Draft Interim Staff Guidance DRO-ISG-2023-03, "Development of Scalable Human Factors Engineering Review Plans"
Other documents for the same rulemaking (all, by stage)
References
IEEE (2022). “IEEE Guide for Human Factors Applications of Computerized Operating Procedure Systems (COPS) at Nuclear Power Generating Stations and Other Nuclear Facilities,” in IEEE Std 1786-2022, June 10, 2022.
NRC (2024a). “Advanced Reactor Content of Applications Project Chapter 11, ‘Organization and Human-System Considerations’” (DANU-ISG-2022-05). Washington, DC: U.S. Nuclear Regulatory Commission, March 2024. ML23277A143.
NRC (2021). “Pre-application Engagement to Optimize Advanced Reactors Application Reviews” (draft). Washington, DC: U.S. Nuclear Regulatory Commission, May 2021. No. ML21145A106.
NRC (2024b). “Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications—Roadmap” (DANU-ISG-2022-01). Washington, DC: U.S. Nuclear Regulatory Commission. March 2024. ML23277A139.
NRC (2020). “Human-System Interface Design Review Guidelines” (NUREG-0700, Rev. 3).
Washington, DC: U.S. Nuclear Regulatory Commission, July 2020. ML20162A214
NRC (2019), “Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests,” (MD 8.4). Washington, DC: U.S. Nuclear Regulatory Commission, September 2019. ML18093B087.
NRC (2016). “Standard Review Plan for the Review of Safety Analysis for Nuclear Power Plants: LWR Edition,” Chapter 18, “Human Factors Engineering, Rev. 3” (NUREG-0800).
Washington, DC: U.S. Nuclear Regulatory Commission, December 2016. ML16125A114
NRC (2012). “Human Factors Engineering Program Review Model” (NUREG-0711, Rev. 3).
Washington, DC: U.S. Nuclear Regulatory Commission, November 2012. ML12324A013
NRC (2008). “Policy Statement on the Regulation of Advanced Reactors.” Washington, DC: U.S. Nuclear Regulatory Commission, October 7, 2008. ML082750370.
NRC (2007). “Guidance for the Review of Changes to Human Actions” (NUREG-1764, Rev. 1).
Washington, DC: U.S. Nuclear Regulatory Commission, September 2007. ML072640413
Washington, DC: U.S. Nuclear Regulatory Commission, July 2005. ML052080125
AIAA (1992). “AIAA Recommended Technical Practice—Operational Concept Document Preparation Guidelines.” Reston, Virginia: American Institute of Aeronautics and Astronautics, May 2018.
DOD (2000). “Operational Concept Description” (DI-IPSC-81430A). Washington, DC: U.S. Department of Defense, January 2000.
DOD (1995). “Software Development and Documentation Standard” (MIL-STD-498).
Washington, DC: U.S. Department of Defense. January 1995.
Thayer (1977). “The Concept of Operations: The Bridge from Operational Requirements to Technical Specifications.” Annals of Software Engineering, 3, 417–432, January 1997.
IEEE (2007). “IEEE Guide for Information Technology—System Definition—Concept of Operations (ConOps) Document” (IEEE Std 1362-1998; R2007). Piscataway, New Jersey: IEEE December 2007.
Pena (2012). “Human-Performance Issues Related to the Design and Operation of Small Modular Reactors” (NUREG/CR-7126). Washington, DC: U.S. Nuclear Regulatory Commission, June 2012.
Mavor (2007). Human-System Integration in the System Development Process: A New Look. Washington, DC: The National Academies Press.
Molin (2009). “Concept of Operations Storyboard Tool.” In Proceedings of the Human Factors and Ergonomics Society 53rd Annual Meeting. Santo Monica, California: Human Factors and Ergonomics Society, October 2009.
Alekseev (2017). “Inherent Safety Characteristics of Advanced Fast Reactors.” Journal of Physics: Conference Series (Vol. 781, No. 1, p. 012001). IOP Publishing.
Luxat (2020). “Technical and Licensing Considerations for Micro-Reactors” (SAND2020-4609). Albuquerque, New Mexico: Sandia National Laboratories, April 1, 2020. Agencywide Documents Access and Management System (ADAMS) Accession No. ML20156A101.
Jerden (2020). “Technical Letter Report on the Assessment of Tritium Detection and Control in Molten Salt Reactors: Final Report” (ANL/NSE-20-15).
Argonne, Illinois: Argonne National Laboratory. May 2020. ML20157A155.
IAEA (2009). “Passive Safety Systems and Natural Circulation in Water Cooled Nuclear Power Plants” (IAEA-TECDOC-1624). Vienna, Austria: International Atomic Energy Agency.
IAEA (1991). “Safety Related Terms for Advanced Nuclear Plants” (TECDOC-626). Vienna, Austria: International Atomic Energy Agency.
Pint (2021). “Corrosion in Gas-Cooled Reactors” (TLR-RES/DE/CIB-CMB2021-04). Oak Ridge, Tennessee: Oak Ridge National Laboratory, March 2021. ML21084A041.
NEI (2019). “Risk-Informed Performance-Based Technology Inclusive Guidance for Non-Light Water Reactor Licensing Basis Development” (NEI 18-04, Revision 1). Washington, DC: Nuclear Energy Institute. August 2019. ML19241A472
Commission, September 2022. Access and Management System (ADAMS) Accession No. ML22266A068.
NRC (2021a). “Ground Rules for Regulatory Feasibility of Remote Operations of Nuclear Power Plants.” Washington, DC: U.S. Nuclear Regulatory Commission, November 2021. ML21291A024.
NRC (2021b). “Risk-Informed and Performance-Based Human-System Considerations for Advanced Reactors.” Washington, DC: U.S. Nuclear Regulatory Commission. March 2021. ML21068A003. B-41
NRC (2021c). “Pre-application Engagement to Optimize Advanced Reactors Application Reviews,” Washington, DC: U.S. Nuclear Regulatory Commission, draft issued May 2021. ML21145A106.
NRC (2020a). “Policy and Licensing Considerations Related to Micro-Reactors” (SECY-20-0093). Washington, DC: U.S. Nuclear Regulatory Commission, October 6, 2020. ML20254A363.
NRC (2020b). “Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses,
NRC (2020c). “Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities” (NUREG-2215). Washington, DC: U.S. Nuclear Regulatory Commission, April 2020.
NRC (2020d). “Human-System Interface Design Review Guidelines” (NUREG-0700, Rev. 3).
NRC (2019). Memorandum from M. Doane to D. Dorman, “Implementing Commission Direction on Applying Risk-Informed Principles in Regulatory Decision Making.” Washington, DC: U.S. Nuclear Regulatory Commission, November 18, 2019. ML19319C832.
NRC (2016). Letter from NuScale Power, LLC to U.S. Nuclear Regulatory Commission, “NuScale Power, LLC Submittal of Third Set of Human Factors Engineering Documentation for Design Certification Application.” December 29, 2016. ML16364A348.
NRC (2016). “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,” Chapter 18, “Human Factors Engineering, Rev. 3” (NUREG-0800).
Washington, DC: U.S. Nuclear Regulatory Commission, December 2016. ML16125A114.
NRC (2016). “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,” Chapter 13, “Conduct of Operations” (NUREG-0800). Washington,
DC: U.S. Nuclear Regulatory Commission, August 2016. ML15009A110.
NRC (2015). “NRC Reviewer Aid for Evaluating the Human-Performance Aspects Related to the Design and Operation of Small Modular Reactors” (NUREG/CR-7202). Washington, DC: U.S. Nuclear Regulatory Commission, June 2015. ML15182A199
NRC (2011). “Operator Staffing for Small or Multi-Module Nuclear Power Plant Facilities” (SECY-11-0098). Washington, DC: U.S. Nuclear Regulatory Commission, July 22, 2011. ML111870574.
NRC (2010). “Standard Review Plan for Spent Fuel Dry Storage Systems at a General License Facility” (NUREG-1536, Rev. 1). Washington, DC: U.S. Nuclear Regulatory Commission, July 2010. ML101040620 B-42
NRC (2000). “Standard Review Plan for Spent Fuel Dry Storage Facilities” (NUREG-1567).