Compliance Application Review Documents (CARDS) (Vols. 1-2) [A-93-02-V-B-2]
Other documents for the same rulemaking
References: 156 extracted, 0 linked to papers
DOE 1997a. U.S. Department of Energy. Summary of EPA-Mandated Performance Assessment Verification Test (Replicate 1) and Comparison with the Compliance Certification Application Calculations. July 25, 1997. (Docket A-93-02, Item II-G-26)
DOE 1997b. U.S. Department of Energy. Supplemental Summary of EPA-Mandated Performance Assessment Verification Test (All Replicates) arid Comparison with the Compliance Certification Application Calculations (WPO #46702). August 8, 1997. (Docket A-93-02, Item II-G-28)
DOE 1997c. U.S. Department of Energy. Conceptual Models Third Supplementary Peer Review Report. April 1997. (Docket A-93-02, Item II-G-22)
EPA 1998a. U.S. Environmental Protection Agency. Technical Support Document for 194.32:
Fluid Injection Analysis. 1997. (Docket A-93-02, Item V-B-22)
EPA 1998b. U.S. Environmental Protection Agency. Technical Support Document: EPA's Analysis of Air Drilling at WIPP, Rev. 1. 1998. (Docket A-93-02, Item V-B-29)
EPA 1998c. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: 'Parameter Justification Report. 1998. (Docket A-93-02, Item V-B-14)
EPA 1998d. U.S. Environmental Protection Agency. Technical Support Document: Overview of Major Performance Assessment Issues. 1998. (Docket A-93-02, Item V-B-5) 33-30 P.57
EPA 1998e. U.S. Environmental Protection Agency. Technical Support Document for Section 194.32: Scope of Performance Assessments. 1998. (Docket A-93-02, Item V-B-21)
Freeze, R.A., and J.A. Cherry. Groundwater. Englewood Cliffs, NJ: Prentice Hall. 1979. (CCA Reference #257)
NMBMMR 1995. New Mexico Bureau of Mines and Mineral Resources. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site, Final Report. 1995. (CCA Reference #460) 33-31 P.58
DOE 1997b. U.S. Department of Energy. Supplemental Summary of EPA-Mandated Performance Assessment Verification Test (All Replicates) and Comparison with the Compliance Certification Application Calculations, WPO#46702. August 8,1997. (Docket A-93-02, Item II-G-28)
EPA 1998a. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Parameter Report. 1998. (Docket A-93-02, Item V-B-12)
EPA 1998c. U.S. Environmental Protection Agency. Technical Support Document: Overview of Major Performance Assessment Issues. 1998. (Docket A-93-02, Item V-B-5)
EPA 1998d. U.S. Environmental Protection Agency. Technical Support Document for Section 194.34: Use of CCDF Formalism in the WIPP PA. 1998. (Docket A-93-02, Item V-B23)
Helton, J.C. "Probability, Conditional Probability, and Complementary Cumulative Distribution Functions in Performance Assessment for Radioactive Waste Disposal." Sandia National Laboratories. SAND95-2571. March 1996.
DOE provided information in support of its demonstration of compliance with Section 194.41(a) in Chapter 7.1 (pp. 7-1 to 7-31) and Appendix AIC. In Appendix AIC, DOE described the AICs and their locations and provided a graphic representation (p. 17). Supplemental information from DOE in a letter dated February 7, 1997, elaborated on the implementation, maintenance, surveillance, and replacement of AICs (Docket A-93-02, Item H-I-07, Enclosure lc). The proposed AICs principally consist of a barbed wire fence and an unpaved roadway. The barbed wire fence will surround a rectangular area approximately 2,780 feet x 2,360 feet and is intended to control access and indicate controlled ownership ofthe area above the repository "footprint." The fence will be marked with signs that indicate danger and prohibit entry or disturbance. The fence will be surrounded by an unpaved roadway 16 feet wide and will provide access for periodic site surveillance (drive by patrol 2-3 times a week), so that potential human intrusion into the repository can be detected before it occurs. Thefrequencyofthe site surveillance would preclude the setup of an activity (such as deep drilling) that could intrude on the repository. In Chapter 7.1 (p. 7-6), DOE stated that the active controls will be implemented for at least 100 years. DOE also committed to maintaining surveillance ofthe site for at least 100 years (Appendix AIC, p. 16). The time line for implementation of AICs is found in Figure 7-1 ofthe
EPA expected the CCA to contain an analysis ofthe effects of disposal system parameters on the containment of waste. At a minimum, the parameters analyzed must include those listed in Section 194.42(a), items (1) through (7). This analysis should detail all the parameters analyzed, the methodology and assumptions used, and the results ofthe analysis. 42.A.5 DOE METHODOLOGY AND CONCLUSIONS The information supporting DOE's compliance with this requirement is located in Chapter 7.2, Appendix MON, and Attachment 1 to Appendix MON (MONPAR) ofthe CCA. EPA requested additional explanations and documentation regarding DOE's analysis in a letter dated December 19, 1996 (Docket A-93-02, Item No. II-I-Ol). In response, on February 14, 1997,
DOE 1980. U.S. Department of Energy. Final Environmental Impact Statement, Waste Isolation Pilot Plant, Vols. 1 and 2, DOE/EIS-0026. 1980. (CCA Reference #178)
DOE 1981. U.S. Department of Energy and State of New Mexico. Consultation and
Cooperation Agreement. 1981. (CCA Reference #212)
DOE 1992. U.S. Department of Energy. Background Water Quality Characterization Report for the Waste Isolation Pilot Plant, DOE-WIPP 92-013. 1992. (CCA Reference #190)
DOE 1994. Westinghouse Electric Corp. Backfill Engineering Analysis Report. 1994. (CCA Reference #684)
DOE 1996. U.S. Department of Energy. RCRA Part B Permit Application, Revision 6,
DOE submitted supplemental information relevant to the marker design with a letter dated The WIPP Land Withdrawal perimeter encompasses an area of 16 square miles. DOE refers to this territory, which was placed under DOE's authority by the 1992 WIPP Land Withdrawal Act, as the "controlled
EPA 1998. U.S. Environmental Protection Agency. Technical Support Document: Waste Isolation Pilot Plant Passive Institutional Controls Implementation Cost Estimate. 1998. (Docket'A-93-02, Item V-B-24)
Laboratories. 1991. 43-46 P.61 HITF 1984. Human Interference Task Force. Reducing the Likelihood of Future Human Activities That Could Affect Geologic High-Level Waste Repositories, BMI/ONWI-537. Battelle Memorial Institute, Office of Nuclear Waste Isolation. 1984.
NRC 1990. U.S. Nuclear Regulatory Commission. Eliciting and Analyzing Expert Judgment,
NUREG/CR-5424. 1990. Silva, Matthew K., and Channell, James K. Implications of Oil and Gas Leases at the WIPP on Compliance with EPA TRU Waste Disposal Standards (EEG-50). Environmental
Evaluation Group. 1992. (CCA, Appendix PEER. 19)
WIPP (EEG-55). Environmental Evaluation Group. 1994. (Docket A-93-02, Item II-A41)
Taylor, James. Institutional Controls Used to Protect Waste Disposal Sites from Inadvertent Intrusion. Nuclear Regulatory Commission Policy Issue (Information). U.S. Nuclear Regulatory Commission. November 1993.
DOE 1991. U.S. Department of Energy. Final Report ofthe Engineered Alternatives Task
Force, Revision 0, DOE/WIPP 91-007; 1991. (CCA Reference #187)
DOE 1996. U.S. Department of Energy. Resource Conservation and Recovery Act Part B Permit Application, DOE/WIPP 91-005, Revision 6. April 1996.
SNL 1995. Sandia National Laboratories. Systems Prioritization Mediod - Iteration 2 (SPM-2) Baseline Position Paper: Actinide Source Term, SAND95-1017/1, WP042382. 1995. 44-31 P.93
EPA 1998. U.S. Environmental Protection Agency. Technical Support Document for Sections 194.51, 194.52 and 194.55: Dose Verification Evaluation. 1998. (Docket A-93-02, Item V-B-25) 51-9 P.16
DOE 1997. U.S. Department of Energy. Summary of the EPA-Mandated Performance Assessment Verification Test Results for the Individual and Groundwater Protection Requirements. WPO#47258. September 12, 1997. (Docket A-93-02, Item II-G-39) 53-6
DOE was required to identify the natural processes, events, or sequences of processes and events that may occur over the regulatory time frame. DOE indicated that WIPP FEP analysis was initiated using a FEP list assembled by the Swedish Nuclear Power Inspectorate (SKI). This list included over 1,200 FEPs, which DOE screened to the 900 FEPs that were included in the 1995 Draft CCA. These 900 FEPs were then screened by DOE, based upon the final Compliance Criteria requirements, consequence, and probability for disturbed and undisturbed conditions, to the approximately 240 FEPs included in the October 1996 CCA. EPA reviewed the FEP listing for completeness, accuracy, and justifiability. 54.A.4 COMPLIANCE REVIEW CRITERIA
EPA 1998a. U.S. Environmental Protection Agency. EPA Technical Support Document for Section 194.32: Scope of Performance Assessments. 1998. (Docket A-93-02, Item VB-21)
EPA 1998b. U.S. Environmental Protection Agency. Technical Support Document for Section 194.32: Fluid Injection Analysis. 1998. (Docket A-93-02, Item V-B-22)
NMBMMR 1995. New Mexico Bureau of Mines and Mineral Resources. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site, Final Report. 1995. (CCA Reference #460) Stenhouse et al. M.J. Stenhouse, N.A. Chapman, and T.J. Sumerling. Scenario Development
FEP Audit List Preparation: Methodology and Presentation. Technical Report 93:27. Stockholm: Swedish Nuclear Power Inspectorate (SKI). April 1993. (CCA Reference #605) Stoelzel and O'Brien. D.M. Stoelzel and D.G. O'Brien. The Effects of Salt Water Disposal and Waterflooding on the WIPP. Sandia National Laboratories, FEP-7a, WPO40837. 1996. Stoelzel and Swift. D.M. Stoelzel and P.N. Swift. Supplemental Analyses ofthe Effects of Salt Water Disposal and Waterflooding on the WIPP. Sandia National Laboratories, WP044158, Revision 0. 1997. 54-17 P.39
DOE 1997b. U.S. Department of Energy. Supplemental Summary of EPA-Mandated Performance Assessment Verification Test (All Replicates) and Comparison with the Compliance Certification Application Calculations (WPO #46702). August 8, 1997. (Docket A-93-02, Item II-G-28) 55-24 P.63
DOE 1997c. U.S. Department of Energy. Summary ofthe EPA Mandated Performance Assessment Test Results for Individual Protection Requirements: Estimated Doses to Internal Organs and Total Groundwater Ingestion and to the Total BodyfromBeef
Consumption, Vegetable Consumption, and Inhalation of Soil (WPO #47309). September 22, 1997. (Docket A-93-02, Item II-G-40)
DOE 1997d. U.S. Department of Energy. Analysis Report of an Evaluation ofthe Dose Contributions from Beta, Electron, and Photon Emissions to Critical Organs Related to Drinking Water Consumed for the Undisturbed Performance Supporting the Compliance Certification Application (WPO #47308). September 22,1997. (Docket A-93-02, Item IIG-41)
DOE 1997e. U.S. Department of Energy. Analysis Package in Support ofthe WIPP CCA, Dose Calculations of Other Pathways (WPO #43298). August 14, 1997.
DOE 1997f. U.S. Department of Energy. Summary ofthe EPA-Mandated Performance Assessment Verification Test Results for the Individual and Groundwater Protection Requirements (WPO #47258). September 12,1997. (Docket A-93-02, Item II-G-39)
EPA 1998a. U.S. Environmental Protection Agency. Technical Support Document for Sections 194.51, 194.52, and 194.55: Dose Verification Evaluation. 1998. (Docket A-93-02, Item V-B-25)