2967 ADS Cranberry Creek - Advanced Disposal Services Cranberry Creek Landfill WDNR License No. 02967 Wood County, Wisconsin, 2017 Annual Report
Other documents for the same rulemaking (all, by stage)
References: 5 extracted, 0 linked to papers
NR 506.135(5)(a) NR 507.215(1) Requirement The results of the liquid mass balance measurements for each drainage basin. Liquid mass balance is defined in NR 507.215(1) - The volumes of leachate extracted from each leachate drainage basin, the volumes of leachate recirculated into each drainage basin and monthly precipitation records from on-site instrumentation or the nearest national weather system station. Tables/Figures Table 4 - 2017 Liquid Mass Balance Measurements Notes / Data Sources See Table 4 Notes Figure 1 - Liquid Mass Balance Measurements - Site Figure 2 - Liquid Mass Balance - Drainage Basin 1 (Ph. 1 - 3) Figure 3 - Liquid Mass Balance - Drainage Basin 2 (Ph. 4A West) Figure 4 - Liquid Mass Balance - Drainage Basin 3 (Ph. 4A East) Figure 5 - Liquid Mass Balance - Drainage Basin 4 (Ph. 4B West) Figure 6 - Liquid Mass Balance - Drainage Basin 5 (Ph. 4B East) Figure 7 - Liquid Mass Balance - Drainage Basin 6 (Ph. 5A West) Figure 8 - Liquid Mass Balance - Drainage Basin 7 (Ph. 5A East) Figure 9 - Leachate Head Levels
NR 506.135(5)(c) Graphs showing the volumes of leachate extracted and recirculated and precipitation Figure 1 - Liquid Mass Balance Measurements - Site received for each leachate drainage basin. Figure 2 - Liquid Mass Balance - Drainage Basin 1 (Ph. 1 - 3) Attachment A - Leachate Head Elevation Data 1) Leachate head level data obtained from ESC. 2) No leachate head level graphs were prepared for headwells where monitoring results were zero throughout 2017. Monthly leachate head level monitoring data is provided in Attachment A. See Table 4 Notes Figure 3 - Liquid Mass Balance - Drainage Basin 2 (Ph. 4A West) Figure 4 - Liquid Mass Balance - Drainage Basin 3 (Ph. 4A East) Figure 5 - Liquid Mass Balance - Drainage Basin 4 (Ph. 4B West) Figure 6 - Liquid Mass Balance - Drainage Basin 5 (Ph. 4B East) Figure 7 - Liquid Mass Balance - Drainage Basin 6 (Ph. 5A West) Figure 8 - Liquid Mass Balance - Drainage Basin 7 (Ph. 5A East)
Reinhardt, D.R., and Barlaz, M.A., 2010, Landfill Gas Management: A Roadmap for EREF Directed Research, Environmental Research and Education Foundation, February 2010.
Reinhart, D.R., Faour, A.A., and You, H., 2005, First-Order Kinetic Gas Generation Model Parameters for Wet Landfills, prepared for USEPA, EPA-600/R-05/072, June 2005.
TECHNICAL MEMORANDUM March 28, 2018 Page 6 Attachments: Table 1 – Waste Characterization by WDNR Waste Category Table 2 – Modeled versus Actual Landfill Gas Flow Rates Table 3 – Cumulative Modeled Landfill Gas Generation and Actual Collection: 1970 – 2017 Table 4 – Cumulative Modeled Landfill Gas Generation and Actual Collection: 1993 – 2017 Figure 1 – Modeled Landfill Gas Generation and Actual Collection Figure 2 – Cumulative Modeled Landfill Gas Generation and Actual Collection: 1970 – 2017 Figure 3 – Cumulative Modeled Landfill Gas Generation and Actual Collection: 1993 – 2017 Attachment A – Detailed Waste Breakdown for 2017 Attachment B – LandGEM Waste Input Summary and LandGEM Reports