{"document":{"doc_id":199917,"source":"docket_item","org":"NRC","doc_type":"other","title":"LR-ISG-2026-01 Updated Review Criteria for License Renewal","date":"2026-07-16","url":"https://www.regulations.gov/document/NRC-2025-0975-0019","source_native_id":"NRC-2025-0975-0019","status":"fetched","abstract":null,"action":null},"dockets":["NRC-2025-0975"],"rins":["RIN 3150-AL44"],"related":[{"doc_id":81622,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices","date":"2026-07-16"},{"doc_id":87725,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Regulatory Analysis for the Proposed Rule Modernizing reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":127298,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"Unofficial Redline Rule Language for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":162683,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1454 Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments Proposed New Regulatory Guide 1.269","date":"2026-07-16"},{"doc_id":162685,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Environmental Assessment for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":199901,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1430 Performance-Based Emergency Preparedness Proposed Revision 1 to Regulatory Guide 1.242","date":"2026-07-16"},{"doc_id":199902,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1465 Guidance for a Technology Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses Cert","date":"2026-07-16"},{"doc_id":199903,"source":"docket_item","org":"NRC","doc_type":"other","title":"OMB Supporting Statement for Information Collections Contained in Modernizing Reactor Licensing Safety Oversight and Siting Practices Proposed Rule","date":"2026-07-16"},{"doc_id":199904,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1263 Revision 1 Establishing Analytical Limits for Zirconium-Based Alloy Cladding Proposed New Regulatory Guide 1.224","date":"2026-07-16"},{"doc_id":199905,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1456 Emergency Response Planning and Preparedness for Nuclear Power Reactors Proposed Revision 8 to Regulatory Guide 1.101","date":"2026-07-16"},{"doc_id":199906,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1261 Revision 1 Measuring Breakaway Oxidation Behavior Proposed New Regulatory Guide 1.222","date":"2026-07-16"},{"doc_id":199907,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1463 Meteorological Monitoring Programs for Nuclear Power Plants. Proposed Revision 2 to Regulatory Guide 1.23","date":"2026-07-16"},{"doc_id":199908,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1428 Plant-Specific Applicability of the Transition Break Size Proposed New Regulatory Guide 1.258","date":"2026-07-16"},{"doc_id":199909,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1467 Assuring the Availability of Funds for Decommissioning Nuclear Reactors Proposed Revision 3 to Regulatory Guide 1.159","date":"2026-07-16"},{"doc_id":199910,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1462 A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion Proposed Rev 1 to RG 1.208","date":"2026-07-16"},{"doc_id":199911,"source":"docket_item","org":"NRC","doc_type":"other","title":"NUREG-0800 Chapter 14 Section 14.3 Inspections Tests Analyses and Acceptance Criteria","date":"2026-07-16"},{"doc_id":199912,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1262 Revision 1 Determining Post Quench Ductility Proposed New Regulatory Guide 1.223","date":"2026-07-16"},{"doc_id":199913,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1457 Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors Proposed Revision 2 to Regulatory Guide 1.219","date":"2026-07-16"},{"doc_id":199914,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1468 Guidance for Implementation of 10 CFR 50.221 Credibility Requirements for Modeling and Simulation Proposed New Regulatory Guide 1","date":"2026-07-16"},{"doc_id":199915,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1426 An Approach for a Risk-Informed Evaluation Process Supporting Alternative Acceptance Criteria for Emergency Core Cooling Systems","date":"2026-07-16"},{"doc_id":199916,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1464 Guidance for Content of Applications Under 10 CFR 50.220 and 52.220 Proposing Risk-Informed and Performance-Based Alternative Acceptance Criteria","date":"2026-07-16"},{"doc_id":199918,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1461 Guidance for Changes During Construction for New Nuclear Power Plants Being Constructed Under a Combined License","date":"2026-07-16"},{"doc_id":199919,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1466 Guidance for Implementation of 10 CFR 50.59 Changes Tests and Experiments Proposed Revision 4 to Regulatory Guide 1.187","date":"2026-07-16"},{"doc_id":199920,"source":"docket_item","org":"NRC","doc_type":"other","title":"OMB Burden Tables for Modernizing Reactor Licensing Safety Oversight and Siting Practices Proposed Rule","date":"2026-07-16"},{"doc_id":199921,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1460 Applications for Nuclear Power Plants. Proposed Revision 2 to Regulatory Guide 1.206","date":"2026-07-16"},{"doc_id":199923,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1425 Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors Proposed Rev 2 to RG 1.183","date":"2026-07-16"},{"doc_id":199924,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1434 Addressing the Consequences of Fuel Dispersal in Light-Water Reactor Loss of Coolant Accidents Proposed New Regulatory Guide 1","date":"2026-07-16"},{"doc_id":199925,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-4036 Graded Approach to Site Characterization for New Reactor Applications Proposed New Regulatory Guide 4.29","date":"2026-07-16"},{"doc_id":81590,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule (administrative)","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices; Correction","date":"2026-07-27"},{"doc_id":199595,"source":"docket_item","org":"NRC","doc_type":"other","title":"Response to Conference of Radiation Control Program Directors Request for Extension of Comment Period ML26210A428","date":"2026-08-06"},{"doc_id":199596,"source":"docket_item","org":"NRC","doc_type":"other","title":"Response to Nuclear Innovation Alliance Request for Extension of Comment Period ML26216A300","date":"2026-08-06"},{"doc_id":199597,"source":"docket_item","org":"NRC","doc_type":"other","title":"Response to Connecticut Department of Energy and Environmental Protection Request for Extension of Comment Period ML26210A425","date":"2026-08-06"},{"doc_id":199118,"source":"docket_item","org":"NRC","doc_type":"other","title":"Response to Offices of the Illinois and Massachusetts Attorneys General Request for Extension of Comment Period ML26237A192","date":"2026-08-26"},{"doc_id":199115,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of August 3, 5, and 6, 2026, Public Meetings on Executive Order 14300 Rulemaking, Modernizing Reactor Licensing, Safety Oversight, and Siting Practices","date":"2026-08-28"}],"references":[{"citation_id":2387568,"raw_reference":"NRC, 2002 U.S. Nuclear Regulatory Commission, NUREG/BR-0303, “Guidance for Performance-Based Regulation,” December 2002, ADAMS Accession No. ML023470659.","cited_authors":"NRC, 2002 U.S. Nuclear Regulatory Commission, NUREG/BR-0303, “Guidance for Performance-Based Regulation,” December","cited_year":"2002","cited_title":"ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387569,"raw_reference":"NRC, 2010a U.S. Nuclear Regulatory Commission, NUREG-1800, Revision 2, “Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.” (SRP) December 2010, ML103490036.","cited_authors":"NRC, 2010a U.S. Nuclear Regulatory Commission, NUREG-1800, Revision 2, “Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.” (SRP) December","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387570,"raw_reference":"NRC, 2010b U.S. Nuclear Regulatory Commission, NUREG-1801, Revision 2, “Generic Aging Lessons Learned (GALL) Report,” December 2010, ML103490041.","cited_authors":"NRC, 2010b U.S. Nuclear Regulatory Commission, NUREG-1801, Revision 2, “Generic Aging Lessons Learned (GALL) Report,” December","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387571,"raw_reference":"NRC, 2018 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 3, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,” January 2018, ML17317A256.","cited_authors":"NRC, 2018 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 3, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,” January","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387572,"raw_reference":"NRC, 2020 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.188, Revision 2, “Standard Format and Content for Applications to Renew Draft LR-ISG-2026-01 Page 9 of 9 Nuclear Power Plant Operating Licenses,” April 2020, ML20017A265.","cited_authors":"NRC, 2020 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.188, Revision 2, “Standard Format and Content for Applications to Renew Draft LR-ISG-2026-01 Page 9 of 9 Nuclear Power Plant Operating Licenses,” April","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387573,"raw_reference":"NRC, 2021a U.S. Nuclear Regulatory Commission, “Closure of Activity to Consider the License Renewal for 40 Years of Additional Nuclear Power Plant Operation,” June 22, 2021, ML21117A007.","cited_authors":"NRC, 2021a U.S. Nuclear Regulatory Commission, “Closure of Activity to Consider the License Renewal for 40 Years of Additional Nuclear Power Plant Operation,” June 22","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387574,"raw_reference":"NRC, 2021b U.S. Nuclear Regulatory Commission, Regulatory Guide 1.178, Revision 2, “Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping,” April 2021, ML21036A105.","cited_authors":"NRC, 2021b U.S. Nuclear Regulatory Commission, Regulatory Guide 1.178, Revision 2, “Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping,” April","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387575,"raw_reference":"NRC, 2025a U.S. Nuclear Regulatory Commission, SECY-25-0104, “Subsequent License Renewal Review Efficiency,” December 17, 2025, ML25229A004.","cited_authors":"NRC, 2025a U.S. Nuclear Regulatory Commission, SECY-25-0104, “Subsequent License Renewal Review Efficiency,” December 17","cited_year":"2025","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387576,"raw_reference":"NRC, 2025b U.S. Nuclear Regulatory Commission, NUREG-2191, Revision 1, “Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report,” July 2025, Volume 1, ML25113A021, and Volume 2, ML25113A022.","cited_authors":"NRC, 2025b U.S. Nuclear Regulatory Commission, NUREG-2191, Revision 1, “Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report,” July","cited_year":"2025","cited_title":"Volume 1, ML25113A021, and Volume 2, ML25113A022","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387577,"raw_reference":"NRC, 2025c U.S. Nuclear Regulatory Commission, NUREG-2192, Revision 1, “Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants.” (SRP-SLR), July 2025, ML25113A023.","cited_authors":"NRC, 2025c U.S. Nuclear Regulatory Commission, NUREG-2192, Revision 1, “Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants.” (SRP-SLR), July","cited_year":"2025","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2387578,"raw_reference":"NRC, 2025d U.S. Nuclear Regulatory Commission, “NRC Workshop on Structural Materials: Research for 80 Years and Beyond, Summary Report,” Research Information Letter (RIL)-2025-06, September 2025, ML25258A153.","cited_authors":"NRC, 2025d U.S. Nuclear Regulatory Commission, “NRC Workshop on Structural Materials: Research for 80 Years and Beyond, Summary Report,” Research Information Letter (RIL)-2025-06, September","cited_year":"2025","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}