and Beneficial Use 11-18 Final Report: Produced Water Management and Beneficial Use 11-19 Final Report: Produced Water Management and Beneficial Use