Policy Replication

RIA cited in FR 2016-01865: Waste Prevention, Production Subject to Royalties, and Resource Conservation

Regulatory impact analysis2016-02-08 · Bureau of Land Management · regulatory_impact_analysis · web:42b3dad625581edaf0cc
RIN 1004-AE14

Other documents for the same rulemaking

2016-02-08 Regulatory impact analysisWaste Prevention Regulatory Impact Analysis
2016-02-08 Federal RegisterWaste Prevention, Production Subject to Royalties, and Resource Conservation
2016-03-09 Regulatory impact analysisData used in the bin analysis found in the economic analysis for the flaring impacts in NM/ND
2016-03-15 Regulatory impact analysisLeaseDist_NM_ND data_matched and unmatched -- additional data used in the bin analysis found in the economic analysis for the flaring impacts in NM/ND
2016-04-04 Federal RegisterWaste Prevention, Production Subject to Royalties, and Resource Conservation
2016-11-18 Federal RegisterWaste Prevention, Production Subject to Royalties, and Resource Conservation
2016-11-18 Regulatory impact analysisFinal Waste Prevention Economic Analysis
2016-12-08 Federal RegisterWaste Prevention, Production Subject to Royalties, and Resource Conservation; Correction
2017-06-15 Federal RegisterWaste Prevention, Production Subject to Royalties, and Resource Conservation; Postponement of Certain Compliance Dates

References: 15 extracted, 1 linked to papers

Page 1Download these results: CSV · JSON
Advanced Resources International, 2004, Review and Selection of Velocity Tubing Strings for Efficient Liquid Lifting in Stripper Gas Wells, Final Technical Report, May 31, 2004, U.S. Department of Energy, National Energy Technology Laboratory, Contract DE-FC26-00NT41025.
journal articleNot linked to a paper · refsec
Turner, R.G. et al., 1969, Analysis and prediction of minimum flow rate for the continuous removal of liquids from gas wells, Journal of Petroleum
United States Environmental Protection Agency, 2010, Inventory of U.S. Greenhouse Gas Emissions and Sinks, 1990—2008, U.S. EPA #430R-10-606 (April 2010).
government reportNot linked to a paper · refsec
Wells, M., 2003, Gas Well Deliquification, Elsevier, USA
research reportNot linked to a paper · refsec
Barry, D., 2009, Liquid Loading, ABB Total Flow presentation, May 11, 2009; http://www.afms.org/Docs/liquids/LiquidLoad.pdf
research reportNot linked to a paper · refsec · cited link
BP, 2009, Well Venting and Completion Emission Estimation, 2009 Natural Gas STAR Annual Workshop, San Antonio, TX.
research reportNot linked to a paper · refsec
BP, 2006, Plunger Well Vent Reduction Project, 2006 Natural Gas STAR Workshop Brandywine Energy and Development Co., 2002, Design Development and Well Testing of a Prototype Tool for in Well Enhancement of Recovery of Natural Gas via Use of a Gas Operated Automatic Lift Pump, October 2002, U.S. Department of Energy, National Energy Technology Laboratory, Contract DE-FC26-00NT41025
research reportNot linked to a paper · refsec
Christiansen, R. L., 2006, A New Look at Foam for Unloading Gas Wells; Final Report, September 1, 2004 to December 31, 2005, DOE Contract DE-FC26-00NT42098, Pennsylvania State University, June 2006.
research reportNot linked to a paper · refsec
Dake, L.P. 1978, Fundamentals of Reservoir Engineering, First Edition,
research reportNot linked to a paper · refsec
Elsevier, Great Britain Devon Energy, 2006, Opportunities for Methane Emissions Reductions from Natural Gas Production, presentation to Producers Technology Transfer Workshop, Fort Worth, TX, June 6, 2006.
research reportNot linked to a paper · refsec
Elmer, B., and Gray, A., 2006, Design Considerations When Rod Pumping Gas Wells, Lufkin Automation, available at www.lufkinautomation.com.
research reportNot linked to a paper · refsec
Ghareeb, M., Frost, B., Tarr, C. and Sadek, N., 2008, Application of Beam Pumping System for High Gas/Oil Ratio wells, Middle East Artificial Lift Forum, Bahrain, February 16-18, 2008
research reportNot linked to a paper · refsec
McAllister, E.W. 1998, Pipe Line Rules of Thumb Handbook, Fourth
journal articleNot linked to a paper · refsec
Petroleum Technology Transfer Council, 2005, Gas Field Technology, Solutions from the Field newsletter, April 28, 2005, 4 pp. Smarter clocks automate multiple well plunger lift, Oil & Gas Journal, August 21, 2006, volume 104, issue 31. Options for Removing Accumulated Fluid and Improving Flow in Gas Wells (Cont’d)
journal articleNot linked to a paper · refsec
APPENDIX B: Estimating Incremental Production for Declining Wells From Dake's Fundamentals of Reservoir Engineering (1978) the following analytical model can be used to estimate increased gas flow into a well in response to reducing back pressure on the perforations by removing accumulated liquids. The semi-steady state inflow equation is: 222-1/16” 1/16" 1.7511.751 3/8" 1.995 2 7/8" m(pavg)-m(pwf)=[(1422 x Q x T)/(k x h)] x [ln(re/rw)-3/4+S)] x (8.15) 2.441 232-3/8” 3/8" 1.9951.995 1/2" 2.992 2000 2 2-7/8” 7/8" 2.4412.441 3 3-1/2” 1/2" 2.9922.992 Where, 1500 m(pavg) = real gas pseudo pressure average 1000 m(pwf) = real gas pseudo pressure well flowing Q = gas production rate T = absolute temperature 1,000 Wellhead Flowing Pressure, psia k = permeability h = formation height Source: S. Bumgardner, Advanced Resources International, inc. re = external boundary radius
research reportNot linked to a paper · refsec