Cost of Compliance with Water Quality Criteria for Toxic Pollutants for Oregon Waters
Other documents for the same rulemaking (all, by stage)
References
Tellus Institute. 2000. Healthy Hospitals: Environmental Improvements Through EA.
Test America. 2007. Personal communication. December 11, 2007. June 2008
Theoretically, reverse osmosis (RO) can remove nearly all inorganic contaminants from water, (NDWC, 1997), as well as viruses and most organic contaminants, including some pesticides. The process removes contaminants from water using a semipermeable membrane that permits water, and not dissolved compounds, to pass through its pores. The contaminated water is subjected to high pressures that force pure water through the membrane, leaving pollutants behind in a brine solution (NDWC, 1997). Properly operated RO units can achieve 96% removal of arsenic (III), arsenic (IV), barium, cadmium, chromium (III), chromium (VI), fluoride, lead, mercury, nitrite, selenium (IV), selenium (VI), and silver. Multiple RO units operated in series, however, are capable of nondetectable or almost 100% removal rates (NDWC, 1997). 10 RO has several advantages, including: Removal of nearly all contaminant ions and most other dissolved contaminants Relatively insensitive to flow and total dissolved solids levels Also removes bacteria and particulates (NDWC, 1997).
However, despite these claims there are no full scale performance data available from wastewater treatment plants discharging to surface waters that indicate that such removals are possible at these facilities on a consistent basis. This may be due to the fact that few, if any, facilities have been required to reduce toxic pollutants to such low levels through the use of endof-pipe treatment. The use of RO for treating wastewater is limited, and therefore performance data are scarce. Because removal efficiencies are less than optimal when treating influents with low contaminant concentrations, performance testing using influent concentrations in the ppb (µg/L) or ppt (ng/L) range should be conducted on various types of wastewater to ensure that RO is capable of producing the appropriate effluent range. Even if the necessary pollutant levels are achievable with RO, it is important to consider the potential disadvantages and limitations of this technology, including: High capital and operating (including energy) costs (which increase with decreasing desired effluent concentrations) Management and disposal of residuals (brine and media) is potentially costly and problematic It was not clear how many data points or studies on which the percent removals are based. Also, NDWC (1997) does not indicate whether the percent removals represent single or dual stage RO processes. June 2008
Bruce, David A. 2004. Personal communication (email). July.
Calgon Carbon Corporation. 2002. Personal communication. For product called OLC 12x40, a coconut based GAC, with mesh size 12x40. June.
Destaillants, H., T.M. Lesko, M. Knowlton, H. Wallace, M.R. Hoffmann. 2001. Scale Up of Sonochemical Reactors for Water Treatment. Ind. Eng. Chem. Res.; 40(18), 3855 3860.
Environtrol. 2003. Personal communication with Bob Scherrer. For virgin GAC 12x40 coal, regular activity. May. Federal Remediation Technologies Roundtable (FRTR). 2002. Remediation Technologies Screening Matrix and Reference Guide, Version 4.0. Online at http://www.frtr.gov/matrix2/top_page.html.
Grieco, Scott A. 2007. Advanced Mercury Treatment Technologies: Strategies to Successfully Meet Lower Limits. Clearwaters: Winter 2007.
Hand, D.W., D.L. Perram, and J.C. Crittenden. 1995. Destruction of DBP Precursors with Catalytic Oxidation, American Water Works Association Journal, Vol. 87, No. 6, pp. 84 96.
Hua, I. and G. Zhang. 2000. Cavitation Chemistry of Polychlorinated Biphenyls: Decomposition mechanisms and Rates. Environmental Science and Technology. Vol. 34, No. 8 (1529 - 1534).
Klasson, K.T., D.T. Bostick, P.A. Taylor, L.L. Farr. 1999. Removal of Trace-Level Mercury from Surface Water. For Presentation at the Air and Waste Management Association’s 92nd Annual Meeting and Exhibition, June 20-24, 1999, St. Louis, MO.
Klasson, K.T., D.T. Bostick, L.L. Farr, D.R. McTaggart, P.A. Taylor. 2000. Demonstration of Mercury Sorbents to Meet DOE Customer Needs. ORNL/TM-2000/12.
MWRA/MASCO Mercury Workgroup. 1997. End-of-Pipe Subcommittee Mercury Workgroup Pretreatment Guidance Manual. Online at www.masco.org/mercury/pretreatment/index.html. June 2008
Appendix C. End-of-Pipe Treatment Controls and Costs C-15 Metcalf and Eddy. 2003. Wastewater Engineering: Treatment and Reuse. Fourth Edition. McGraw Hill: Boston.
Munter, Rein. 2001. Advanced Oxidation Processes - Current Status and Prospects. Proc. Estonian Acad. Sci. Chem. 50(2), 59-80. National Drinking Water Clearinghouse (NDWC). 1997. Tech Brief: Ion Exchange and Demineralization. Online at http://www.nesc.wvu.edu/ndwc/pdf/OT/TB/TB4_IonExchange.pdf Naval Facilities Engineering Command (NAVFAC). 2008. Environmental Restoration and
TAL. Powell, Tony. 2000. Treatment of PCBs in Water. Purifics ES Inc.
Price, G.J., M. Ashokkumar, F. Grieser. 2004. Sonoluminescence Quenching of Organic Compounds in Aqueous Solution: Frequency Effects and Implications for Sonochemistry. Journal of American Chemical Society, 126, 2755-2762.
Rahuman, M., L. Pistone, F. Trifirò, S. Miertus. 2000. Destruction Technologies for Polychlorinated Biphenyls (PCBs). UNIDO Publications: Proceedings of Expert Group Meetings on POPs and Pesticides Contamination.
Sherbondy, John. 2004. Tigg Corporation. Personal communication. July.
TN & Associates. 1998. Mercury Treatability Study Final Report, Oak Ridge Y-12 Plant, Oak
Ridge, Tennessee. BJC/OR-46. U.S. EPA. 2002. Arsenic Rule Training Sessions: Waste Disposal Issues. Online at http://www.epa.gov/safewater/ars/presentations/train6-residuals.pdf. U.S. EPA. 2000. Arsenic Removal from Drinking Water by Ion Exchange and Activated Alumina Plants. EPA 600-R-00-088. U.S. EPA. 1997. Capsule Report: Aqueous Mercury Treatment. EPA 625-R-97-004. Office of Research and Development, Washington D.C. U.S. EPA. 1996. Capsule Report: Reverse Osmosis. EPA 625-R-96-009. Office of Research and Development, Washington D.C. U.S. Environmental Protection Agency (EPA). 1991. Engineering Bulletin: Granular Activated Carbon Treatment. EPA/540/2-91/024. June 2008
Appendix C. End-of-Pipe Treatment Controls and Costs C-16 U.S. EPA. 1980. Summary Report: Control and Treatment Technology for the Metal Finishing
West General. 2004. Out of the Box Chemical Specifications: Mercury. Online at http://www.westgeneral.com/outofthebox/masterframeset.html. June 2008
Appendix D. Variance Procedures Based on Adverse Economic Impacts This appendix describes the analysis of the potential for compliance costs to result in substantial and widespread economic and social impacts pursuant to EPA (1995) guidance. Analysis for Public Sector Entities Public sector entities will evaluate whether the compliance costs associated with WQBELs will impose a substantial financial impact (estimate change in household sewer bills resulting from the compliance costs; evaluate financial health of the community), and whether such an impact would have widespread adverse economic and social impact. Substantial Impacts The analysis of whether compliance costs would impose a substantial financial impact involves the following steps. Verify Project Costs The first step of an economic analysis of a publicly financed project is to evaluate the appropriateness and the cost-effectiveness of the proposed project. Public entities should consider a broad range of discharge management options including pollution prevention, end-of-pipe treatment, and upgrades or additions to existing treatment. Specific types of pollution prevention activities that should be considered are (EPA, 1995): public education change in raw materials substitution of process chemicals change in process water recycling and reuse pretreatment requirements.
EPA (1995) provides worksheets to summarize general information regarding the proposed pollution control project. Calculate Annualized Cost per Household Since capital costs will be paid over several years, annualized costs are used to evaluate the economic burden to the community. The capital portion of project costs is financed by issuing a municipal debt instrument such as a general obligation bond or a revenue bond. Local governments may also finance capital costs using bank loans or state infrastructure loans (e.g., State Revolving Fund loans). State and federal grant funding may also be available for technology upgrades or other treatment options.
EPA (1995) also provides a worksheet for calculating the total annualized cost of the project. June 2008
EPA (1995) provides worksheets for calculating the cost per household. Municipal Preliminary Screener Whether or not the community is expected to incur “substantial” economic impacts due to the pollution control project is determined by jointly considering the results of two tests. The first test is a “screener” to establish whether the community can clearly pay for the project without incurring any substantial impacts. The Municipal Preliminary Screener, or MPS, is the total annual pollution control costs per household (existing costs plus those attributable to the proposed project) as a percentage of MHI.
EPA (1995) provides a worksheet for calculating and evaluating the MPS. If the MPS value is less than 1.0, there is little potential for substantial impacts and the analysis can conclude with a determination of no substantial impact. Communities are expected to incur mid-range impacts when the ratio of total annual compliance costs to MHI is between 1.0% and
EPA (1995), Table 2-1. Applicants then jointly evaluate results of the MPS and Secondary Test. Exhibit D-2 summarizes the scoring. An “X” in the matrix indicates that the impact is likely to be substantial.
EPA (1995) provides further discussion of evaluating the results. Exhibit D-2. Substantial Impacts Matrix Secondary Score Less than 1.5 Between 1.5 and 2.5 Greater than 2.5 Less than 1.0%
Appendix E. BMPs and Unit Costs for Nonpoint Sources Mining In the Willamette Basin mercury TMDL, DEQ does not specify the measures necessary to cleanup mines, only that it will continue efforts to remediate abandoned mine sites to minimize the flow of mercury into adjacent water bodies (ODEQ, 2006a). The Horse Heaven Mine is an abandoned mercury mine, located in the east-central portion of Jefferson County. Potential remedial actions to address the presence of mercury and arsenic in contaminated soils and groundwater may include: Excavation and on-site entombment and capping of contaminated soils
However, the cost of assessment and cleanup at abandoned mines varies widely. For example, elevated levels of mercury have been detected in soil at Bonanza Mine in Douglas County. ODEQ has spent about $500,000 to investigate the site and remove the most contaminated soil around one area of contamination. Black Butte Mine has been identified as a major contributor of mercury to the Cottage Grove Watershed. Although the mine is now abandoned, remnants from past mining activity are still readily visible. Site features include: 1) remnants of mining equipment including two mercury-extraction furnaces, tramway, and ore crusher; 2) tailings piles; and 3) mine openings (adits and stopes). Through 2004, ODEQ spent about $50,000 from Oregon’s Orphan Site Account for environmental investigation of the site. Municipal Storm Water In the Willamette Basin TMDL, DEQ requires all MS4s to address mercury through modifications to existing storm water management plans (SWMP), and all other areas to develop SWMPs for mercury (ODEQ, 2006a). In general, dischargers are required to control pollutants to the maximum extent practicable (MEP) through their SWMPs. As described in Section 2.2.2,
ODEQ interprets the MEP requirement to require all controls that are reasonable and available. In some areas this level of control may be necessary for compliance with baseline standards, in which case additional controls for compliance with revised criteria would not be required because all reasonable and available controls are already being implemented. In other areas, however, MEP controls may not be fully implemented and some incremental level of control may be necessary for compliance with the revised criteria. Thus, for any situation in which storm water sources are specifically required to control toxic pollutants to levels that are lower than what would be necessary under the baseline, potential compliance actions could include: increased or additional nonstructural BMPs – institutional, education, or pollution prevention practices designed to limit generation of runoff or reduce the pollutants load of runoff structural controls – engineered and constructed systems designed to provide water quantity or quality control. June 2008
EPA (1999). Detention systems capture runoff and temporarily retain it for later release. Detention systems do not retain a significant permanent pool of water between runoff events. These systems provide quantity and quality control; however, resuspension of particulate matter often occurs. Exhibit E-3 summarizes the different types of detention systems. Exhibit E-3. Summary of Storm Water Detention Systems System Type Description Primary purpose is quantity control. Typically designed to empty within 24 hours of a runoff event. Detention basin Limited quality control through gravity setting of suspended solids. Earthen basins achieve high levels of quality control by allowing some infiltration (however, ground water is then a risk of contamination). Same primary purpose as basins – storage to limit downstream effects due to high peak flow
Appendix E. BMPs and Unit Costs for Nonpoint Sources Filtration systems use some combination of a granular filtration media remove constituents found in runoff such as sand, soil, organic material, carbon, or membranes. Often these systems treat only the first half inch to inch of runoff, and are common at small sites such as parking lots and developments, in areas with high pollution potential such as industrial areas, or in highly urbanized areas where land availability or costs preclude the use of other controls (U.S. EPA, 1999). Exhibit E-4 summarizes the different types of filtration systems. Exhibit E-4. Summary of Storm Water Filtration Systems System Type Surface sand filter Underground vault sand filter Biofiltration/bioretention systems Description Most common system is the Austin sand filter. Runoff first enters a sedimentation basin where coarse particles are removed by gravity settling. The filter bed consists of sand with a gravel and perforated pipe under-drain system to capture the treated water. Common systems are the D.C. sand filter and the Delaware sand filter. Basic design premise is the same as the surface sand filter. Designed to mimic the functions of a natural forest ecosystem for treating storm water runoff. Variation of surface sand filter where sand filtration media is replaced with a planted soil bed. Pollutants are removed by a number of processes including adsorption, filtration, volatilization, ion exchange, and decomposition. Source: U.S.
EPA (1999). The performance of BMPs can vary considerably based on differences in the design criteria and performance standards. Factors that influence performance and design include size of the drainage area, the level of watershed imperviousness, duration and volume of runoff, and the June 2008
EPA (1999); Caltrans (2004). 1. Removal is considered to be 100% when the water is infiltrated and not discharged to surface waters. 2. Filters must be placed off-line to assure continued functioning; only provide treatment based on a design storm. The cost of constructing storm water controls depends on site conditions and drainage area.
EPA (1999) and the Caltrans (2001) provide cost estimates for various controls.
EPA’s Engineering and Analysis Division (EAD) reviewed and summarized the available information related to expected costs of storm water controls (U.S. EPA, 1999). EAD identified only three studies that systematically evaluated the construction costs associated with structural controls since 1985. EAD used these studies to develop construction costs for specified drainage size and percent impervious cover (Exhibit E-7). Exhibit E-7. Estimated Costs of Storm Water Controls in the U.S.
EPA (1999); escalated from 1997 dollars to 2007 dollars using the Environmental News Record (ENR) Construction Cost Index (CCI) and round to the near $500. 1. Range accounts for design variations. June 2008
EPA (1999) estimated that the design, contingency, and permitting costs equal approximately 25%-32% of the base construction costs. Land costs are extremely variable. For example, little or no land acquisition may be needed for a particular storm water control resulting in low or zero additional costs. However, if land acquisition is needed for the construction of a storm water control, the cost could potentially outweigh the design and construction costs combined.
EPA (1999) indicates that most studies estimate O&M costs as a fraction of base construction costs. O&M costs vary across controls and may also vary based on site and region specific parameters. Potential O&M costs are presented in Exhibit E-8. Exhibit E-8. Potential Annual O&M Costs for Storm Water Controls Control Type Infiltration basin Infiltration trenches Detention basins Retention basins Constructed wetlands Surface sand filters Bioretention Vegetated filter strips Grassed swales Percent of Construction Cost 1%-10% 5%-20% 3%-6% 2%-6% 11%-13% 5%-7% $320/acre (maintained) 5%-7% Source: U.S.
EPA (1999). The Portland Bureau of Environmental Services (BES) has also conducted a number of demonstration projects aimed at reducing the volume of storm water and pollutant loadings entering its combined sewer system. The project BMPs provide runoff volume control and water quality benefits, while improving the existing landscape: Storm water planters – vegetative landscaping added to parking garages and lots that capture and infiltrate runoff from paved surfaces; adds attractive green space to urban areas Curb extensions – landscaped add-ons to existing curbs designed to capture runoff from streets and side walks; can increase pedestrian safety Pervious pavers – use of paving blocks (rather than impervious asphalt) that allow storm water infiltration Landscape infiltration basin – landscaped basin and captures storm water Ecoroof - cover roof top with vegetation to absorb/retain storm water; roofscaping covers
Appendix E. BMPs and Unit Costs for Nonpoint Sources Federal Highway Administration (FHWA). 2002. Stormwater Best Management Practices in an Ultra-Urban Setting: Selection and Monitoring. May.
Appendix E. BMPs and Unit Costs for Nonpoint Sources E-10 Portland Bureau of Environmental Services (BES). 2002c. Barrington Square Apartments. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. Portland Bureau of Environmental Services (BES). 2002d. Page 19 LLC. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. Portland Bureau of Environmental Services (BES). 2002e. Natural Resource Program Eastside Field Office. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. Portland Bureau of Environmental Services (BES). 2002f. Reed College Apartments. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. Portland Bureau of Environmental Services (BES). 2001. Wattles Boys and Girls Club. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. Portland Bureau of Environmental Services (BES). 1999. Hamilton West Apartments Ecoroof. Online at http://www.portlandonline.com/bes/index.cfm?c=44463&. United States Environmental Protection Agency (U.S. EPA). 1999. Preliminary Data Summary of Urban Storm Water Best Management Practices. August. Washington County Soil and Water Conservation District (SWCD). 1999. Protection Your Land from Erosion. January. Washington Department of Ecology (Ecology). 2007. Stillaguamish River Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Temperature Total Maximum Daily Load: Water Quality Implementation Plan. June. June 2008
Appendix F. Sample Facility Results and Statewide Extrapolation This appendix provides a summary of the sample facility results and shows the extrapolation of statewide costs. Baseline Criteria Exhibit F-1 summarizes the potential compliance costs to the sample facilities associated with the baseline criteria scenario. Exhibit F-1. Potential Total Annual Compliance Costs for Sample Facilities: Baseline Criteria (millions 2007$) Facility Name Eugene/Springfield WPCF Portland Columbia Blvd WWTP Salem Willow Lake WWTP St Helen-Boise WWTP Oregon Steel Mills Astoria WWTP Brookings WWTP Coos Bay WWTP #2 Kellogg Creek WWTP McMinnville WRF North Bend WWTP Rock Creek WWTP