Examples of Compiled Alternative Closure Documents from CCR Internet Sites
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
References: 8 extracted, 0 linked to papers
GHBLP, Annual Groundwater Monitoring & Corrective Action Report, prepared by Golder Associates Inc., dared January 2019
USEPA (US Environmental Protection Agency). 2015. Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. 40 CFR Part 257. Effective Date October 19, 2015, amended July 2018. Golder and the G logo are trademarks of Golder Associates Corporation p:\17x-projects\1789024 ghblp units 1&2\200 reports\no alternate disposal capacity\ghblp ccr surface impoundment no alt disposal capacity - final.docx
HARBOR ISLAND DRIVE GRAND HAVEN, MI YYYY-MM-DD 2017-03-20
REV. FIGURE Last Edited By: jschmuecker Date: 2017-03-20 Time:11:03:07 AM | Printed By: JSchmuecker Date: 2017-03-20 Time:11:03:18 AM Path: \\lansing\CAD\Projects\17x-Projects\1775461_Grand Haven BWL\PRODUCTION\A-CCR RULE COMPLIANCE\ | File Name: 1775461A001.dwg
GVEA has been evaluating and testing alternative disposal options for managing Unit 1 coal ash and has determined that the preferred alternative is to convey coal ash from Unit 1 plant and combine it with the Unit 2 coal ash system. From the Unit 2 coal ash system, bottom/slag ash and fly ash are transferred to separate intermediate storage silos that are used to load the coal ash directly into trucks in an enclosed bay for transport and final disposal at the Usibelli Coal Mine. Some conveyance piping and equipment is currently in place to convey Unit 1 coal ash to the Unit 2 coal ash system and it has been tested in concept for a small scale pilot test. Additional work remains to design, complete , and operate the new system ; including complete design of the new system followed by installation of additional conveyance components and control systems. Full commissioning of the new system will include conducting additional tests to confirm adequate flows rates and pressures. Title 40 of the Code of Federal Regulations Parts 257 and 261 (40 CFR 257 and 261) dated Apri l 17, 2015
GVEA Healy Power Plant Alternative Closure Notification July 30, 2018
SCGENCO Williams Station FGD Pond Operating Record Placement: April 17, 2019
BERKELEY COUNTY, SOUTH CAROLINA MAY 2020 DOMINION ENERGY SOUTH CAROLINA WILLIAMS STATION FGD POND