Compliance Application Review Documents (CARDS) (Vols. 1-2) [A-93-02-V-B-2]
Other documents for the same rulemaking
References: 156 extracted, 0 linked to papers
EPA also concluded that DOE's choice of a more moderate loading and unloading history at the WIPP site was technically adequate, based on a review ofthe various depositional and erosional interpretations (scenarios) presented in Chapter 2.1.5.2 (pp. 2-74 to 2-79). The CCA, however, did not specify which loading and unloading event(s) most likely influenced the hydrology ofthe Permian units, as well as other units, at the WIPP site and does not link this information with observed fracturing in the Rustler. Nonetheless, EPA concluded that it is unlikely that loading/unloading will be of sufficient magnitude to significantly impact the Rustler unit's characteristics over the regulatory time period. EPA's detailed review ofthe loading and unloading history is contained in EPA Technical Support Document for Section 194.14: Content of Compliance Certification Application, Section IV.B.4 (EPA 1998a). Geomorphology. Topography, and Soils
EPA concluded that DOE's description ofthe physiography, geomorphology, and topography presented in Chapters 2.1.4 and 2.1.3.10 (pp. 2-64 to 2-68 and 2-63) was technically adequate, as was DOE's description of soil series at the WIPP. This subject is discussed in greater detail in EPA Technical Support Document for Section 194.14: Content of Compliance Certification Application, sections IV.B.5 and IV.B.6 (EPA 1998a). Natural Resources Identification
DOE concluded that the most important extractable resources in the WIPP are hydrocarbons, potassium salts, and water. EPA agreestiiatthis conclusion is reasonable. 14-27 P.38 Chapter 2.3 (pp. 2-145 to 2-161), Appendices DEL.4 (pp. DEL 9 to DEL 25), DEL.5 (pp. DEL26 to DEL-46), and an evaluation by the New Mexico Bureau of Mines and Mineral Resources (NMBMMR 1995) discuss estimates of these resources in detail, including current and future mining and oil and gas extraction technologies. With respect to potash, the CCA states that only the 4th and 10th horizons are economic reserves, although remaining ore zones are considered resources that would be mined with advances in thin-seam extraction technologies. This map was similar to that identified in an EPA technical memorandum (Docket A-92-56, Item IV-B-07).
EPA concluded that neither DOE's nor Department of Interior's estimate shows the area above the WIPP waste panels as containing mineable reserves. EPA also found that Chapter 2.5 focused on extractable resources of most apparent immediate import but did not address other resource removal activities, such as the extraction of salt-bearing waters for use in oil-extraction or potash solution mining. DOE provided supplemental information in a letter dated May 14, 1997, indicating that potash solution mining and brine extraction do not need to be considered for the PA, based on low consequence to the containment capability ofthe repository (Docket A-9302, Item II-I-31). EPA reviewed the supplemental data and concurs with DOE's conclusion. See
DOE data imply diis probability could be as high as about 60 percent (Chapter 2.2.1.2.2, pp. 2107 to 2-108). Therefore, in a letter dated April 25,1997 (Docket A-93-02, Item II-I-27), EPA required this parameter to be sampled between a range of 1 and 60 percent in the PAVT2 (DOE 1997b and 1997c). In addition, EPA modified the values for parameters such as bulk compressibility of Castile rock so that the brine reservoir used in the PA would be sampled more representatively relative to larger, higher-end possible brine volumes. Further information on
EPA found that DOE's compressibility parameters for the Castile brine reservoir and representation of brine pocket size/volume in the PA were not consistent with available information. EPA believes, however, that the parameters of the Castile brine reservoirs are highly uncertain, particularly the rock compressibility and related brine pocket volume. In situations where the actual value of a parameter is not known, it is appropriate to sample it statistically from a range of parameter values. EPA directed DOE to conduct new PA modeling that included modified parameter values in letters dated March 19. 1997 (Docket A-93-02, Item II-I-Ol, Enclosure 3), and April 25, 1997 (Docket A-93-02, Item II-I-27, Enclosure 2). EPA required that the parameters regarding rock compressibility and porosity (e.g. Castile COMPRCK), as well as how the brine pocket volume is sampled, be modified in the PAVT (Docket A-93-02, Items II-G-26 and II-G-28). This approach effectively modified the sampled brine pocket volume to include, more representatively, the possibility of higher brine pocket volumes like that at
TFIELD-23). EPA found that Chapter 2.2.1.4.1.2 (pp. 2-118 to 2-127) did not provide a detailed discussion ofthe origin of these variations relative tofractureinfill/dissolution, integration of climatic change, and loading/unloading events, which are important to understanding not only current transmissivity differences but also potential future transmissivity variations that could affect PA calculations. However, EPA's review stated that determination ofthe specific origin of these fractures was not necessary because conditions are not expected to change during the regulatory period. DOE provided supplemental information in letters dating January 24, 1997, March 12, 1997, May 14, 1997, June 13, 1997, and July 3, 1997 (Docket A-93-02, Items II-I-03,
EPA Technical Support Document for Section 194.14: Assessment of Kds Used in the Compliance Certification Application (EPA 1998b). 14-34 no data that directly indicate that WIPP area ground water is less than 46 years in age. The 46year time frame represents the approximate amount of time since the start of atmospheric thermonuclear weapons tests.
DOE stated ,and EPA agreed, that 14C dates from samples taken in wells not contaminated by organic additives in drilling fluids supported minimum ground water ages of around 13,000 years (WPO 26144). Vertical recharge to the Culebra from any source of younger water might be capable of reducing minimum age dates but can not cause anomalous older waters to occur. The consistently old l4C ages, the very low probability of significant recharge from the site surface (EEG-32, Docket A-93-02, Item II-A-41) and the absence of point sources of local recharge in the hydrologic testing results strongly refute arguments that Culebra water is "young." DOE's site flow model includes flow within the Rustler Formation. The numerical site flow model accepted by the Conceptual Models Peer Review Panel (July 1996) is based on abundant in-situ hydrologic data and does not imply or permit the presence of strong local sources of recharge of young meteoric water through the parts ofthe Rustler that overlay the Culebra. Capitan Aquifer and Rustler/Salado Contact
DOE's modeling identified that radionuclides will not reach the Dewey Lake, thus removing the formation as a unit needing consideration as a pathway (DOE 1997b and 1997c). EPA concluded that Saiado marker beds and the Culebra were adequately identified and characterized to the level necessary for PA calculations. 14-36 14.C.3 COMPLIANCE REVIEW CRITERIA
DOE stated that lateral dissolution results from groundwater movement within units that lead to lateral variations in porosity and permeability. The CCA stated that lateral dissolution of the upper Saiado and within the Rustler in the Region ofthe WIPP has been recognized and studied since at least 1970 (Appendix DEF.3.2, p. DEF-25). DOE stated that lateral dissolution ofthe upper Saiado (and the subsequent collapse ofthe overlying Rustler) formed Nash Draw, located approximately 1 to 5 miles (1.6 to 8 kilometers) west ofthe WIPP site. DOE stated that the maximum eastward lateral extent of dissolution at the top ofthe Saiado is east of Livingston Ridge. DOE concluded that the edge of halite dissolution at the top ofthe Saiado will not reach the repository until well after the period of regulatory concern (Appendix DEF.3.2, p. DEF-29).
DEF.3.3, p. DEF-30). DOE stated that dissolution offracturefillwithin the Culebra would significantly impact the transmissivity of this unit. DOE stated that "there is no evidence for progressive change in this pattern [offracturefill]across the area although some dissolution and precipitation of gypsum asfractureinfills will inevitably occur in the next 10,000 years." DOE 14-38 submitted supplemental information in letters dated June 13, 1997, May 14, 1997, March 12, 1997, February 26, 1997, February 7, 1997, and January 24, 1997 (Docket A-93-02, Items II-H44, II-I-31, II-H-22, II-I-10, II-I-07 and II-I-03, respectively) concerning fracture fill dissolution. These letters were sent in response to both questions raised in EPA's December 19, 1996 letter (Docket.A-93-02, Item II-I-Ol) requesting additional information and public comments on EPA's Advance Notice of Proposed Rulemaking for the certification decision. DOE concluded that the possibility of fracture fill dissolution is very low because infiltrating waters that would cause the dissolution would be saturated with respect to calcium sulfate. Because infiltrating water is saturated with fracture fill mineral, the likelihood that these waters could dissolve and remove existing fracture fill is remote.
EPA's review identified questions about karst, shallow dissolution, and breccia pipe development. These questions were transmitted to DOE in an EPA letter dated December 19, 1996 (Docket A-93-02, Item II-I-Ol) and are discussed in greater detail in Section IV.B.3 of
EPA Technical Support Document for Section 194.14: Content of Compliance Certification Application (EPA 1998a). DOE submitted supplemental information in a letter dated January 24, 1997 (Enclosure 2, p. 7, Docket A-93-02, Item II-I-03) regarding non-Capitan related breccia pipes (i.e., those associated with the Bell Canyon where it is relatively shallow). EPA reviewed this information and concurred that the geologic evidence indicates that the breccia pipes are not likely to occur under the repository. EPA also concluded that the marker beds ofthe Saiado contain brine that has limited ability to dissolve additional halite, and these marker beds, while more permeable than the halite, exhibit very low permeabilities. EPA also concluded that deep, lateral, and shallow dissolution pathways will not serve as significant potential radionuclide pathways and that the potential for significantfracturefilldissolution during the regulatory time period is low.
New Mexico. 1978. (CCA Reference #12) Bachman. Cenozoic Deposits of Southeastern New Mexico and an Outline ofthe History of Evaporite Dissolution. U.S. Geological Survey Journal of Research, vol. 4, no. 2, pp. 135-149. 1976. (CCA Reference #22) Bachman. Karst in Evaporites in Southeastern New Mexico, SAND86-7078. Sandia National
Laboratories. 1987. (CCA Reference #27) Borns et al. Deformation of Evaporites Near the Waste Isolation Pilot Plant (WIPP) Site, SAND82-1069. Sandia National Laboratories. 1983. (CCA Reference #79)
DOE 1992. U.S. Department of Energy. Preliminary Performance Assessment for the Waste Isolation Pilot Plant, SAND 92-0700/1-5. Sandia National Laboratories. December 1992. (CCA Reference #563)
DOE 1995a. U.S. Department of Energy. Waste Isolation Pilot Plant Safety Analysis Report.
DOE/WIPP/95-2065, Revision 0. November 1995. (CCA Reference #202)
DOE 1995b. U.S. Department of Energy. Transuranic Waste Characterization Quality Assurance Program Plan, Revision 0, DOE/CAO-94-1010. April 30, 1995. (CCA Reference #201)
DOE 1995c. U.S. Department of Energy. Summary of Brine Investigation at the Waste Isolation Pilot Plant, Southeastern New Mexico, DOE/WIPP 96-2161.. 1995.
DOE 1996. U.S. Department of Energy. Waste Acceptance Criteria for the Waste Isolation Pilot
Plant, Revision 5, DOE/WIPP-96-069. April 1996. (CCA Reference #208)
DOE 1997a. U.S. Department of Energy. Chemical Conditions Model: Results ofthe MgO Backfill Efficacy Investigation. Prepared for the U.S. DOE Carlsbad Area Office by Sandia National Laboratories. April 23, 1997. (Docket A-93-02, Item II-A-39)
DOE 1997b. U.S. Department of Energy. Summary of EPA-Mandated Performance Assessment Verification Test (Replicate 1) and Comparison with Compliance Certification Application Calculations. July 25, 1997. (Docket A-93-02, Item II-G-26)
DOE 1997c. U.S. Department of Energy. Summary of EPA-Mandated Performance Assessment Verification Test (All Replicates) and Comparison with Compliance Certification Application Calculations, WPO# 46702. August 8, 1997. (Docket A-93-02, Item II-G28) 14-68 P.79 Environmental Evaluation Group (EEG). Stable Isotopes in Southeastern New Mexico Groundwater: Implications for Dating Recharge in the WIPP Area, EEG-35. (CCA Reference #118) Environmental Evaluation Group (EEG). Chemical and Radiochemical Characteristics of Groundwater in the Culebra Dolomite, Southeastern New Mexico, EEG-39. (CCA Reference #119)
EPA 1998d. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Parameter Report. 1997. (Docket A-93-02, Item V-B-12)
EPA 1998e. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Parameter Justification Report. 1997. (Docket A-93-02, Item V-B-14)
EPA 1998f. U.S. Environmental Protection Agency. Technical Support Document for Section 194.32: Fluid Injection Analysis. 1997. (Docket A-93-02, Item V-B-22)
EPA 1998g. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Models and Computer Codes. (Docket A-93-02, Item V-B-6)
EPA 1998h. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Review of TDEM Analysis of WIPP Brine Pockets. (Docket A-93-02, Item VB-30)
EPA 1998i. U.S. Environmental Protection Agency. Technical Support Document for Section 194.23: Ground-Water Flow and Contaminant Transport Modeling at WIPP (Docket A93-02, Item V-B-7)
EPA 1998j. U.S. Environmental Protection Agency. Response to Comments Document for the Criteria for the Certification and Recertification ofthe Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 91 Disposal Regulations: Certification Decision. (Docket A-93-02, Item V-C-1)
Mexico, January 1988. (CCA Appendix FAC) 14-69 P.80
Holt, R.M., and D.W. Powers. Geologic Mapping ofthe Air Intake Shaft at the Waste Isolation Pilot Plant, DOE/WIPP 90-051. Westinghouse Electric Corportation. 1990. (CCA Reference #311) ..^^M
Jones, T.L., V.A. Kelley, J.F. Pickens, D.T. Upton, R.L. Beauheim, and P.B. Davies. Integration of Interpretation Results of Tracer Tests Performed in the Culebra Dolomite at the Waste Isolation Pilot Plant Site, SAND92-1579. Sandia National Laboratories. 1992. (CCA Reference #343) Lambert and Harvey. Stable-Isotope Geochemistry of Groundwaters In the Delaware Basin of Southeastern New Mexico, SAND87-0138. Sandia National Laboratories. 1987. (CCA Reference #378)
NMBMMR 1995. New Mexico Bureau of Mines and Mineral Resources. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site, Final Report. 1995. (CCA Reference #460)
Powers, D.W., J.M. Sigda, and R.M. Holt. Probability of Intercepting a Pressurized Brine Reservoir under the WIPP, Unpublished Report. Sandia National Laboratories. July 10, 1996. (CCA Reference #516)
Popielak, R.S., R.L. Beauheim, S.R. Black, W.E. Coons, CT. Ellingson, and R.L. Olsen. Brine Reservoirs in the Castile Formation, Waste Isolation Pilot Plant (WIPP) Project, Southeastern New Mexico, TME 3153. 1983. (CCA Reference #511)
Slemmons, D. B., E.R. Engdahl, Mark D. Zoback, and David D. Blackwell, Eds. Neotectonics of North America. Geological Society of America. 1991. (CCA Reference #595)
WEC 1991. Westinghouse Electric Corportation. Waste Isolation Pilot Plant Site Environmental Report for Calendar Year 1990, DOE/WIPP 91-008. 1991. (CCA Reference #690)
WEC 1992. Westinghouse Electric Corporation. Waste Isolation Pilot Plant Site Environmental Report for Calendar Year 1991, DOE/WIPP 92-007. 1992. (CCA Reference #191)
WEC 1993. Westinghouse Electric Corporation. Waste Isolation Pilot Plant Site Environmental Report for Calendar Year 1992, DOE/WIPP 93-017. 1993. (CCA Reference #192)
WEC 1994. Westinghouse Electric Corporation. Waste Isolation Pilot Plant Site Environmental Report for Calendar Year 1993, DOE/WIPP 94-2033. 1994. (CCA Reference #691)
WEC 1995. Westinghouse Electric Corporation. Waste Isolation Pilot Plant Site Environmental Report for Calendar Year 1994, DOE/WIPP 95-2094. 1995. (CCA Reference #692) 14-70 > |^B P.81
DOE response to EPA's letter of December 19, 1996 requesting additional CCA documentation. Dated January 17, 1997. Docket A-93-02, Item II-I-02. Supplemental information for the Compliance Certification Application (CCA) includes the following: Response to EPA Comments. Enclosure 1: a. 194.23(a)(1) Models and Computer Codes b. 194.23(a)(2) Models and Computer Codes c. 194.32(c)Scope of Performance Response to EPA Comments. Enclosure 2 a. 194.32(a) Scope of Performance
DOE second response package to EPA's letter of December 19, 1996. Dated January 24, 1997. Docket A-93-02, Item II-I-03. Supplemental Information for the CCA includes the following: Response to EPA Comments Enclosure 1 a. 194.14(a)(3) Content of Compliance Certification Application b. 194.22(a)(2)(iii) Quality Assurance c. 194.23(a)(3)(i) Models and Computer Codes Response to EPA Comments Enclosure 2 a. 194.23(a)(1) Models and Computer Codes b. 194.32(e)(3) Scope of Performance c. 194.33(c)(1) Consideration for drilling events in PA d. 194.53 Consideration of underground sources of drinking water
DOE letter dated January 21,1997 (Docket A-93-02, Item II-I-05) transmitting a supplement to Appendix EPIC to the CCA. The supplement is entitled, "DOE report on Effectiveness of Passive Institutional Controls in Reducing Inadvertent Human Intrusion into the WIPP," WIPP/CAO-96-3168, Revision 1, November 14, 1996 with Addendum of December 6, 1996 (Docket A-93-02, Item II-G-16).
DOE third response package to EPA's letter of December 19, 1996. Dated February 7, 1997. Docket A-93-02, Item II-I-07. Supplemental Information for the CCA includes the following: 14-71 P.82 Response to EPA Comments. Enclosure 1 a. 194.23(a)(2) Models and Computer Codes b. 194.24(a) Waste Characterization c. 194.41(a) Active Institutional Control Response to EPA Comments. Enclosure 2 a. 194.23(a)(1) & 194.23(a)(2)
DOE fourth response package to EPA's letter December 19, 1996. Dated February 14, 1997. Docket A-93-02, Item II-I-08. Supplemental information for the CCA includes the following: Response to EPA Comments . Enclosure 1: a. 194.14(a)(2) Content of Compliance Certification b. 194.23(c) Models and Computer Codes c. 194.23(c)(2) Models and Computer Codes d. 194.23(c)(3) Models and Computer Codes e. 194.23(c)(6) Models and Computer Codes f. 194.32(a) Scope of Performance Assessment g. 194.32(e) Scope of Performance Assessment