Blue Plains Tunnel Project Completion Report
Other documents for the same rulemaking (all, by stage)
References: 3 extracted, 0 linked to papers
DEPARTMENT OF LABOR, Occupational Safety and Health Administration, [Docket No. OSHA-2012-D035] Traylor/Skanska/Jay Dee Joint, Venture : Grant of a Permanent Variance Subject: Blue Plains Tunnel project completion report Dear Mr. Weisz, This document shall serve as a final report regarding the effectiveness of hyperbaric activities pertaining to the Blue Plains Tunnel project in Washington, DC. As you are aware, Traylor Bros., Inc. applied for a permanent variance to four regulations under OSHA Standard 29 CFR 1926.803 for compressed air work on April 26, 2012. A permanent variance was issued to Traylor/Skanska/Jay Dee JV (Federal Register I Vol. 80, No. 59/Friday, March 27, 2015/Notices)(copy enclosed). The following constitutes the final repo rt required within this variance for the Blue Plains Tunnel project. Introduction Traylor Bros., Inc. ("Traylor") is a Heavy Civil Contractor that works throughout the United States on complex tunnel projects using state-of-the-art equipment and procedures for soft ground tunneling. Traylor joint ventures with other contractors on most of its underground contracts. Traylor was the managing partner of Traylor I Skanska I Jay Dee Joint Venture ("Traylor JV"), the general contractor for DC Wate r's Blue Plains Tunnel. Traylor JV received an interim variance until the permanent variance was issued during the course ofthe project. Traylor
Laboratory, along the Joint Base Anacostia-Bolling military installation, adjacent to the 1-295 freeway, and terminated across the Anacostia River in the shadows of the Washington Nationals Park. List of the OSHA Standards (Regulations) from which TSJD received Variances: The four compressed air regulations under OSHA standard 29 CFR 1926.803 from which Traylor JV received permanent variances are: 1. 1926.803(e) Compression (5) No employee shall be subjected to pressure exceeding 50 pounds per square inch except in emergency. 2. 1926.803(f) Decompression (1) 5000 Overlook Ave SW • Washington, DC 20032 • Tel (202) 800-2510 • Fax (202) 800-2511 • www.traylor.com
DC Clean Rivers Project Division A - Blue Plains Tunnel Decompression to normal condition shall be in accordance with the Decompression Tables in appendix A ofthis subpart. 3. 1926.803(g)(1)(iii) Except where air pressure in the working chamber is below 12 p.s.i.g., each man lock shall be equipped with automatic controls which, through taped programs, cams, or similar apparatus, shall automatically regulate decompressions. It shall also be equipped with manual controls to permit the lock attendant to override the automatic mechanism in the event of an emergency, as provided in paragraph (g)(1)(viii) ofthis section. 4. 1926.803(g)(1)(xvii) A special decompression chamber of sufficient size to accommodate the entire force of employees being decompressed at the end of a shift shall be provided whenever the regularly established working period requires a total time of decompression exceeding 75 minutes. Further background information regarding the need and reasoning for the variances can be found in Federal Register I Vol. 80, No. 59 I Friday, March 27, 2015 I Notices. Notification Requirements The variance included the following notification requirement: K. Notifications I. To assist OSHA in administering the conditions specified herein, Traylor