U.S. Department of Defense (2009). Demonstration of a Full-Scale Fluidized Bed Bioreactor for the Treatment of Perchlorate at Low Concentrations in Groundwater (Environmnetal Security Technology Certification Program (ESTCP) Final Report (ER-0543)
Other documents for the same rulemaking (all, by stage)
References
Aerojet. 2003. Personal Communication. Athavaley, Anjali. 2008. The Wall Street Journal, May 23, 2008.
Brown, J., R. Anderson, J. Min, L. Boulos, D. Prasifka, G. Juby, and S. McLean. 2004. The 2004 Perchlorate in California’s Groundwater GRA Symposium. Glendale, CA.
Brown, J.C., Anderson, R.D., Min, J.H., Boulos, L., Prasifka, D., and G.J.G. Juby, 2005. Jour.
AWWA, 97:9:70. California EPA, Department of Toxic Substances Control. 2004. Perchlorate Contaminant Treatment Alternatives-Draft. Version 1.01.
Coates, J. D. and L.A. Achenbach. 2004. Nature Rev. Microbiol. 2: 569-580.
Coates, J. D., U. Michaelidou, R.A. Bruce, S.M. O’Conner, J.N. Crespi, and L.A. Achenbach. 1999. Applied and Environmental Microbiology. 65: 5234-5241.
Delvecchio, M., A.P. Togna, and T.S. Webster. 2005. Proceedings of the 78th Annual Water Environment Federation’s Technical Exhibition and Conference. Washington D.C.
Evans, P.J., Dodrill, D., Schulz, C., Opitz, E., Blaha, F., and J. Albert. 2008. 2008 Battelle Conference on the Remediation of Chlorinated and Recalcitrant Compounds, Monterey, CA. GeoLogic Associates. 1997. Phase II Off-Site Evaluation Monitoring Program and Engineering Feasibility Study, Mid-Valley Sanitary Landfill, November. GeoLogic Associates. 2003. Evaluation of Perchlorate Impacts to Soils and Groundwater Near Former Bunker Area, Rialto, California, Volumes I-III, October. GeoLogic Associates. 2005. Groundwater Monitoring Well Installation Report, Rialto Airport
Geosyntec Consultants. 2007. Goodrich Corporation Progress Report for the Month of
September, 2007, 160-Acre Parcel, Rialto, California.
Hatzinger, P. 2005. Environmental Science and Technology. 39(11): 239A-247A.
Kengen, S. W. M., G.B. Rikken, W.R. Hagen, C.G. van Ginkel, and A.J.M. Stams. 1999. J. Bacteriol. 181: 6706-6711.
Massachusetts DEP. 2006. Website at http://www.mass.gov/dep/public/press/pchl0706.htm.
Accessed August, 2006. OMB (Office of Management and Budget), 2008. Website at www.whitehouse.gov/omb/circulars/a094/a94_appx-c.html.
Song, Y, and B.E. Logan. 2004. Water Resources. 38: 1626-1632.
Sutton, P. M. and P.N. Mishra. 1994. Water Science & Technology. 29: 309-317.
Togna, A.P., W.J. Guarini, S. Frisch, M. Del Vecchio, J. Polk, C. Murray, D.E. Tolbert. 2001. In A. Leeson (ed.), Bioremediation of Inorganic Compounds (The Sixth International In Situ and On-Site Bioremediation Symposium, San Diego, CA). 6(9): 281-288. Battelle Press, Columbus,
Univar, Personal Communication. 2008. U.S. Environmental Protection Agency, Office of Research and Development. 1993. Nitrogen Control Manual. EPA/625/R-93/010. Washington, D. C. U.S. Environmental Protection Agency, Office of Research and Development. 2002. Perchlorate Environmental Contamination: Toxicological Review and Risk Characterization. External Review Draft. NCEA-1-0503.
Wagner, N., and C. Drewry. 2000. Proceedings from the Perchlorate Technology Workshop, August 22 – 24, 2000, San Antonio, TX.
Webster, T.S., W.J. Guarini, and S. McLean. 2004. 2004 Battelle Conference on the Remediation of Chlorinated and Recalcitrant Compounds, Monterey, CA.
West Valley Water District, 2008. Personal Communication.
Woolfenden, L.R., and Kadhim, D. 1997. Geohydrology and Water Chemistry in the RialtoColton Basin, San Bernardino County, California United States Geological Survey Water Resources Investigation Report 97-4012.
Wu, J., R.F. Unz, H. Zhang, and B.E. Logan. 2001. Bioremediation Journal. 5: 119-130.
Zhang, H., M.A. Bruns, and B.E. Logan. 2002. Environmental Microbiology. 4: 570-576.
Lawrenceville, NJ 08648 Shaw Environmental, Inc. P: 609-895-5375 F: 609-895-1858 Atogna@basinwater.com P: 609-895-5346 F: 609-895-1858 mdelvecchio@basinwater.com P: 609-895-5377 F: 609-895-1858 dwatt@basinwater.com P: 626-497-5076 sam.wong@shawgrp.com Co-Principal Investigator Mike. Delvecchio Douglas Watt Sam Wong ______________________________________________ Signature Chief Engineer Lead Process Engineer Field Engineer 1-19-09 ________________ Date
DIANA M. BONTÁ, R.N., Dr. P.H. GRAY DAVIS Director April 2, 2002 Mr. Donald E. Vanderkar
Sacramento, California,” April 2001, prepared by Harding ESE, Denver, CO. “Review of Phase 2 Treatability Study Aerojet Facility Rancho Cordova, California,” July 2001, by Robert Clark, Ph.D., P.E.; Michael Kavanaugh, Ph.D., P.E; Prof. Perry
AWWA. Guidance Manual for Compliance With the Filtration and Disinfection Requirements for Public Water Systems Using Surface Water Sources. Denver, CO. 1991. Appendix D: UV Disinfection Study Protocol The following protocol was used to demonstrate the effectiveness of UV disinfection of finished water from the FBR treatment system. As with the chlorination study, the required level of disinfection was a 4-log inactivation of viruses and 4-5 log inactivations of bacteria. Typically,
UV Experiments Conditions Steady-State After Trimite (15 gpm) Steady-State After Trimite (25 gpm) Steady-State After Trimite (20 gpm) Before/After Backwash After Trimite (25 gpm) Steady-State After LGAC (25 gpm) Steady-State After LGAC (15/20/25 gpm) Before/After Backwash After Trimite (10/20/25 gpm) For each testing event, water samples were obtained for the finished water from the effluent of the Trimite multimedia filter or the LGAC unit and effluent of the UV disinfection system. A bypass line was set-up from the Trimite filter, around the LGAC unit, to the UV reactor so that a portion of the FBR treatment plant flow could go through the UV reactor and the LGAC unit, or directly from the LGAC to the UV reactor. Because of limitations of the pilot-scale UV equipment communicating with the FBR treatment plant, the UV system was not operated continuously. Instead, flow was initiated through the UV reactor and the unit was turned on 2030 minutes prior to sample acquisition. This period of time allowed for suitable warm-up of the
February, 1998. Due to the variation in the types of monitoring throughout the demonstration, data quality objective Levels I and III were used. Several feed groundwater chemical parameters, such as pH, temperature, ORP, and DO were determined in the field with immediate response required for process control (Level I). In addition, all on-site laboratory data generated was produced using data quality Level I. All off-site analytical laboratory measurements were performed using Level III criteria for production of validated data. Quality assurance objectives were established to evaluate the criteria of precision, accuracy, and completeness. The evaluation of these criteria for validated (Level III) off-site laboratory analyses were based upon sample duplicates, matrix spikes, matrix spike duplicates, and surrogates, as described in Section E.4.3. The criteria for precision, accuracy, and completeness