{"document":{"doc_id":217493,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Ltr/EP A/F. Marcinowski to DOE/I. Triay, transmitting report for inspection no. EPA-CBFO-2.03-22 [A-98-49-II-A1-48]","date":"2021-11-18","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2004-0052-0074","source_native_id":"EPA-HQ-OAR-2004-0052-0074","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2004-0052"],"rins":["RIN 2060-AJ90","RIN 2060-AG85"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":20276,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions From Spark-Ignition Marine Vessels and Highway Motorcycles","date":"2002-08-14"},{"doc_id":20222,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions from Spark-Ignition Marine Vessels and Highway Motorcycles; Correction","date":"2002-09-09"},{"doc_id":20110,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Control of Emissions From Spark Ignition Marine Vessels and Highway Motorcycles; Extension of Comment Period","date":"2002-10-30"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":19197,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Control of Emissions From Highway Motorcycles","date":"2004-01-15"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"},{"doc_id":269972,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)","date":"2006-07-25"},{"doc_id":269973,"source":"docket_item","org":"EPA","doc_type":"report","title":"Analysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)","date":"2006-07-25"},{"doc_id":269974,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report","date":"2006-07-25"},{"doc_id":269975,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Peer Review Plan","date":"2006-07-25"}],"references":[{"citation_id":2633011,"raw_reference":"1. ASME NQA-1-1989 edition; 2. ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and •3. ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). In December 1996, the U.S. Environmental Protection Agency (EPA or Agency) conducted an audit that determined that DOE had properly executed a QA Program. During the 1996 audit,","cited_authors":"1. ASME NQA-1-1989 edition; 2. ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and •3. ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). In December","cited_year":"1996","cited_title":"the U.S. Environmental Protection Agency (EPA or Agency) conducted an audit that determined that DOE had properly executed a QA Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633012,"raw_reference":"EPA verified that DOE established the applicable requirements of the NQA standards in its Quality Assurance Program Document (QAPD). The QAPD is the QA Plan for the Waste Isolation Pilot Plant (WIPP) that establishes the applicable requirements of the NQA standards. The implementation of the QAPD is enforced by the QA Organization of DOE's Carlsbad Field Office (CBFO), which audits all other organizations associated with waste disposal at the WIPP to ensure that they implement the applicable NQA requirements. Subsequent to the 1996 audit, the EPA conducted annual audits to verify proper maintenance of","cited_authors":null,"cited_year":null,"cited_title":"EPA verified that DOE established the applicable requirements of the NQA standards in its Quality Assurance Program Document (QAPD)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633013,"raw_reference":"CBFO's QA Program. This report documents the results of the EPA audit conducted on February 19-20, 2003. Table 1 provides a list of the EPA audits of CBFO's QA Program. Table 1 - List of EPA's Audits of the Carlsbad Field Office's QA Program Activity Certification Audit Audit Audit Date Purpose December 9-13,1996 Initial audit of QA program for conformance with 40","cited_authors":"CBFO's QA Program. This report documents the results of the EPA audit conducted on February 19-20","cited_year":"2003","cited_title":"Table 1 provides a list of the EPA audits of CBFO's QA Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633014,"raw_reference":"ELEMENT: TITLE: Corrective Action Does the reference document adequately define, describe, address, or satisfy the following: Applicable Procedure & Para. -MP 3.1, Corrective Action Reporting, Sections 5.1 through 5.8 Basic Requirements Are conditions adverse to quality identified promptly and corrected as soon as practical? Finding F-2003-03- Procedure MP 3.1 indicates","cited_authors":null,"cited_year":null,"cited_title":"ELEMENT: TITLE: Corrective Action Does the reference document adequately define, describe, address, or satisfy the following: Applicable Procedure & Para","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633015,"raw_reference":"DOE Carlsbad Field Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6, 1999.","cited_authors":"DOE Carlsbad Field Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633016,"raw_reference":"DOE Carlsbad field Office. Management Assessment Plan Carlsbad Field Office Plan for the Fiscal Year 2003 Management Assessment of the QA Program. December 16, 2002","cited_authors":null,"cited_year":null,"cited_title":"DOE Carlsbad field Office","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633017,"raw_reference":"DOE Carlsbad Field Office. Team Procedure 10.1, Rev.2, Qualification of Audit Personnel and Certification of Lead Auditors, October 26, 2000.","cited_authors":"DOE Carlsbad Field Office. Team Procedure 10.1, Rev.2, Qualification of Audit Personnel and Certification of Lead Auditors, October 26","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633018,"raw_reference":"DOE Carlsbad Field Office. Corrective Action Report Log, Fiscal Year 2002","cited_authors":null,"cited_year":null,"cited_title":"DOE Carlsbad Field Office","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633019,"raw_reference":"DOE Carlsbad Field Office, \"Semi-Annual Deficiency Trend Report,\" February 6, 2002","cited_authors":null,"cited_year":null,"cited_title":"Semi-Annual Deficiency Trend Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633020,"raw_reference":"DOE Carlsbad Field Office, \"Semi-Annual Deficiency Trend Report,\" October 16, 2002","cited_authors":null,"cited_year":null,"cited_title":"Semi-Annual Deficiency Trend Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633021,"raw_reference":"DOE Carlsbad Field Office. \"Technical Qualification Program Guide,\" DOE/CBFO 02-3219, Revision 0. December 2002","cited_authors":null,"cited_year":null,"cited_title":"Technical Qualification Program Guide","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633022,"raw_reference":"Energy, Washington, D.C, May 1997. Memo: Laura Doty, Portage Environmental Inc., to Amy Arceo, CTAC, Dated April 2, 2002,","cited_authors":"Energy, Washington, D.C, May","cited_year":"1997","cited_title":"Memo: Laura Doty, Portage Environmental Inc., to Amy Arceo, CTAC, Dated April 2, 2002","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633023,"raw_reference":"Calvert, CTAC) dated February 18, 2003, RE: Background Investigation of Pete Rodriguez.","cited_authors":"Calvert, CTAC) dated February 18","cited_year":"2003","cited_title":"RE: Background Investigation of Pete Rodriguez","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}