{"document":{"doc_id":224351,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pipeline Comments on DOT Notice of Regulatory Reform","date":"2020-06-09","url":"https://www.regulations.gov/document/PHMSA-2018-0046-0009","source_native_id":"PHMSA-2018-0046-0009","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2018-0046"],"rins":["RIN 2137-AF36"],"related":[{"doc_id":5531,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"PRIA for Gas Regulatory Reform NPRM","date":"2020-06-05"},{"doc_id":181275,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Environmental Assessment for Gas Regulatory Reform NPRM","date":"2020-06-05"},{"doc_id":181277,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Oak Ridge National Laboratories ASME BPVC report ORNL/TM-2017/66","date":"2020-06-05"},{"doc_id":181278,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Revised GD Annual Form and Instructions - PHMSA F 7100.1-1 (rev 10-2018)","date":"2020-06-05"},{"doc_id":181279,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Revised GD Incident Form and Instructions PHMSA F7100.1","date":"2020-06-05"},{"doc_id":181281,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Revised GD Annual Form and Instructions","date":"2020-06-05"},{"doc_id":181282,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Piping Technology Committee - Petition","date":"2020-06-05"},{"doc_id":181284,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"AGA Petition to Reconsider Final Part  192 281 and Part192 285 (002)","date":"2020-06-05"},{"doc_id":6975,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Gas Pipeline Regulatory Reform","date":"2020-06-09"},{"doc_id":220981,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Comment from Arkansas Independent Producers and Royalty Owners (AIPRO)","date":"2020-08-18"},{"doc_id":224236,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Interstate Natural Gas Association of America - Petition or Reconsideration on Pressure Vessels   2020.9.14","date":"2020-09-16"},{"doc_id":220600,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with PST","date":"2020-12-07"},{"doc_id":224146,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Farm Taps Enforcement Discretion","date":"2020-12-21"},{"doc_id":224147,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"2015 Stay of Enforcement Letter regarding Pressure Vessels","date":"2020-12-21"},{"doc_id":224144,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Granted Waiver -State of SDPUC for NorthWestern Energy Grant (1)","date":"2020-12-22"},{"doc_id":128893,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Gas Reg Reform NPRM OMB Redline","date":"2020-12-23"},{"doc_id":5486,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Gas Pipeline Regulatory Reform","date":"2021-01-11"},{"doc_id":5528,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Rule RIA","date":"2021-01-14"},{"doc_id":179716,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Rule OMB Comparison Document","date":"2021-01-14"},{"doc_id":179726,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final EA","date":"2021-01-14"},{"doc_id":179731,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GD Annual Report Form and Instructions-PHMSA F7100.1-1","date":"2021-01-14"},{"doc_id":179739,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GD Incident Form and Instructions PHMSA F7100.1","date":"2021-01-14"},{"doc_id":179744,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA Data Analysis of 2015 Mechanical Fitting Failures","date":"2021-01-14"},{"doc_id":179693,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"2137-AF36 Final Rule OMB Comparison Document","date":"2021-01-15"},{"doc_id":179486,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Petition for Reconsideration and Request","date":"2021-02-12"},{"doc_id":5609,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Gas Pipeline Regulatory Reform","date":"2021-03-05"},{"doc_id":5610,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Gas Pipeline Regulatory Reform; Correction","date":"2021-03-05"},{"doc_id":220005,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"2-11-21- Meeting with PST","date":"2021-03-13"},{"doc_id":179278,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Response to Petition for Reconsideration from Pipeline Safety Trust","date":"2021-05-21"},{"doc_id":224020,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pipeline Safety Trust:  Response to Petition for Reconsideration","date":"2021-06-07"}],"references":[{"citation_id":2707254,"raw_reference":"Como, Acting Director, Office of Ratepayer Advocates, California Public Utilities Commission (Jan. 23, 2015) Burden Imposed: $2.67 to $3.67 Billion for Pre-1971 Grandfathered Gas Transmission Lines Less Burden Alternatives: Withdraw or Modify PHMSA Actions to Acknowledge that Design Requirements Do Not Apply Retroactively Entities Affected: Gas Pipeline Operators National Technology Transfer and Advancement Act of 1995, Pub. L. 104-113; See also, Revised OMB Circular A-119. 49 C.F.R. §§ 192.7, 195.3.","cited_authors":"Como, Acting Director, Office of Ratepayer Advocates, California Public Utilities Commission (Jan. 23","cited_year":"2015","cited_title":"Burden Imposed: $2.67 to $3.67 Billion for Pre-1971 Grandfathered Gas Transmission Lines Less Burden Alternatives: Withdraw or Modify PHMSA Actions to Acknowledge that Design Requirements Do Not Apply Retroactively Entities Affected: Gas Pipeline Operators National Technology Transfer and Advancement Act of 1995, Pub","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707255,"raw_reference":"GPA Midstream Association PHMSA has taken the position in recent years that the design requirements in 49 C.F.R. Part 192 can be applied retroactively to existing pipeline facilities. In a series of advisory bulletins, letters of interpretation, and rulemaking documents issued after the September 2010 gas transmission line incident in San Bruno, California, PHMSA has said that operators must have “traceable, verifiable and complete” design records to substantiate the MAOP of a gas pipeline, and that operators must comply with the tensile strength testing requirements in section 192.107(b) and section II-D of appendix B if these records are lacking.44 Despite these recent statements, PHMSA does not have the authority to require operators to use “traceable, verifiable and complete” design records to substantiate the MAOP of a gas pipeline. There are no MAOP-related recordkeeping requirements in Part 192, and the “traceable, verifiable and complete” standard is based on a National Transportation Safety Board (NTSB) recommendation that is not codified in any statute or regulation.45 Nor does PHMSA have the authority to require operators of existing pipelines to comply with the tensile strength testing requirements in Part 192. The tensile strength testing requirements are design and initial testing standards, and the Pipeline Safety Laws prohibit PHMSA from retroactively applying such standards to existing pipelines.46","cited_authors":null,"cited_year":null,"cited_title":"traceable, verifiable and complete","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707256,"raw_reference":"Moreover, even if the Pipeline Safety Laws did not have a non-retroactivity provision, the Part 192 tensile strength testing requirements were never intended to apply—and cannot be practicably applied—to in-service gas pipeline facilities.47 An operator can only perform tensile 76 Fed. Reg. 1,504 (Jan. 10, 2011); 77 Fed. Reg. 26,822 (May 7, 2012); Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines, Notice of Proposed Rulemaking, 81 Fed. Reg. 20,721, 20,814 (Apr. 8, 2016); Letter from Jeffrey D. Wiese, Associate Administrator for Pipeline Safety, PHMSA, to Mr. Joseph P. Como, Acting","cited_authors":"Moreover, even if the Pipeline Safety Laws did not have a non-retroactivity provision, the Part 192 tensile strength testing requirements were never intended to apply—and cannot be practicably applied—to in-service gas pipeline facilities.47 An operator can only perform tensile 76 Fed. Reg. 1,504 (Jan. 10","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707257,"raw_reference":"Director, Office of Ratepayer Advocates, California Public Utilities Commission (Jan. 23, 2015). MAOP is the highest pressure that a gas pipeline can experience during normal operation under PHMSA’s regulations. 49 C.F.R. § 192.619. The design pressure of the pipeline is generally one of the factors that must be considered in establishing","cited_authors":"Director, Office of Ratepayer Advocates, California Public Utilities Commission (Jan. 23","cited_year":"2015","cited_title":"MAOP is the highest pressure that a gas pipeline can experience during normal operation under PHMSA’s regulations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707258,"raw_reference":"NTSB Safety Recommendations P-10-2, P-10-4, P-10-1 (Jan. 3, 2011). The non-retroactivity provision states that PHMSA cannot apply “[a] design, installation, construction, initial inspection, or initial testing standard . . . to a pipeline facility existing when the standard is adopted.” 49 U.S.C. § 60104(b). This prohibition precludes PHMSA from applying the design pressure formula in § 192.105 to pipelines installed prior to the issuance of the federal gas pipeline safety regulations in 1970, including for purposes of establishing MAOP. PHMSA has recognized that principle in interpreting the comparable maximum operating pressure requirements for hazardous liquid pipelines in 49 C.F.R. Part 195. In the Matter of Belle Fourche Pipeline","cited_authors":"NTSB Safety Recommendations P-10-2, P-10-4, P-10-1 (Jan. 3","cited_year":"2011","cited_title":"[a] design, installation, construction, initial inspection, or initial testing standard . . . to a pipeline facility existing when the standard is adopted","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707259,"raw_reference":"Company, Decision on Reconsideration, CPF No. 5-2004-5010 (2009 WL 7810536) (Jul. 15, 2009)(finding that the design pressure limitations in the maximum operating pressure requirements in 49 C.F.R. Part 195 do not apply to any hazardous liquid pipelines in existence prior to the effective of those regulations unless those facilities are replaced, relocated, or otherwise changed); Operating Pressure for Platform Piping; Interpretation, Department of","cited_authors":"Company, Decision on Reconsideration, CPF No. 5-2004-5010 (2009 WL 7810536) (Jul. 15","cited_year":"2009","cited_title":"(finding that the design pressure limitations in the maximum operating pressure requirements in 49 C.F.R. Part 195 do not apply to any hazardous liquid pipelines in existence prior to the effective of those regulations unless those facilities are replaced, relocated, or otherwise changed); Operating Pressure for Platform Piping; Interpretation, Department of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707260,"raw_reference":"Transportation, Materials Transportation Bureau, Docket No. OPSO-35 (Oct. 15, 1976). The tensile strength testing requirements referenced in § 192.107(b) and codified in section II-D of appendix B are based on Section 811 of the the 1968 edition of the USA Standard Code for Pressure Piping, Gas Transmission and Distribution Piping Systems, USAS B31.8-1968, the consensus industry standard that DOT relied upon in developing the original federal gas pipeline safety regulations. 35 Fed. Reg. 13,247 (Aug. 19, 1970).","cited_authors":"Transportation, Materials Transportation Bureau, Docket No. OPSO-35 (Oct. 15","cited_year":"1976","cited_title":"The tensile strength testing requirements referenced in § 192.107(b) and codified in section II-D of appendix B are based on Section 811 of the the 1968 edition of the USA Standard Code for Pressure Piping, Gas Transmission and Distribution Piping Systems, USAS B31.8-1968, the consensus industry standard that DOT relied upon in developing the original federal gas pipeline safety regulations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707261,"raw_reference":"GPA Midstream Association strength testing at the design phase of a project, i.e., when the pipe is separated into individual lengths, located aboveground, and easily accessible for physical examination, inspection, and destructive testing. By taking the position that tensile strength testing must be performed on inservice pipeline facilities, PHMSA is requiring operators to excavate, redesign, and reinstall these facilities as part of an information collection enterprise. Indeed, PHMSA acknowledged that its position was akin to requiring replacement of these pipelines in the April 2016 NPRM for gas gathering and transmission lines.48 The potential costs to the pipeline industry from implementing PHMSA’s new policy are enormous. In the April 2016 NPRM, PHMSA estimated that the cost of requiring operators of pre-1970 gas transmission line operators to conduct tensile strength testing would be approximately $2.67 billion to $3.67 billion over a 15-year period. While staggering, GPA Midstream wishes to note that PHMSA’s estimate only reflects the cost of applying the policy to a limited subset of gas transmission line operators who lack “traceable, verifiable and complete” design records. The costs imposed on gas distribution and gathering line operators, who","cited_authors":null,"cited_year":null,"cited_title":"traceable, verifiable and complete","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707262,"raw_reference":"PHMSA has attempted to convert § 192.603(b) into a general duty clause to maintain records. In 1970, when the Agency first codified this provision, it relied on the USA Standard Code for Pressure Piping, Gas Transmission and Distribution Piping Systems (B31.8 or the Standard) in drafting § 192.603(b).52 In fact § 192.603(b) was the mirror image of section 850.2 of the Standard. Neither the preamble to the first pipeline safety regulations or the Standard noted that § 192.603(b) was intended as a default, overarching recordkeeping requirement. In the years that followed, DOT consistently advised the industry that the records required were limited to those needed to implement the operations and maintenance manual. For instance, in 1972, the Agency stated that “If an operator requires maps as a record to properly administer the operating and maintenance plan to meet the Federal safety requirements, then these maps must be maintained by the operators.”53 This interpretation suggests that an operator has the flexibility to determine which records are necessary to administer its own procedures. In 1989, as part of its submission to the Office of Management and Budget (OMB) for approval of a revised information collection, the Agency limited the type of records required under § 192.603(b) as maps, construction records, and operating history.54","cited_authors":"PHMSA has attempted to convert § 192.603(b) into a general duty clause to maintain records. In","cited_year":"1970","cited_title":"If an operator requires maps as a record to properly administer the operating and maintenance plan to meet the Federal safety requirements, then these maps must be maintained by the operators","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707263,"raw_reference":"However, in approximately 2005,55 through guidance and without notice and comment,","cited_authors":"However, in approximately","cited_year":"2005","cited_title":"55 through guidance and without notice and comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707264,"raw_reference":"PHMSA expanded the scope of § 192.603(b) by stating that “[w]hen a regulation does not specifically require records, then paragraph § 192.603(b) can be used when appropriate records have not been kept.”56 This interpretation expands the scope of § 192.603(b) beyond those needed to implement the operations and maintenance manual. There is no support in the text of 49 C.F.R. § 192.603(b). 49 C.F.R. § 192.605(a). 49 C.F.R. § 192.603(b). Interim Minimum Federal Standards for the Transportation of Natural and Other Gas by Pipeline, 33 Fed. Reg. 16,500 (November 13, 1968); Establishment of Minimum Standards, 35 Fed. Reg. 13,248, 13, 272 (August 19, 1970). See also, section 850.2 of ASME B31.8 (1968).","cited_authors":"PHMSA expanded the scope of § 192.603(b) by stating that “[w]hen a regulation does not specifically require records, then paragraph § 192.603(b) can be used when appropriate records have not been kept.”56 This interpretation expands the scope of § 192.603(b) beyond those needed to implement the operations and maintenance manual. There is no support in the text of 49 C.F.R. § 192.603(b). 49 C.F.R. § 192.605(a). 49 C.F.R. § 192.603(b). Interim Minimum Federal Standards for the Transportation of Natural and Other Gas by Pipeline, 33 Fed. Reg. 16,500 (November 13","cited_year":"1968","cited_title":"; Establishment of Minimum Standards, 35 Fed","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707265,"raw_reference":"PI-72-031 (July 17, 1972). https://www.regulations.gov/document?D=PHMSA-2015-0063-0003 at 20. The 2005 Enforcement Guidance was released publicly in 2010.","cited_authors":"PI-72-031 (July 17","cited_year":"1972","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=PHMSA-2015-0063-0003","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707266,"raw_reference":"PHMSA Code Compliance Guidelines (2005), at 35.","cited_authors":"PHMSA Code Compliance Guidelines","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707267,"raw_reference":"GPA Midstream Association § 192.603(b) or the regulatory history for this position. In 2016, the Agency proposed a new general duty recordkeeping requirement as part of the Gas Transmission NPRM.57 The Agency proposed that “[e]ach operator must make and retain records that demonstrate compliance with this part.”58 Although the need for this proposal will be evaluated through the rulemaking process, it calls into question the Agency’s prior interpretation of § 192.603(b). If the Agency already had broad recordkeeping authority in § 192.603(b) as stated in the Guidance, then there would be no need for this latest proposal. It is also questionable whether PHMSA obtained the proper information collection approvals from OMB to apply § 192.603(b) so broadly. According to the available records on","cited_authors":"GPA Midstream Association § 192.603(b) or the regulatory history for this position. In","cited_year":"2016","cited_title":"[e]ach operator must make and retain records that demonstrate compliance with this part","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707268,"raw_reference":"OMB’s website, PHMSA has sought renewal of its information collection authority for gas transmission pipeline records on a regular basis dating back to at least 1984.59 At no time, did","cited_authors":"OMB’s website, PHMSA has sought renewal of its information collection authority for gas transmission pipeline records on a regular basis dating back to at least","cited_year":"1984","cited_title":"59 At no time, did","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707269,"raw_reference":"PHMSA characterize § 192.603(b) as a broad, default recordkeeping requirement. In fact, in the 2008, 2012, and 2015 submissions to OMB, PHMSA characterized §192.603(b) as a “one-time” collection and attributed ten hours per operator to update the records associated with this regulation.60 Clearly, the Agency did not intend to apply § 192.603(b) as a default recordkeeping requirement if the assumed paperwork burden was ten hours per operator.","cited_authors":"PHMSA characterize § 192.603(b) as a broad, default recordkeeping requirement. In fact, in the","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707270,"raw_reference":"Finally, starting in 2015, PHMSA began characterizing § 192.603(b) as a lifetime recordkeeping requirement.61 This interpretation is contrary to the text, structure, and history of this regulation and does not align with the Agency’s historical filings to OMB. In 2015, the Agency issued an interpretation in which it stated that “[s]ections 192.517 and 192.603 require that all records regarding the pipeline MAOP determination be kept for the life of the pipeline segment, including records of pipe properties, pipeline component properties, pressure test records, class location studies, current class location designation, and operating history.”62","cited_authors":"Finally, starting in","cited_year":"2015","cited_title":"[s]ections 192.517 and 192.603 require that all records regarding the pipeline MAOP determination be kept for the life of the pipeline segment, including records of pipe properties, pipeline component properties, pressure test records, class location studies, current class location designation, and operating history","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707271,"raw_reference":"OMB Control No. 2137-0049. See Records dated between 1981-2016 available on www.reginfo.gov. Supporting Statement for OMB 2137-0049 dated September 30, 2008 (https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=200809-2137-003); Supporting Statement for OMB Control No. 2137-0049 dated January 31, 2012 (https://www.reginfo.gov/public/do/PRAViewDocument?ref_nbr=201110-2137-003); Supporting Statement for","cited_authors":null,"cited_year":null,"cited_title":"OMB Control No","cited_venue":null,"cited_doi":null,"cited_url":"www.reginfo.gov","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707272,"raw_reference":"PHMSA’s general authority to require natural gas pipeline owners and operators to maintain records, make reports, and provide information to the Secretary. GPA Midstream has reviewed the supporting statements submitted to OMB dating back to 2008. In these submissions,","cited_authors":"PHMSA’s general authority to require natural gas pipeline owners and operators to maintain records, make reports, and provide information to the Secretary. GPA Midstream has reviewed the supporting statements submitted to OMB dating back to","cited_year":"2008","cited_title":"In these submissions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707273,"raw_reference":"PHMSA’s 2015 interpretation characterizing § 192.603(b) as a lifetime retention requirement should be rescinded as it has no basis in the regulation and does not align with the approvals obtained by OMB. DOT should also revise its PHMSA Operations and Maintenance Enforcement Guidance to ensure that its interpretation of § 192.603(b) is based on a sound reading of the regulations and consistent with its applications for information collection approval.","cited_authors":null,"cited_year":null,"cited_title":"PHMSA’s 2015 interpretation characterizing § 192.603(b) as a lifetime retention requirement should be rescinded as it has no basis in the regulation and does not align with the approvals obtained by OMB. DOT should also revise its PHMSA Operations and Maintenance Enforcement Guidance to ensure that its interpretation of § 192.603(b) is based on a sound reading of the regulations and consistent with its applications for information collection approval","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707274,"raw_reference":"GPA Midstream Association Attachment 1: Gas Processors Association January 20, 2012 Comment Letter Advance Notice of Proposed Rulemaking, Docket No. PHMSA-2011-0023 Attachment 2:","cited_authors":null,"cited_year":null,"cited_title":"GPA Midstream Association Attachment 1: Gas Processors Association January 20, 2012 Comment Letter Advance Notice of Proposed Rulemaking, Docket No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707275,"raw_reference":"GPA Midstream Association July 7, 2016 Comment Letter Notice of Proposed Rulemaking, Docket No. PHMSA-2011-0023","cited_authors":null,"cited_year":null,"cited_title":"GPA Midstream Association July 7, 2016 Comment Letter Notice of Proposed Rulemaking, Docket No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707276,"raw_reference":"VIA ELECTRONIC FILING July 7, 2016 U.S. DOT Docket Management System West Building Ground Floor Room W12-140 1200 New Jersey Avenue, SE,","cited_authors":null,"cited_year":null,"cited_title":"VIA ELECTRONIC FILING July 7, 2016 U.S. DOT Docket Management System West Building Ground Floor Room W12-140 1200 New Jersey Avenue, SE","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707277,"raw_reference":"Washington, DC 20590-0001 DC 20590–0001 Docket No. PHMSA 2011 – 0023: Proposed Rule on Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines; Federal Register Vol. 81, No. 68 (Friday, April 8, 2016); RIN 2137-AE72 The GPA Midstream Association (“GPA Midstream” or the “Association”) appreciates the opportunity to provide comments in response to the Pipeline and Hazardous Materials Safety Administration’s (“PHMSA”) Notice of Proposed Rulemaking (“NPRM” or “Notice”) on the Safety of Gas Transmission and Gathering Pipelines.1 GPA Midstream members own and operate hundreds of thousands of miles of gathering lines which represent over 90 percent of all gathering lines in the US.”","cited_authors":"Washington, DC 20590-0001 DC 20590–0001 Docket No. PHMSA 2011 – 0023: Proposed Rule on Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines; Federal Register Vol. 81, No. 68 (Friday, April 8","cited_year":"2016","cited_title":"GPA Midstream","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707278,"raw_reference":"GPA Midstream has served the U.S. energy industry since 1921 as an incorporated nonprofit trade association. GPA Midstream is composed of over 100 corporate members that are engaged in the gathering and processing of natural gas into merchantable pipeline gas, commonly referred to in the industry as “midstream activities.” Such processing includes the removal of impurities from the raw gas stream produced at the wellhead, as well as the extraction for sale of natural gas liquid products (NGLs) such as ethane, propane, butane and natural gasoline. GPA Midstream members account for more than 90 percent of the NGLs produced in the United States from natural gas processing. On August 25, 2011, PHMSA published an Advance Notice of Proposed Rulemaking titled “Pipeline Safety: Safety of Gas Transmission Pipelines”.2 GPA Midstream filed comments on January 20, 2012, and limited the focus of its comments at that time to Section “O” related to onshore gas gathering. In addition, many of its member companies are also members of Texas Pipeline Safety: “Safety of Gas Transmission and Gathering Pipelines,” Notice of Proposed Rulemaking, 81 FR, 20722 (April 8, 2016) 76 FR 53086 - 53102","cited_authors":"GPA Midstream has served the U.S. energy industry since 1921 as an incorporated nonprofit trade association. GPA Midstream is composed of over 100 corporate members that are engaged in the gathering and processing of natural gas into merchantable pipeline gas, commonly referred to in the industry as “midstream activities.” Such processing includes the removal of impurities from the raw gas stream produced at the wellhead, as well as the extraction for sale of natural gas liquid products (NGLs) such as ethane, propane, butane and natural gasoline. GPA Midstream members account for more than 90 percent of the NGLs produced in the United States from natural gas processing. On August 25","cited_year":"2011","cited_title":"Pipeline Safety: Safety of Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707279,"raw_reference":"PHMSA published the NPRM on April 8, 2016, proposing substantial revisions to the Pipeline Safety Regulations applicable to the safety of onshore gas transmission and gathering pipelines. Most notably for GPA members, the NPRM proposes to expand the regulation of onshore gas gathering lines to impose new reporting requirements on rural gathering pipelines, and to extend the definition of regulated gathering to encompass Type A gathering lines in Class 1 locations with a diameter of 8 inches or greater, and a maximum allowable operating pressure (“MAOP”) equal to or greater than 20% of specified minimum yield strength (“SMYS”).","cited_authors":"PHMSA published the NPRM on April 8","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707280,"raw_reference":"GPA Midstream Association concerned that PHMSA’s current proposals are not consistent with the statutory framework, including the provisions of the 2011 Pipeline Safety, Regulatory Certainty and Job Creation Act of 2011 (the 2011 Act).4 GPA Midstream members are willing to commit resources to implement lawful and appropriate changes in gathering regulations, but our members are not in a position to do so where the changes in regulation are not based on risk, and would not provide a meaningful safety benefit. The statutory scheme sets out an orderly process for PHMSA’s consideration of whether and how to subject additional gathering lines to federal regulation. First, PHMSA must collect appropriate data about those pipelines to determine the risks they may pose. Second, after collecting data, PHMSA must consider specific physical and operational characteristics in making a determination of whether and what extent to regulate additional gathering lines. Third,","cited_authors":null,"cited_year":null,"cited_title":"GPA Midstream Association concerned that PHMSA’s current proposals are not consistent with the statutory framework, including the provisions of the 2011 Pipeline Safety, Regulatory Certainty and Job Creation Act of 2011 (the 2011 Act).4 GPA Midstream members are willing to commit resources to implement lawful and appropriate changes in gathering regulations, but our members are not in a position to do so where the changes in regulation are not based on risk, and would not provide a meaningful safety benefit","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707281,"raw_reference":"PHMSA must comply with a series of rulemaking requirements designed to ensure that its regulations are practicable. Finally, the 2011 Act required PHMSA to study gathering line regulations nationwide, and then issue a report of its findings and recommendations, in light of specific factors, to Congress. 1. Changes Based on Risk Data In the early 1990’s Congress amended the pipeline safety laws to require PHMSA to define","cited_authors":null,"cited_year":null,"cited_title":"PHMSA must comply with a series of rulemaking requirements designed to ensure that its regulations are practicable","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707282,"raw_reference":"Integrity ():V001T03A055. doi:10.1115/IPC2016-64105.","cited_authors":null,"cited_year":null,"cited_title":"Integrity ():V001T03A055","cited_venue":null,"cited_doi":"10.1115/ipc2016-64105","cited_url":null,"ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707283,"raw_reference":"B ():647-658. doi:10.1115/IPC2002-27122.","cited_authors":null,"cited_year":null,"cited_title":"B ():647-658","cited_venue":null,"cited_doi":"10.1115/ipc2002-27122","cited_url":null,"ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2707284,"raw_reference":"https://doi.org/10.17226/24907.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.17226/24907","cited_url":"https://doi.org/10.17226/24907","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}