RIA cited in FR 2016-01865: Waste Prevention, Production Subject to Royalties, and Resource Conservation
Other documents for the same rulemaking
References: 15 extracted, 1 linked to papers
Advanced Resources International, 2004, Review and Selection of Velocity Tubing Strings for Efficient Liquid Lifting in Stripper Gas Wells, Final Technical Report, May 31, 2004, U.S. Department of Energy, National Energy Technology Laboratory, Contract DE-FC26-00NT41025.
Turner, R.G. et al., 1969, Analysis and prediction of minimum flow rate for the continuous removal of liquids from gas wells, Journal of Petroleum
United States Environmental Protection Agency, 2010, Inventory of U.S. Greenhouse Gas Emissions and Sinks, 1990—2008, U.S. EPA #430R-10-606 (April 2010).
Wells, M., 2003, Gas Well Deliquification, Elsevier, USA
Barry, D., 2009, Liquid Loading, ABB Total Flow presentation, May 11, 2009; http://www.afms.org/Docs/liquids/LiquidLoad.pdf
BP, 2009, Well Venting and Completion Emission Estimation, 2009 Natural Gas STAR Annual Workshop, San Antonio, TX.
BP, 2006, Plunger Well Vent Reduction Project, 2006 Natural Gas STAR Workshop Brandywine Energy and Development Co., 2002, Design Development and Well Testing of a Prototype Tool for in Well Enhancement of Recovery of Natural Gas via Use of a Gas Operated Automatic Lift Pump, October 2002, U.S. Department of Energy, National Energy Technology Laboratory, Contract DE-FC26-00NT41025
Christiansen, R. L., 2006, A New Look at Foam for Unloading Gas Wells; Final Report, September 1, 2004 to December 31, 2005, DOE Contract DE-FC26-00NT42098, Pennsylvania State University, June 2006.
Dake, L.P. 1978, Fundamentals of Reservoir Engineering, First Edition,
Elsevier, Great Britain Devon Energy, 2006, Opportunities for Methane Emissions Reductions from Natural Gas Production, presentation to Producers Technology Transfer Workshop, Fort Worth, TX, June 6, 2006.
Elmer, B., and Gray, A., 2006, Design Considerations When Rod Pumping Gas Wells, Lufkin Automation, available at www.lufkinautomation.com.
Ghareeb, M., Frost, B., Tarr, C. and Sadek, N., 2008, Application of Beam Pumping System for High Gas/Oil Ratio wells, Middle East Artificial Lift Forum, Bahrain, February 16-18, 2008
McAllister, E.W. 1998, Pipe Line Rules of Thumb Handbook, Fourth
Petroleum Technology Transfer Council, 2005, Gas Field Technology, Solutions from the Field newsletter, April 28, 2005, 4 pp. Smarter clocks automate multiple well plunger lift, Oil & Gas Journal, August 21, 2006, volume 104, issue 31. Options for Removing Accumulated Fluid and Improving Flow in Gas Wells (Cont’d)
APPENDIX B: Estimating Incremental Production for Declining Wells From Dake's Fundamentals of Reservoir Engineering (1978) the following analytical model can be used to estimate increased gas flow into a well in response to reducing back pressure on the perforations by removing accumulated liquids. The semi-steady state inflow equation is: 222-1/16” 1/16" 1.7511.751 3/8" 1.995 2 7/8" m(pavg)-m(pwf)=[(1422 x Q x T)/(k x h)] x [ln(re/rw)-3/4+S)] x (8.15) 2.441 232-3/8” 3/8" 1.9951.995 1/2" 2.992 2000 2 2-7/8” 7/8" 2.4412.441 3 3-1/2” 1/2" 2.9922.992 Where, 1500 m(pavg) = real gas pseudo pressure average 1000 m(pwf) = real gas pseudo pressure well flowing Q = gas production rate T = absolute temperature 1,000 Wellhead Flowing Pressure, psia k = permeability h = formation height Source: S. Bumgardner, Advanced Resources International, inc. re = external boundary radius