Documentation for EPA Base Case v 5.13 Using the Integrated Planning Model
Other documents for the same rulemaking (all, by stage)
References
APC shall not sell, trade, or otherwise exchange any Plant Miller excess SO2 emission allowances outside of the APC system 1/1/21 1) Settlement requires 95% removal efficiency for SO2 or 90% in the event that the unit combust a http://www2. coal with sulfur content greater than epa.gov/enfo 1% by weight. 2) The settlements rcement/alab require APC to retire $4,900,000 of ama-powerSO2 emission allowances within 45 companydays of consent decree entry. 3) clean-air-actEPA assumed a retirement of 7, settlement 538 SO2 allowances based on a current allowance price of $650. Minnkota Power Cooperative Beginning 1/01/2006, Minnkota shall not emit more than 31,000 tons of SO2/year, no more than 26,000 tons beginning 2011, no more than 11,500 tons beginning 1/01/2012. If Unit 3 is not operational by 12/31/2015, then beginning 1/01/2014, the plant wide emission shall not exceed 8,500. Unit 1 Install and continuously operate FGD North Dakota Unit 2 Design, upgrade, and continuously operate FGD Indiana Unit 1 North Dakota 95% if wet
Milton R. Young Before 2008 Plant will surrender 4,346 allowances for each year 2012 –
WEPCO WEPCO shall comply with the following system wide average NOx emission rates and total NOx tonnage permissible: by 1/1/2005 an emission rate of 0.27 and 31,500 tons, by 1/1/2007 an emission rate of 0.19 and 23,400 tons, and by 1/1/2013 an emission rate of 0.17 and 17, 400 tons. For SO2 emissions, WEPCO will comply with: by 1/1/2005 an emission rate of 0.76 and 86,900 tons, by 1/1/2007 an emission rate of 0.61 and 74,400 tons, by 1/1/2008 an emission rate of 0.45 and 55,400 tons, and by 1/1/2013 an emission rate of 0.32 and 33,300 tons. Wisconsin Presque Isle Pleasant Prairie Units Retire or install SO2 and NOx controls 12/31/12 Install and continuously operate FGD (or approved equiv. tech) 95% or 0.1 12/31/12 Install SCR (or approved tech) and continually operate 12/31/12 Wisconsin Units 5, 6 Install and operate low NOx burners 12/31/03 Wisconsin Units 7, 8 Operate existing low NOx burners 12/31/05 Install Baghouse Wisconsin Unit 9 Operate existing low NOx burners 12/31/06 Install Baghouse Wisconsin Unit 1 Install and continuously operate FGD (or approved control tech) 95% or 0.1 12/31/06 Install and
VEPCO The Total Permissible NOx Emissions (in tons) from VEPCO system are: 104,000 in 2003, 95,000 in 2004, 90,000 in 2005, 83,000 in 2006, 81,000 in 2007, 63,000 in 2008 – 2010, 54,000 in 2011, 50,000 in 2012, and 30,250 each year thereafter. Beginning 1/1/2013 they will have a system wide emission rate no greater than 0.15 lbs/mmBTU. Mount Storm West Virginia Units Construct or improve FGD 95% or 0.15 01/01/05 Install and continuously operate SCR 0.11 01/01/08 Install and continuously operate SCR 01/01/13 Virginia Unit 4 Virginia Unit 5 Construct or improve FGD 95% or 0.13 10/12/12 Install and continuously operate SCR 01/01/12 Virginia Unit 6 Construct or improve FGD 95% or 0.13 01/01/10 Install and continuously operate SCR 01/01/11 Chesapeake Energy Virginia Units 3, 4
OHIO EDISON Ohio Edison shall achieve reductions of 2,483 tons NOx between 7/1/2005 and 12/31/2010 using any combination of: 1) low sulfur coal at Burger Units 4 and 5, 2) operating SCRs currently installed at Mansfield Units 1 – 3 during the months of October through April, and/or 3) emitting fewer tons than the Plant-Wide Annual Cap for NOx required for the Sammis Plant. Ohio Edison must reduce 24,600 tons system-wide of SO2 by 12/31/2010. No later than 8/11/2005, Ohio Edison shall install and operate low NOx burners on Sammis Units 1, 2,4,5,6, and 7 and overfired air on Sammis Units 1,2,3,6, and 7. No later than 12/1/2005, Ohio Edison shall install advanced combustion control optimization with software to minimize NOx emissions from Sammis Units 1 – 5. Ohio Unit 1 Install Induct Scrubber (or approved equiv. control tech) Ohio Unit 2 Install Induct Scrubber (or approved equiv. control tech) Ohio Unit 3 Install Induct Scrubber (or approved equiv. control tech) 50% removal or 1.1 12/31/08 lbs/mmBTU Operate low NOx burners and overfire air by 12/1/05; install
OR Retire by 12/31/2010 MIRANT 1,6 System-wide NOx Emission Annual Caps: 36,500 tons 2004; 33,840 tons 2005; 33,090 tons 2006; 28,920 tons 2007; 22,000 tons 2008; 19,650 tons 2009; 16,000 tons 2010 onward. System-wide NOx Emission Ozone Season Caps: 14,700 tons 2004; 13,340 tons 2005; 12,590 tons 2006; 10,190 tons 2007; 6,150 tons 2008 – 2009; 5,200 tons 2010 thereafter. Beginning on 5/1/2008, and continuing for each and every Ozone Season thereafter, the Mirant System shall not exceed a System-wide Ozone Season Emission Rate of 0.150 lbs/mmBTU NOx. Potomac River Plant Virginia Unit 1 Virginia Unit 2 Virginia Unit 3 Install low NOx burners (or more effective tech) & operate continuously 05/01/04 Virginia Unit 4 Install low NOx burners (or more effective tech) & operate continuously 05/01/04 3-52 Settlement requires installation of Separated Overfire Air tech (or more effective technology) by 5/1/2005. Plant-wide Ozone Season NO x Caps: 1,750 tons 2004; 1,625 tons 2005; 1,600 tons 2006 – 2009; 1,475 tons 2010 thereafter. Plant-wide annual NOx Caps are 3,700 tons in 2005 and each year thereafter. http://www2. epa.gov/enfo rcement/mira nt-clean-airsettlement Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Rate NOx Control Effective Date Equipment Rate
FGD by 6/1/2010 if authorized by court to reject ownership interest in Morgantown Plant, or by no later than 36 months after they lose ownership interest of the Morgantown Plant. [Installed]
ILLINOIS POWER System-wide NOx Emission Annual Caps: 15,000 tons 2005; 14,000 tons 2006; 13,800 tons 2007 onward. System-wide SO2 Emission Annual Caps: 66,300 tons 2005 – 2006; 65,000 tons 2007; 62,000 tons 2008 – 2010; 57,000 tons 2011; 49,500 tons 2012; 29,000 tons 2013 onward. Illinois Baldwin Illinois Illinois Havana Illinois Unit 1 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 2 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA & existing SCR continuously Unit 3 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA and/or low NOx burners 0.12 until 12/30/12; from 12/31/12 Unit 6 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously lbs/mmBTU until 12/30/2012;
EW Brown Generating Station State Unit Kentucky Unit 3 Action Effective Date SO2 control Equipment Install FGD Percent Removal or Rate NOx Control Effective Date 97% or 0.100 12/31/10 Equipment Install and continuously operate SCR by 12/31/2012, continuously operate low NOx boiler and OFA. Rate 0.07
KU must surrender SO2 and NOx 53,000 SO2 allowances may not be allowances of 2008 used for compliance, or earlier vintage by and emissions 12/31/10 March 1, 2009. All decreases for purposes
LNB by continuous Install and 0.32 prior to New FGD 06/01/200 operation of continuously 95% or 0.08 installed by 9, SCR by existing FGDs operate low NOx installation, 06/01/201 1/1/2012 on both units, burner and SCR 0.080 after install new
FGD. Coronado Generating Station Arizona Unit 1 or Unit 2 Install new 95% or 0.08 01/01/13 Install and continuously operate low NOx burner 0.32 Optimization continuous operation of existing ESPs. 06/01/11 http://www2. epa.gov/enfo rcement/saltAnnual plant-wide NOx cap is 7,300 river-projecttons after 6/1/2014. agricultureimprovement -and-powerdistrictsettlement American Electric Power Annual Cap (tons) 145,000 113,000 Eastern System-Wide [Modified Limits for SO2] 110,000 102,000 94,000 Annual Cap (tons) 450,000 Eastern System-Wide 450,000 420,000 350,000 Year 2016-2018 http://www.ct. gov/ag/lib/ag/ press_releas es/2013/201 30225_aep_ cdmod.pdf 2019-2021 2022-2025 2026-2028 2029 and thereafter Year 2010 2011 2012 2013 Annual Cap (tons) 96,000 92,500 92,500 85,000 NOx and SO2 allowances may not be NOx and SO2 used to comply with allowances that any of the limits would have been imposed by the made available by Consent Decree. The emission reductions Consent Decree pursuant to the includes formula for Consent Decree must be surrendered. calculating excess NO x allowances relative to the CAIR Allocations, Year 2009 2010 2011 2012 3-55 http://www2. epa.gov/enfo rcement/ame rican-electricpowerservicecorporation Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Rate 340,000 2015 60,000 2016 35,000 174,000 Clinch River Rate 85,000 85,000 75,000 2017 72,000
PM or Mercury Control Effective Date Equipment Rate Effective Date 2013 2014 2015 2016 and thereafter 2018 2019 and thereafter West Virginia Sporn Virginia Clinch River Indiana Tanners Creek West Virginia Kammer
PM or Mercury Control Effective Date Equipment Rate Effective Date Allowance Retirement Allowance Restriction Retirement Restriction Effective Date Notes Reference Rockport Units 1 & 2 shall not exceed an Annual Tonnage Limit of 28 MTons of SO2 in 2016- 2017, 26 Mtons in 2018-2019, 22 MTons in 2020-2025, 18 MTons in 2026-2028 and 10 MTons in 2029 and each year thereafter. Indiana Unit 1 Install DSI Install and continuously operate FGD 4/16/2015 12/31/2025 Install and continuously operate SCR 12/31/25 Indiana Unit 2 Install DSI Install and continuously operate FGD 4/16/2015
EKPC may choose to retire Dale 3 and 4 in lieu 12/31/2012 of installing controls in
FGD for 90% removal and update FGD for 98% removal by 2012 2012 Unit 2 Continuously run current
FGD for 90% removal and update FGD for 98% removal by 2014 Unit Action Effective Date Indiana Equipment Equipment Rate
Retire, refuel or repower as natural 0.750 lbs/mmBTU 6/1/2015 1/1/2013 0.250 lbs/mmBTU & plantwide cap of 12/31/12 1500 tons starting 2016 Wisconsin Units 7-8 0.750 lbs/mmBTU & plant-wide cap of 2100 tons starting 2016 Wisconsin Unit 1 0.750 lbs/mmBTU 1/1/2013 until retirement 0.250 lbs/mmBTU 12/31/201 2 until retirement Wisconsin Units 2 0.750 lbs/mmBTU 1/1/2013 until retirement 0.280 lbs/mmBTU 12/31/201
Allowances, may buy external http://www2. allowances to comply. epa.gov/enfo “Commencing January 1, 2013, and rcement/louis continuing thereafter, Settling ianaDefendant shall burn only coal with generatingno greater sulfur content than 0.45 settlement percent by weight on a dry basis at Big Cajun II Units 1 and 3. “ install and Continuously 0.030 0.135 Continuously 05/01/14 Operate lbs/mmBT 04/15/15 lbs/mmBTU Operate SNCR each ESP Unit 3 Dairyland Power Cooperative Dairyland Power Cooperative shall not exceed an Annual Plant-wide Tonnage Limitation of 6800 tons of NOx in calendar years 2016, 3700 tons 2017-2019, and 3200 tons in 2020 and thereafter; and an Annual Plant-wide Tonnage Limitation of 6070 tons of SO2 in 2016, 6060 tons 2017-2019 and 4580 tons in 2020 and thereafter. Alma Wisconsin Unit 1 Cease 06/30/12 Burning Coal Unit 2 Cease 06/30/12 Burning Coal Unit 3 Cease 06/30/12 Burning Coal Unit 4 Option 2: Retrofit and Regulate both units more stringently Unit 5 12/31/14 0.030 lbs/mmBT 0.350 U [with lbs/mmBTU 1.00
SCR, OFA, and lbs/mmBTU Install/Contin 2013] uously 06/01/13 Operate a 0.01 Continuously Baghouse 0.280 lbs/mmBT Operate the LNB 05/02/13 lbs/mmBTU U [PM and OFA post-2013] 07/01/13 0.015 lbs/mmBT U [PM by Continuously
PM Control Effective Date Equipment Rate Mercury Control Effective Date Equipment Rate Effective Date Notes If the MPC project is discontinued at Greenidge Unit 4 by 12/31/2009, Unit 4 will be subject to the following SO2 emission caps: 2005 will be 12,125 tons, 2006 will be 11,800 tons, 2007 will be 11,475 tons, 2008 will be 11,150 tons, 2009 will be 10,825 tons. By 12/31/2009, AES shall control, repower, or cease operations at Westover Unit 7. Beginning in 2005, Unit 8 will be subject to the following SO2 emission caps: 2005 is 9500 tons, 2006 is 9250, 2007 is 9000, 2008 is 8750, 2009 is 8500 tons. http://investor.aes.com/phoenix.zhtml?c= 202639&p=irolnewsArticle&ID=1274075&highlight= Update: as of May 2009, CONSOL and AES describe the Greenidge Unit 4 MPC effort as a success. New York Unit 4 Greenidge Install FGD New York Unit 3 Install