LATE: DOE Comments Responding to EEG Letter, including: a) Cover Lt/DOE/George Dials (Manager, CAO) b) Responses to Issues Raised in 3/14/97 EEG Letter [A-93-02-II-H-45]
Other documents for the same rulemaking
References: 59 extracted, 0 linked to papers
Helton, J. 1996. Preliminary Summary of Uncertainty and Sensitivity Analysis Results Obtained in Support of the 1996 Compliance Certification Application for the Waste Isolation Pilot Plant, Memo, Sandia National Laboratories, December 23, 1996.
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.19
EEG Comment 4 EEG Review of the CCA March 14, 1997 letter Text of Comment Brine Inflow from Salado: 2-D Versus 3-D Geometry in BRAGFLO The 2-D geometry used in the BRAGFLO appears to have caused an under-prediction of brine inflow to the repository and thus may have resulted in a significant underprediction of the direct brine release. This assumption may also have effected the amount of releases predicted by the spallings scenario. The justification for modeling the repository in a pseudo 3-D manner (2-D radial flaring) rather than in a full 3-D geometry has been provided through evaluation of
Helton, Jon, Preliminary Summary of Uncertainty and Sensitivity Analysis Results Obtained in Support of the 1996 Compliance Certification Application for the Waste Isolation Pilot Plant, Memo, Sandia National Laboratories, December, 1996.
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.21 Figure 5.1.5 suggests a significant impact from a 0.23 saturation shift at high pressures. The simulations without anhydrite fracturing show a decrease of IxlO6 to 2xl06 kg (800 to 1,600 m3) in predicted brine inflow in the 2-D simulations compared to the 3D simulations (Figure 4; Figure 10 of the FEP S-1 memo). These flows are doubled for the full repository. The differences are most likely from differences in marker beds flows to the repository. To put these brine inflow differences in perspective, note that average brine inflow to the repository in the CCA calculations of the similar S5 scenario was almost 40,000 m3, with an average 8,000 m3 from the marker beds2. Marker bed brine flows in the S5 scenario are dominated by flows under low pressure conditions. The marker bed flows are a more significant concern in the Sl undisturbed scenario. An average of roughly 3.000 m3 flowed into the repository from the marker beds in the Sl CCA calculations. To approximate the brine flow enor in the undisturbed calculations for pressures below the anhydrite fracture threshold, we ratio the FEP S-1 differences by
WIPP PA (Performance Assessment). 1992-1993. Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992. SAND92-0700. Sandia National Laboratories, Albuquerque, NM. Vols. 1-5 (CCA Reference # 563).
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.34
EEG Comment 7 EEG Review of the CCA March 14, 1997 letter Text of Comment
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.35 been reviewed by a peer panel. The peer reviews were organized, conducted, and documented per the applicable criteria in 40 CFR 194. The uncertainties characterized in the natural system and the interaction of waste with the disposal system environment have little effect on the location of the mean CCDF. As stated in Chapter 6, Section 6.0.2.5: "As discussed in Section 6.5, examination of the normalized releases resulting from cuttings and cavings, spallings, and direct brine release provides insight into the relative importance of each release mode in terms of its contribution to the location of the mean CCDF and the compliance determination. Releases from cuttings and cavings dominate the mean CCDF. Spallings make a small contribution. Direct brine releases are less important and have very littie effect on the location of the mean. Subsurface releases resulting from groundwater transport are less than IO"6 EPA units and make no contribution to the location of the mean CCDF." The DOE understood that there were differences between the conceptual models for direct brine release and cuttings, cavings, and spallings. This understanding was documented in Section 6.4.7.1.1 of the CCA and states: "In the conceptual model for direct brine release, several other assumptions
1. Hora, S.C, von Winderfeldt, D., and Trauth, K.M., 1991. Expert Judgment on Inadvertent Human Intrusion into the Waste Isolation Pilot Plant. SAND90-3063. Sandia National Laboratories.
2. Glickman, T., Singer, M., Rosenberg, N., Vinovskis, M., 1991. The Report of the Washington Area Second Team on Future Inadvertent Human Intrusion into the WIPP Repository. Appendix F to SAND90-3063. Sandia National Laboratories.
3. Hora, S.C, 1992. Probabilities of Human Intrusion into the WIPP Methodology for the 1992 Preliminary Comparison, August 25, 1992. Appendix to SAND920700, pp. A-69 to A-99.
4. Gordon, T.J., Baram, M., Bell, W., Cohen, B., 1990. Inadvertent Intrusion into
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.58 submitted in response to a request for additional information by the EPA (Letter of December 19, 1996; Enclosure 1, Page 18). With respect to the period of time that AICs are proposed to remain active, the DOE is committed to implementing the control programs for as long as such controls are useful and practical. However, in compliance with 40 CFR § 194.41(b), credit for active institutional controls is not considered in the performance assessment beyond 100 years from closure of the repository. The primary goal of the DOE's AIC program is to prevent unauthorized use of the
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.59 The EEG cites five examples where a member (M. Baram) of the Boston Team, another one of the four "futures" elicitation teams convened in 1990 by the DOE, considered "active control" to have been lost within 50 years. However, none of these examples represents a situation where an AIC program similar to that proposed for the WIPP was initiated at the outset of a project in order to maintain control. In fact, as stated by Baram (Hora et al., 1991, p. C-74), the five examples relate to failure to record information or to loss of information. Therefore, these examples are not relevant to the objectives of the WIPP AIC program. The EEG is correct in pointing out that some members of the four "futures" teams considered a probability of less than 1 for maintaining control over the site for 100 years. However, the EEG has misrepresented the relevance of this point:
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.60
EEG Comment 13 EEG Review of the CCA March 14, 1997 letter Comment Text
1. Arthur, W.J., 1992. November 3 letter from the WIPP Project Director to R.H.
Neill, Director of the Environmental Evaluation Group. 2. U.S. Department of Energy/U.S. Department of Interior, Bureau of Land Management. October 26, 1990 Memorandum of Understanding cited by the 1991 Administrative Land Withdrawal, 43 CFR Public Lands Order 6826, January 22, 1991. 3. U.S. congress, 1992. Waste Isolation Pilot Plant Land Withdrawal Act. Public Law 102-579, 102d Congress.
4. Manus, R.L., 1991. October 17 letter from BLM Carlsbad Resource Area Manger to A. Hunt, DOE WIPP Project Manager.
5. Becker, R.M., 1991. October 23 letter from DOE Repository Technology Group to R. L. Manus, BLM Carlsbad Resource Area Manager.
6. Neill, R.H., 1993. March 9 letter from the Director of the Environmental Evaluation Group to W.J. Arthur, WIPP Project Director.
7. Neill, R.H., 1993. May 26 letter from the Director of the Environmental Evaluation Group to A. Hunt, WIPP Project Manager.
8. McGough, J.M., 1981. December 30 letter to G. B. Koslri, Area Manger, U.S. Bureau of Land Management, Carlsbad Office.
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.64
9. Silva, M.K. and Channell, J.K., 1992. Implications of Oil and Gas Leases on the
10. Calkins, W.C, 1994. August 22 letter from the U.S. DOI/BLM State Director for New Mexico to Keith E. Bucy of Bass Enterprises Production Company. 11. Bass Enterprises Production Company et al., 1995. January 23 Complaint for a taking in violation of the U.S. Constitution. Case 95-52L, U.S. Court of Federal Claims, Washington D.C.
12. Hodges, R.H. Jr., 1996. June Judgement of the United State Court of Federal Claims. 95-CV-52.
13. Schiffer, L.J., 1996. Appeal from a judgement of the United States Court of Federal Claims in 95-CV-52 entered June 21, 1996, Judge Robert H. Hodges,
14. Neill, R.H. 1997. January 3 letter from the Director of the Environmental Evaluation Group to Susan Cook, Attorney for the U.S. Justice Department.
15. Martin, M.K., 1997. February 13, 1997 letter from Attorney for the U.S. Justice Department to R.H. Neill, Director of the Environmental Evaluation Group. 16. U.S. Environmental Protection Agency, 1996a. 40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR 191 Disposal Regulations, Final Rule. Federal Register (9 February) Vol. 61, no. 28, 5224-5245.
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.65 system is designed to control the area within the LWA boundary. It is assumed that the EEG intends to illustrate that procedures can be overlooked and so records and archives may not be checked systematically in the future when processing applications for drilling. These procedures would never be overlooked as the
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.66 of the PIC system was specified by the DOE task force at 1 % for the time interval from 100 to 700 years after closure. This meets the EPA requirements, as set out in 40 CFR § 194.43(c) and supplemental information, that PICs shall not be assumed to
Cone, L.M., 1995. Oct 12 letter from U.S. DOI/BLM District Manager to G.B. Griswold. U.S. department of interior, 1993. Preliminary Map Showing Distribution of potash resources, Carlsbad Mining District, Eddy and Lea Counties New Mexico By Bureau of Land Management, Roswell District.
Broadhead, R.F., F. Luo, and S.W. Speer, 1995. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant fWIPP) Site. Carlsbad, NM: Westinghouse Electric
Vaughn, G.L., 1995. December 13 Agency Answer to Appellant's Statement of Reasons by U.S. Department of Interior Bureau of Land Management General Counsel. Yates et al., appellants. IBLA 92-612.
Girswold, G.B., 1995a. Method of Potash Reserve Evaluation, in Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Carlsbad, NM: Westing house Electric Corporation. Waste Isolation Division, vol. 2, Chapter VH.
Griswold, G.B., 1995b. October letter to J. Barker, of the New Mexico Bureau of Mines and Mineral Resources, P. Anselmo of the New Mexico Institute of Mining and Technology, W. Thayer of IMC Corporation, and S. Patchet of Westinghouse Waste Isolation Division. U.S. Department of Energy, 1996. Title 40 CFR part 191 Compliance Certification Application for the Waste Isolation Pilot Plant. DOE/CAO-1996-2184. Federal Land Policy and Management Act of 1976. U.S. Code Annotated, 1989. vol. 43, sees. 1701-1784.Response to the EEG Comment on Potash Mining
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.72
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.74 line represents the minimum criteria for a reserve, and the boundary line representing the "55" contour line represents the economic mining criteria. Using the direction from the EPA's standard and current mining information, the
PA is conservative and adequately represents all possible future impacts on the WIPP disposal system. Future Activities The EEG also question the treatment of mining as a near future activity only. It is not entirely clear what criticism is being raised, but the DOE assumes the EEG is implying that mining for different resources, not identified by the NMBMMR analysis, may occur in the future. However, 40 CFR § 194.32 indicates exactly what resources should be considered in the performance assessment, and the DOE has adhered to the criteria: Outside the controlled area, the DOE shall analyze "... the effects on the disposal system of any activities that occur in the vicinity of the disposal system prior to disposal and are expected to occur in the vicinity of the disposal system soon after disposal." Inside the controlled area, the DOE "... shall assume that mineral deposits of these resources, similar in quality and type to those resources currently extracted from the Delaware Basin, will be completely removed ..." References "FINAL REPORT Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site", Volumes 1-4, New Mexico Bureau of Mines and Mineral Resources (NMBMMR), March 31, 1995. CCA Reference Number 460
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997
Cranwell, R.M., Guzowski, R.V., Campbell, J.E., and Ortiz, N.R. 1990. Risk Methodology for Geologic Disposal of Radioactive Waste: Scenario Selection Procedure. NUREG/CR-1667, SAND80-1429. Sandia National Laboratories,
Albuquerque, NM. DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.96
DOE 1996. Department of Energy Carlsbad Area Office Surveillance S96-21. February 1996.
Galson, D.A., Hicks, T.W., Wilmot, R.D. and Swift, P.N. 1995. Systems Prioritization Method - Iteration 2 Baseline Position Paper: Scenario Development for Long-Term Performance Assessments of the WIPP. Galson Sciences Ltd. Report 9203d-10, Version 4.2, March 1995.
GSL 1996. Screening of FEPs: Summary Tables. Galson Sciences Ltd. Report 9507a-9, Version 1, December 1996.
OECD Nuclear Energy Agency. 1992. Systematic Approaches to Scenario Development. Paris: OECD/NEA.
DOE's Response to EEG's Letter on the Compliance Certification Application for the WIPP Dated March 14, 1997 P.97
Appendix SCR, stating that the FEP is SO-P because: Good physical and electrical contact between the metals involved is critical to the establishment of galvanic cells. Experimental investigations suggest that this requirement is unlikely to be achieved under repository conditions (Telander and Westerman, 1993).