Policy Replication

Documentation for EPA Base Case v.5.13 Using the Integrated Planning Model

Docket document2022-04-06 · EPA · publication · EPA-HQ-OAR-2021-0668-0088
RIN 2060-AW47, RIN 2060-AV51, RIN 2060-AW09, RIN 2060-AW30 · Docket EPA-HQ-OAR-2021-0668

Other documents for the same rulemaking

2022-02-22 Docket documentAir Quality Modeling Technical Support Document 2015 Ozone National Ambient Air Quality Standards Transport SIP Proposed Actions
2022-02-22 Docket documentTechnical Support Document (TSD), Preparation of Emissions Inventories for the 2016v2 North American Emissions Modeling Platform
2022-02-22 Docket documentAir Quality Modeling TSD for the Final Revised Cross-State Air Pollution Rule Update
2022-02-22 Docket documentTechnical Support Document (TSD), Preparation of Emissions Inventories for the 2016v1 North American Emissions Modeling Platform
2022-02-22 Docket documentMeteorological Modeling for 2016
2022-04-06 Regulatory impact analysisRegulatory Impact Analysis for Proposed Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Ozone National Ambient Air Quality Standard
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart BBBBB (RLSO)
2022-04-06 Docket documentNonEGU Emissions Reductions PPB Impacts for the 2015 Ozone Transport FIP Final Memorandum
2022-04-06 Docket documentSummaries of point source emissions used in air quality modeling
2022-04-06 Docket documentPolicy Assessment for the Review of the Ozone National Ambient Air Quality Standards
2022-04-06 Docket documentAP-42, Compilation of Air Pollutant Emission Factors, Volume 1 Chapter 1, Section 1.3, Fuel Oil Combustion
2022-04-06 Docket documentAP-42, Compilation of Air Pollutant Emission Factors, Chapter 2, Section 2.1, Refuse Combustion
2022-04-06 Docket documentMidwest Regional Planning Organization (RPO) Identification and Evaluation of Candidate Control Measures
2022-04-06 Docket documentNon-EGU Applicability Requirements versus Results from Non-EGU Screening Assessment for 2026
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart DDDDD (RLSO)
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart AAAAA (RLSO)
2022-04-06 Docket documentEnvironmental Justice Ozone Exposure Analysis Files
2022-04-06 Docket documentEJSCREEN Environmental Justice Mapping and Screening Tool
2022-04-06 Docket document2019 Power Sector Programs - Progress Report
2022-04-06 Docket documentAnnual state and county summaries of emissions used in air quality modeling
2022-04-06 Docket documentTypical Installation Timelines for NOx Emissions Control Technologies on Industrial Sources
2022-04-06 Docket documentOzone Transport Commission - Municipal Waste Combustor Workgroup Report
2022-04-06 Docket documentAP 42 Compilation of Air Pollutant Emission Factors, Chapter 11, Mineral Products Industry, Section 11.23, Taconite Ore Processing, Final Section – Supplement C
2022-04-06 Docket documentComment on LNB Installation
2022-04-06 Docket documentTypical SCR and SNCR Schedule (Coal or Oil Gas Boilers)
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart CCCCC (RLSO)
2022-04-06 Docket document2020 Power Sector Programs Progress Report
2022-04-06 Docket documentDiscussion of Short-term Emission Limits
2022-04-06 Docket documentMemorandum from EPA OAQPS Director to EPA Regional air Division Directors regarding the analysis of contribution Thresholds for Use in Clean Air Act Section 110(a)(2)(D)(i)(I) Interstate Transport State Implementation Plan Submissions For the 2015 Ozone National Ambient Air Quality Standards
2022-04-06 Docket documentData and Results for the Monetized Health Benefits Analysis for Ozone
2022-04-06 Docket documentEmissions Inventory Projection and Control Factors for Future Years and their Impacts
2022-04-06 Docket documentIntegrated Science Assessment for Ozone and Related Photochemical Oxidants (2020)
2022-04-06 Docket document2022 Labor Methodology update
2022-04-06 Docket documentAgricultural Resources and Environmental Indicators
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart FFFFF (RLSO)
2022-04-06 Docket documentBig Bend's Multi-Unit SCR Retrofit
2022-04-06 Docket documentTechnical Information Oil and Gas Sector Significant Stationary Sources of NOx Emissions
2022-04-06 Docket documentDigital Government Building a 21st Century Platform to Better Serve the America Website
2022-04-06 Docket documentSIP Revision Incorporating 6 NYCRR Subpart 227-3, Ozone Season NOx Emission Limits for Simple Cycle and Regenerative Combustion Turbines
2022-04-06 Docket documentFinal Report: Engineering and Economic Factors Affecting the Installation of Control Technologies for Multipollutant Strategies
2022-04-06 Docket documentProposed amendments to 40 CFR part 52 (RLSO)
2022-04-06 Docket documentRTR Environmental Justice (EJ) Risk and Proximity Analysis Tool User's Guide
2022-04-06 Docket documentAnalysis of Demographic Factors For Populations Living Near EGU and Non-EGU Facilities for the Federal Implementation Plan Addressing Regional Ozone Transport for the 2015 Ozone National Ambient Air Quality Standards
2022-04-06 Docket documentIPM Model – Updates to Cost and Performance for APC Technologies SCR Cost Development Methodology for Oil/Gas-fired Boilers, Final (Aug 2021)
2022-04-06 Docket documentAnalysis of Ozone Season NOX Emissions Data for Coal-Fired EGUs in Four Mid-Atlantic States (Docket #: EPA-HQ-OAR-2020-0351-0004)
2022-04-06 Docket documentApplicability and Feasibility of NOx, SO2, and PM Emission Control Technologies for Industrial, Commercial, and Institutional Boilers (November, 2008, with January, 2009 revision)
2022-04-06 Docket documentMenu of Control Measures
2022-04-06 Docket documentOTC Regulatory and Technical Guideline for Control of Nitrogen Oxides (NOx) Emissions from Natural Gas Pipeline Compressor Fuel‐Fired Prime Movers: Analysis of Technical Feasibility and Cost Effectiveness
2022-04-06 Docket document2016v2 AQ Modeling Data
2022-04-06 Docket documentProposed amendments to 40 CFR part 78 (RLSO)
2022-04-06 Docket documentGas-Fired SNCR Cost Methodology
2022-04-06 Docket documentFeasibility of Installing NOx Control Technologies EPA-HQ-OAR-2001-0008-0125 content
2022-04-06 Docket documentInterim White Paper - Midwest RPO Candidate Control Measures - Source Category: Glass Manufacturing
2022-04-06 Docket documentAP-42, Compilation of Air Pollutant Emission Factors, Volume 1, Appendix A, Miscellaneous Data and Conversion Factors
2022-04-06 Docket documentProposed amendments to 40 CFR part 97 subpart EEEEE (RLSO)
2022-04-06 Docket documentAvailable and Emerging Technologies for Reducing Greenhouse Gas Emissions from the Iron and Steel Industry
2022-04-06 Docket documentProposed amendments to 40 CFR part 75 (RLSO)
2022-04-06 Docket documentIPM Model - Updates to Cost and Performance for APC Technologies SCR Cost Development Methodology for Coal-fired Boilers (Feb 2022)
2022-04-06 Docket documentIPM Model – Updates to Cost and Performance for APC Technologies SNCR Cost Development Methodology for Coal-fired Boilers (Aug 2021)
2022-04-06 Docket document2018 Power Sector Programs - Progress Report

References

Page 1Download these results: CSV · JSON
APC shall not sell, trade, or otherwise exchange any Plant Miller excess SO2 emission allowances outside of the APC system 1/1/21 1) Settlement requires 95% removal efficiency for SO2 or 90% in the event that the unit combust a http://www2. coal with sulfur content greater than epa.gov/enfo 1% by weight. 2) The settlements rcement/alab require APC to retire $4,900,000 of ama-powerSO2 emission allowances within 45 companydays of consent decree entry. 3) clean-air-actEPA assumed a retirement of 7, settlement 538 SO2 allowances based on a current allowance price of $650. Minnkota Power Cooperative Beginning 1/01/2006, Minnkota shall not emit more than 31,000 tons of SO2/year, no more than 26,000 tons beginning 2011, no more than 11,500 tons beginning 1/01/2012. If Unit 3 is not operational by 12/31/2015, then beginning 1/01/2014, the plant wide emission shall not exceed 8,500. Unit 1 Install and continuously operate FGD North Dakota Unit 2 Design, upgrade, and continuously operate FGD Indiana Unit 1 North Dakota 95% if wet
research reportNot linked to a paper · refsec · cited link
Milton R. Young Before 2008 Plant will surrender 4,346 allowances for each year 2012 –
research reportNot linked to a paper · refsec
WEPCO WEPCO shall comply with the following system wide average NOx emission rates and total NOx tonnage permissible: by 1/1/2005 an emission rate of 0.27 and 31,500 tons, by 1/1/2007 an emission rate of 0.19 and 23,400 tons, and by 1/1/2013 an emission rate of 0.17 and 17, 400 tons. For SO2 emissions, WEPCO will comply with: by 1/1/2005 an emission rate of 0.76 and 86,900 tons, by 1/1/2007 an emission rate of 0.61 and 74,400 tons, by 1/1/2008 an emission rate of 0.45 and 55,400 tons, and by 1/1/2013 an emission rate of 0.32 and 33,300 tons. Wisconsin Presque Isle Pleasant Prairie Units Retire or install SO2 and NOx controls 12/31/12 Install and continuously operate FGD (or approved equiv. tech) 95% or 0.1 12/31/12 Install SCR (or approved tech) and continually operate 12/31/12 Wisconsin Units 5, 6 Install and operate low NOx burners 12/31/03 Wisconsin Units 7, 8 Operate existing low NOx burners 12/31/05 Install Baghouse Wisconsin Unit 9 Operate existing low NOx burners 12/31/06 Install Baghouse Wisconsin Unit 1 Install and continuously operate FGD (or approved control tech) 95% or 0.1 12/31/06 Install and
research reportNot linked to a paper · refsec
VEPCO The Total Permissible NOx Emissions (in tons) from VEPCO system are: 104,000 in 2003, 95,000 in 2004, 90,000 in 2005, 83,000 in 2006, 81,000 in 2007, 63,000 in 2008 – 2010, 54,000 in 2011, 50,000 in 2012, and 30,250 each year thereafter. Beginning 1/1/2013 they will have a system wide emission rate no greater than 0.15 lbs/mmBTU. Mount Storm West Virginia Units Construct or improve FGD 95% or 0.15 01/01/05 Install and continuously operate SCR 0.11 01/01/08 Install and continuously operate SCR 01/01/13 Virginia Unit 4 Virginia Unit 5 Construct or improve FGD 95% or 0.13 10/12/12 Install and continuously operate SCR 01/01/12 Virginia Unit 6 Construct or improve FGD 95% or 0.13 01/01/10 Install and continuously operate SCR 01/01/11 Chesapeake Energy Virginia Units 3, 4
research reportNot linked to a paper · refsec
OHIO EDISON Ohio Edison shall achieve reductions of 2,483 tons NOx between 7/1/2005 and 12/31/2010 using any combination of: 1) low sulfur coal at Burger Units 4 and 5, 2) operating SCRs currently installed at Mansfield Units 1 – 3 during the months of October through April, and/or 3) emitting fewer tons than the Plant-Wide Annual Cap for NOx required for the Sammis Plant. Ohio Edison must reduce 24,600 tons system-wide of SO2 by 12/31/2010. No later than 8/11/2005, Ohio Edison shall install and operate low NOx burners on Sammis Units 1, 2,4,5,6, and 7 and overfired air on Sammis Units 1,2,3,6, and 7. No later than 12/1/2005, Ohio Edison shall install advanced combustion control optimization with software to minimize NOx emissions from Sammis Units 1 – 5. Ohio Unit 1 Install Induct Scrubber (or approved equiv. control tech) Ohio Unit 2 Install Induct Scrubber (or approved equiv. control tech) Ohio Unit 3 Install Induct Scrubber (or approved equiv. control tech) 50% removal or 1.1 12/31/08 lbs/mmBTU Operate low NOx burners and overfire air by 12/1/05; install
research reportNot linked to a paper · refsec
OR Retire by 12/31/2010 MIRANT 1,6 System-wide NOx Emission Annual Caps: 36,500 tons 2004; 33,840 tons 2005; 33,090 tons 2006; 28,920 tons 2007; 22,000 tons 2008; 19,650 tons 2009; 16,000 tons 2010 onward. System-wide NOx Emission Ozone Season Caps: 14,700 tons 2004; 13,340 tons 2005; 12,590 tons 2006; 10,190 tons 2007; 6,150 tons 2008 – 2009; 5,200 tons 2010 thereafter. Beginning on 5/1/2008, and continuing for each and every Ozone Season thereafter, the Mirant System shall not exceed a System-wide Ozone Season Emission Rate of 0.150 lbs/mmBTU NOx. Potomac River Plant Virginia Unit 1 Virginia Unit 2 Virginia Unit 3 Install low NOx burners (or more effective tech) & operate continuously 05/01/04 Virginia Unit 4 Install low NOx burners (or more effective tech) & operate continuously 05/01/04 3-52 Settlement requires installation of Separated Overfire Air tech (or more effective technology) by 5/1/2005. Plant-wide Ozone Season NO x Caps: 1,750 tons 2004; 1,625 tons 2005; 1,600 tons 2006 – 2009; 1,475 tons 2010 thereafter. Plant-wide annual NOx Caps are 3,700 tons in 2005 and each year thereafter. http://www2. epa.gov/enfo rcement/mira nt-clean-airsettlement Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Rate NOx Control Effective Date Equipment Rate
research reportNot linked to a paper · refsec · cited link
FGD by 6/1/2010 if authorized by court to reject ownership interest in Morgantown Plant, or by no later than 36 months after they lose ownership interest of the Morgantown Plant. [Installed]
research reportNot linked to a paper · refsec
ILLINOIS POWER System-wide NOx Emission Annual Caps: 15,000 tons 2005; 14,000 tons 2006; 13,800 tons 2007 onward. System-wide SO2 Emission Annual Caps: 66,300 tons 2005 – 2006; 65,000 tons 2007; 62,000 tons 2008 – 2010; 57,000 tons 2011; 49,500 tons 2012; 29,000 tons 2013 onward. Illinois Baldwin Illinois Illinois Havana Illinois Unit 1 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 2 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA & existing SCR continuously Unit 3 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA and/or low NOx burners 0.12 until 12/30/12; from 12/31/12 Unit 6 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously lbs/mmBTU until 12/30/2012;
research reportNot linked to a paper · refsec
EW Brown Generating Station State Unit Kentucky Unit 3 Action Effective Date SO2 control Equipment Install FGD Percent Removal or Rate NOx Control Effective Date 97% or 0.100 12/31/10 Equipment Install and continuously operate SCR by 12/31/2012, continuously operate low NOx boiler and OFA. Rate 0.07
research reportNot linked to a paper · refsec
KU must surrender SO2 and NOx 53,000 SO2 allowances may not be allowances of 2008 used for compliance, or earlier vintage by and emissions 12/31/10 March 1, 2009. All decreases for purposes
research reportNot linked to a paper · refsec
LNB by continuous Install and 0.32 prior to New FGD 06/01/200 operation of continuously 95% or 0.08 installed by 9, SCR by existing FGDs operate low NOx installation, 06/01/201 1/1/2012 on both units, burner and SCR 0.080 after install new
research reportNot linked to a paper · refsec
FGD. Coronado Generating Station Arizona Unit 1 or Unit 2 Install new 95% or 0.08 01/01/13 Install and continuously operate low NOx burner 0.32 Optimization continuous operation of existing ESPs. 06/01/11 http://www2. epa.gov/enfo rcement/saltAnnual plant-wide NOx cap is 7,300 river-projecttons after 6/1/2014. agricultureimprovement -and-powerdistrictsettlement American Electric Power Annual Cap (tons) 145,000 113,000 Eastern System-Wide [Modified Limits for SO2] 110,000 102,000 94,000 Annual Cap (tons) 450,000 Eastern System-Wide 450,000 420,000 350,000 Year 2016-2018 http://www.ct. gov/ag/lib/ag/ press_releas es/2013/201 30225_aep_ cdmod.pdf 2019-2021 2022-2025 2026-2028 2029 and thereafter Year 2010 2011 2012 2013 Annual Cap (tons) 96,000 92,500 92,500 85,000 NOx and SO2 allowances may not be NOx and SO2 used to comply with allowances that any of the limits would have been imposed by the made available by Consent Decree. The emission reductions Consent Decree pursuant to the includes formula for Consent Decree must be surrendered. calculating excess NO x allowances relative to the CAIR Allocations, Year 2009 2010 2011 2012 3-55 http://www2. epa.gov/enfo rcement/ame rican-electricpowerservicecorporation Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Rate 340,000 2015 60,000 2016 35,000 174,000 Clinch River Rate 85,000 85,000 75,000 2017 72,000
research reportNot linked to a paper · refsec · cited link
PM or Mercury Control Effective Date Equipment Rate Effective Date 2013 2014 2015 2016 and thereafter 2018 2019 and thereafter West Virginia Sporn Virginia Clinch River Indiana Tanners Creek West Virginia Kammer
research reportNot linked to a paper · refsec
PM or Mercury Control Effective Date Equipment Rate Effective Date Allowance Retirement Allowance Restriction Retirement Restriction Effective Date Notes Reference Rockport Units 1 & 2 shall not exceed an Annual Tonnage Limit of 28 MTons of SO2 in 2016- 2017, 26 Mtons in 2018-2019, 22 MTons in 2020-2025, 18 MTons in 2026-2028 and 10 MTons in 2029 and each year thereafter. Indiana Unit 1 Install DSI Install and continuously operate FGD 4/16/2015 12/31/2025 Install and continuously operate SCR 12/31/25 Indiana Unit 2 Install DSI Install and continuously operate FGD 4/16/2015
research reportNot linked to a paper · refsec
EKPC may choose to retire Dale 3 and 4 in lieu 12/31/2012 of installing controls in
research reportNot linked to a paper · refsec
FGD for 90% removal and update FGD for 98% removal by 2012 2012 Unit 2 Continuously run current
research reportNot linked to a paper · refsec
FGD for 90% removal and update FGD for 98% removal by 2014 Unit Action Effective Date Indiana Equipment Equipment Rate
research reportNot linked to a paper · refsec
Retire, refuel or repower as natural 0.750 lbs/mmBTU 6/1/2015 1/1/2013 0.250 lbs/mmBTU & plantwide cap of 12/31/12 1500 tons starting 2016 Wisconsin Units 7-8 0.750 lbs/mmBTU & plant-wide cap of 2100 tons starting 2016 Wisconsin Unit 1 0.750 lbs/mmBTU 1/1/2013 until retirement 0.250 lbs/mmBTU 12/31/201 2 until retirement Wisconsin Units 2 0.750 lbs/mmBTU 1/1/2013 until retirement 0.280 lbs/mmBTU 12/31/201
research reportNot linked to a paper · refsec
Allowances, may buy external http://www2. allowances to comply. epa.gov/enfo “Commencing January 1, 2013, and rcement/louis continuing thereafter, Settling ianaDefendant shall burn only coal with generatingno greater sulfur content than 0.45 settlement percent by weight on a dry basis at Big Cajun II Units 1 and 3. “ install and Continuously 0.030 0.135 Continuously 05/01/14 Operate lbs/mmBT 04/15/15 lbs/mmBTU Operate SNCR each ESP Unit 3 Dairyland Power Cooperative Dairyland Power Cooperative shall not exceed an Annual Plant-wide Tonnage Limitation of 6800 tons of NOx in calendar years 2016, 3700 tons 2017-2019, and 3200 tons in 2020 and thereafter; and an Annual Plant-wide Tonnage Limitation of 6070 tons of SO2 in 2016, 6060 tons 2017-2019 and 4580 tons in 2020 and thereafter. Alma Wisconsin Unit 1 Cease 06/30/12 Burning Coal Unit 2 Cease 06/30/12 Burning Coal Unit 3 Cease 06/30/12 Burning Coal Unit 4 Option 2: Retrofit and Regulate both units more stringently Unit 5 12/31/14 0.030 lbs/mmBT 0.350 U [with lbs/mmBTU 1.00
research reportNot linked to a paper · refsec · cited link
SCR, OFA, and lbs/mmBTU Install/Contin 2013] uously 06/01/13 Operate a 0.01 Continuously Baghouse 0.280 lbs/mmBT Operate the LNB 05/02/13 lbs/mmBTU U [PM and OFA post-2013] 07/01/13 0.015 lbs/mmBT U [PM by Continuously
research reportNot linked to a paper · refsec
PM Control Effective Date Equipment Rate Mercury Control Effective Date Equipment Rate Effective Date Notes If the MPC project is discontinued at Greenidge Unit 4 by 12/31/2009, Unit 4 will be subject to the following SO2 emission caps: 2005 will be 12,125 tons, 2006 will be 11,800 tons, 2007 will be 11,475 tons, 2008 will be 11,150 tons, 2009 will be 10,825 tons. By 12/31/2009, AES shall control, repower, or cease operations at Westover Unit 7. Beginning in 2005, Unit 8 will be subject to the following SO2 emission caps: 2005 is 9500 tons, 2006 is 9250, 2007 is 9000, 2008 is 8750, 2009 is 8500 tons. http://investor.aes.com/phoenix.zhtml?c= 202639&p=irolnewsArticle&ID=1274075&highlight= Update: as of May 2009, CONSOL and AES describe the Greenidge Unit 4 MPC effort as a success. New York Unit 4 Greenidge Install FGD New York Unit 3 Install
research reportNot linked to a paper · refsec · cited link