CUE 02-0055 Golf Course Superintendents' Association of America. [A-2000-24-VII-A-55]
Other documents for the same rulemaking (all, by stage)
References
1. BASF Technical Bulletin. 1995. New soil blending technique for quality golf greens with Basamid granular. BASF Agricultural Research Station, Limburgerhof, Germany.
2. Carpenter, J. 1997. Alternatives to methyl bromide in Florida: a preliminary analysis. National Center for Food and Agricultural
Policy, Washington, D.C. 3. Edwards. J.H., and H.D. Barnes. 1958. Changing greens from common bermudagrass to Tifgreen. USCA Journal and Turf Management ll(5):Z5-3Z.
4. Noling, J.W., and J.O. Becker. 1994. The challenge of research and extension to define and implement alternatives to methyl bromide. Journal of Nematology (Supplement) 26(4S):573-586.
5. Ohr, H.D., J.J. Sims, N.M. Grech, J.O. Becker and M.E. McGiffen Jr. 1996. Methyl Iodide, an ozone-safe alternative to methyl bromide as a soil fumigant. Plant Disease 80:731-735.
6. Wilhelm, S.N. 1996. Chloropicrin as a soil fumigant. Methyl Bromide Alternative Newsletter USDA-ARS.
7. Zhang, W.M., M.E. McGiffen Jr., J.O. Becker, H.D. OhrJ.J. Sims and R.L. Kallenbach, 1997, Dose response of weeds to methyl iodide and methyl bromide. Weed Research 37:181-189. / Bryan Unruh, Ph.D., is assistant professor and Extension turfgrass specialist in the Institute of Food and Agricultural Sciences at the University of Florida. Barry Bre'cke, Ph.D., is a weed scientist. P.43 \<#6rr/foo/ 1421 Research Park Drive • Lawrence, Kansas 66049-3859 • 785/841-2240 • http://www.gcsaa.org
GCSAA is dedicated to serving its members, advancing their profession and enhancing the enjoyment, growth and vitality of the game of golf. P.44 11 fUkJ:ll±l^ IJjJ A IMC mBkJS^^.§^SmX by EE(MILLER Golf Course Superintendent,\Pebble Beach Golf Links, Pebble Beach, California ^REPPING Pebble Beach for the 1992 U.S. Open has been a consuming focus for many months, and it will definitely remain the focus until this national championship event occurs in June, As an added consideration, our crew has spent the past year overcoming several years of drought on the Monterey Peninsula which had deteriorated the condition of Pebble Beach Golf Links in several ways. The predominant turfgrass, Poa annua, had expired to the point that fairway surfaces had become parched and unplayable. With the Poa continually under stress, it posed little competition to the extremely aggressive and invasive kikuyugrass (Pennisetum clandestinum). Kikuyugrass was running rampant, with stolons as thick as a pencil and virtually nothing to stand in its way. Its population had increased to the point that it was dominating the holes along the coast and becoming a significant force in the remaining areas. At the same time, the 4th, 5th, and 7th greens were in disrepair and needed a facelift. With the 1992 U.S. Open only 22 months away, the situation was becoming critical and considerable work had to be done. In September 1990, with the support of the Pebble Beach Company ownership, the United States Golf
Association, the Monterey Peninsula Water Management District, and the architectural assistance of Jack Nicklaus Golf Services, the Pebble Beach Company embarked on a three-phase program to restore Pebble Beach Golf Links and prepare for the 1992 U.S. Open Championship.
HE FIRST PHASE consisted of a large-scale kikuyugrass-control program and the establishment of a more desirable turfgrass species. The second phase was scheduled for the spring of 1991 and involved rebuilding greens 4, 5, and 7. The third and final phase was the "one hole at a time'' kikuyugrass-control program around greens and tees, with bunker restoration, reclamation of putting surfaces, and the leveling and enlargement ol tees being performed while the area; were renovated. Phase three was performed during the summer and earl)