Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Oil and Gas Drilling Operations
This final rule restructures the requirements for oil and gas drilling operations on the Outer Continental Shelf (OCS), adds some new requirements, and converts the regulations into plain language. The restructuring of the rule follows the logical sequence of obtaining approval to drill a well and conducting drilling operations. The final rule also removes overly prescriptive requirements and updates requirements to reflect changes in drilling technology. Restructuring the drilling requirements makes the regulations easier to read, understand, and follow. The technical changes will help ensure that lessees conduct operations in a safe manner.
Original sourceXML (304 KB)PDF (266 KB)
Other documents for the same rulemaking (all, by stage)
References: 5 extracted, 1 linked to papers
Reliability of Subsea BOP Systems for Deepwater Application, Phase II DW, by Per Holand of SINTEF Industrial Management (1999)
API RP 53, Recommended Practice for Blowout Prevention Equipment Systems for Drilling Wells
West, Inc.’s complete report is available on the MMS Web site at ftp://www.mms.gov/TARProjects/380/380AA.pdf
API RP 5C7 for Coiled Tubing Operations in Oil and Gas Well Services
Oil & Gas Journal, p. 148, Nov. 17, 1980