{"document":{"doc_id":217471,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Ltr/EPA/F. Marcinowski to DOE/I. Triay transmitting inspection reports: SLN's QA Program and LANL's QA program [A-98-49-II-A1-13]","date":"2021-11-18","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2004-0052-0040","source_native_id":"EPA-HQ-OAR-2004-0052-0040","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2004-0052"],"rins":["RIN 2060-AJ90","RIN 2060-AG85"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":20276,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions From Spark-Ignition Marine Vessels and Highway Motorcycles","date":"2002-08-14"},{"doc_id":20222,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions from Spark-Ignition Marine Vessels and Highway Motorcycles; Correction","date":"2002-09-09"},{"doc_id":20110,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Control of Emissions From Spark Ignition Marine Vessels and Highway Motorcycles; Extension of Comment Period","date":"2002-10-30"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":19197,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Control of Emissions From Highway Motorcycles","date":"2004-01-15"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"},{"doc_id":269972,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)","date":"2006-07-25"},{"doc_id":269973,"source":"docket_item","org":"EPA","doc_type":"report","title":"Analysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)","date":"2006-07-25"},{"doc_id":269974,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report","date":"2006-07-25"},{"doc_id":269975,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Peer Review Plan","date":"2006-07-25"}],"references":[{"citation_id":2632808,"raw_reference":"PURPOSE At § 194.22(a)(1), the Agency requires the DOE to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA2a-1990 addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The EPA verified that the DOE established these requirements in its Compliance Certification Application (CCA) to the EPA for the WIPP. The QAPD is the documented quality assurance program plan for the WIPP project, as a whole, to comply with the NQA requirements. The QAPD is implemented by the DOE's Carlsbad Area Office (CAO), which has the authority to audit all other organizations associated with waste disposal at the WIPP to ensure that their lower-tier quality assurance programs establish and implement the applicable requirements ofthe QAPD. Each DOE generator site (including","cited_authors":null,"cited_year":null,"cited_title":"PURPOSE At § 194.22(a)(1), the Agency requires the DOE to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA2a-1990 addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632809,"raw_reference":"EPA's ORIA conducted initial audits ofthe LANL quality assurance program on May 12, August 18-22 and September 10-11, 1997. Subsequently, the Agency conducted a maintenance inspection, on September 21-25,1998, of DOE Audit A-98-30 ofthe LANL quality assurance program for transuranic waste characterization activities. The purpose ofthe inspection was to verify whether LANL had maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection also served to verify the DOE audit was performed in compliance with NQA-1, Element 18, entitled \"Audits\". The EPA conducted its current maintenance inspection on November 9-10, 1999 of DOE Audit A-00-03 ofthe LANL quality assurance program for waste characterization activities. The","cited_authors":"EPA's ORIA conducted initial audits ofthe LANL quality assurance program on May 12, August 18-22 and September 10-11","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632810,"raw_reference":"SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-03, which was performed on November 9-10, 1999. The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors, audit checklists and all applicable","cited_authors":"SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-03, which was performed on November 9-10","cited_year":"1999","cited_title":"The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors, audit checklists and all applicable","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632811,"raw_reference":"DOE Los Alamos National Laboratory. TWCP Organization Chart, TWCP Interface Organization Charts, November 1, 1999.","cited_authors":"DOE Los Alamos National Laboratory. TWCP Organization Chart, TWCP Interface Organization Charts, November 1","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632812,"raw_reference":"DOE Los Alamos National Laboratory. Developing Procedures, TRU Waste Characterization Program Quality Procedure TWCP-QP-1.1-001, R.4, September 15, 1998.","cited_authors":"DOE Los Alamos National Laboratory. Developing Procedures, TRU Waste Characterization Program Quality Procedure TWCP-QP-1.1-001, R.4, September 15","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632813,"raw_reference":"The U.S. Environmental Protection Agency (EPA) conducted an inspection, on November 8-11, 1999, ofthe U.S. Department of Energy (DOE) Audit A-00-01 ofthe quality assurance program for the Sandia National Laboratory (SNL) Nuclear Waste Management Program (NWMP). SNL is located in both Albuquerque and Carlsbad, New Mexico and serves in a contractor capacity to the DOE Carlsbad Area Office (CAO), which is responsible for the management ofthe Waste Isolation Pilot Plant (WIPP). SNL has conducted numerous research programs in support ofthe","cited_authors":"The U.S. Environmental Protection Agency (EPA) conducted an inspection, on November 8-11","cited_year":"1999","cited_title":"ofthe U.S. Department of Energy (DOE) Audit A-00-01 ofthe quality assurance program for the Sandia National Laboratory (SNL) Nuclear Waste Management Program (NWMP)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632814,"raw_reference":"WIPP, the geologic repository for the disposal ofthe nation's transuranic wastes. The purpose of the inspection was to confirm the continued compliance of SNL's quality assurance program with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection was conducted under the authority of 40 CFR 194.8(a)(4). The EPA's Office of Radiation and Indoor Air (ORIA) found that SNL's quality assurance program continues to comply with the requirements for quality assurance programs as set forth in 194.22(a), which includes by reference, the requirements of ASME NQA-1-1989 edition; ASME","cited_authors":null,"cited_year":null,"cited_title":"WIPP, the geologic repository for the disposal ofthe nation's transuranic wastes","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632815,"raw_reference":"NQA-2a-1990 addenda, part 2,7 to ASME NQA-2-1989 edition; and ASME NQA-3-1989 edition (excluding Section 2.1 (b) and (c), and Section 17.1). During the inspection, the EPA: 1) verified the proper execution ofthe SNL's quality assurance program; 2) verified the DOE audit was performed in compliance with NQA-1, Element 18, entitled \"Audits;\" and 3) independently verified the implementation of a sample of NQA requirements by the SNL quality assurance program. The DOE audit team concluded that SNL's QA program continues to be satisfactorily implemented. The EPA inspectors: 1) agree with the DOE audit team's general conclusion at the audit close-out meeting, 2) found no instances of nonconformance in DOE's performance ofthe audit, and 3) found no instances of nonconformance in SNL's QA program. This report will be made available to the public through the Agency's public dockets.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632816,"raw_reference":"EPA's ORIA conducted an initial audit ofthe SNL WIPP quality assurance program from January 13-24, 1997. Subsequently, the Agency conducted a maintenance inspection, on September 21-25, 1998, of DOE Audit A-98-19 ofthe SNL quality assurance program for transuranic waste characterization activities. The purpose of this inspection was to verify whether SNL had maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection also served to verify that the DOE audit was performed in compliance with","cited_authors":"EPA's ORIA conducted an initial audit ofthe SNL WIPP quality assurance program from January 13-24","cited_year":"1997","cited_title":"Subsequently, the Agency conducted a maintenance inspection, on September 21-25, 1998, of DOE Audit A-98-19 ofthe SNL quality assurance program for transuranic waste characterization activities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632817,"raw_reference":"NQA-1, Element 18, entitled \"Audits\". The EPA conducted its current maintenance inspection on November 8-11, 1999 of DOE Audit A-00-01 of SNL's NWMP quality assurance program for WIPP activities. The DOE's audit encompassed only the activities associated with the proposed disposal of transuranic wastes at the WIPP. The EPA conducted the following activities: In accordance with § 194.22(e), the EPA inspection team evaluated the SNL quality assurance program plan to verify the establishment of applicable NQA requirements of § 194.22(a)(1). In accordance with § 194.22(e), the EPA inspection team performed the following activities to verify the proper maintenance of SNL's quality assurance program: Inspected the DOE audit ofthe SNL quality assurance program; Witnessed the DOE audit team properly implementing NQA-1, Element 18 requirements for the performance of audits; and, Conducted an independent assessment of selected NQA requirements that P.30 are applicable to WIPP activities.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632818,"raw_reference":"SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-01, which was performed on November 8-11, 1999. The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors and the assessment ofthe DOE audit reports, corrective action reports, audit checklists and all applicable DOE audit working papers. The EPA inspection team assessed the adequacy ofthe CAO's audits in accordance with the requirements of 40 CFR 194.22(a)(1), as discussed above in Section 2.0 ofthis report. The EPA's inspection team selected two NQA-1 elements to independently ensure the implementation of SNL's quality assurance program. The NQA-1 elements chosen by the EPA to inspect are:","cited_authors":"SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-01, which was performed on November 8-11","cited_year":"1999","cited_title":"The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors and the assessment ofthe DOE audit reports, corrective action reports, audit checklists and all applicable DOE audit working papers","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632819,"raw_reference":"DOE Sandia National Laboratory. NP 1 -1, Organization and QA Program, Rev. 2, effective date: June 14, 1999.","cited_authors":"DOE Sandia National Laboratory. NP 1 -1, Organization and QA Program, Rev. 2, effective date: June 14","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632820,"raw_reference":"DOE Sandia National Laboratory. NP 4-1, Procurement, Rev. 2, effective date: October 13, 1999.","cited_authors":"DOE Sandia National Laboratory. NP 4-1, Procurement, Rev. 2, effective date: October 13","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632821,"raw_reference":"DOE Sandia National Laboratory. SNL NWMP Organization Chart (revised during CAO Audit A-00-01), November 11, 1999.","cited_authors":"DOE Sandia National Laboratory. SNL NWMP Organization Chart (revised during CAO Audit A-00-01), November 11","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632822,"raw_reference":"DOE Sandia National Laboratory. Sandia WIPP Management Assessment Report, June 22, 1999.","cited_authors":"DOE Sandia National Laboratory. Sandia WIPP Management Assessment Report, June 22","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632823,"raw_reference":"DOE Sandia National Laboratory. Audit EA9905, Duke Engineering, March 15-17, 1999.","cited_authors":"DOE Sandia National Laboratory. Audit EA9905, Duke Engineering, March 15-17","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632824,"raw_reference":"DOE Sandia National Laboratory. Audit EA9910, Los Alamos National Laboratory, July 7-8, 1999.","cited_authors":"DOE Sandia National Laboratory. Audit EA9910, Los Alamos National Laboratory, July 7-8","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632825,"raw_reference":"Laboratory, August 31-September 2, 1999. DOE Sandia National Laboratory. Audit EA9912, Florida State University, September 14-16, 1999.","cited_authors":"Laboratory, August 31-September 2","cited_year":"1999","cited_title":"DOE Sandia National Laboratory","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}