An Examination of the Hydropower Licensing and Federal Authorization Process
Other documents for the same rulemaking (all, by stage)
References
Loup River Public Power District. 2017. 159 FERC ¶ 62,198 Order Issuing New License. Mead Hunt (MH). 2009. Proof of Date of Service – 401 Water Quality Certification Request, Badger-Rapide Croche Hydroelectric Project. FERC Project no. 2677. Kaukauna Utilities.
Myers, Joe. 2015. “Which Countries Produce the Most Hydroelectric Power.” World Economic Forum. Accessed December 23, 2019. https://www.weforum.org/agenda/2015/10/whichcountries-produce-the-most-hydroelectric-power/. National Park Service (NPS). 2008. National Park Service comments on the Notice of Tendering of Application and Soliciting Additional Study Requests on the A-Drop Hydro Project Located on BR Lands, MT. Filed May 28, 2008. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Nebraska Department of Environmental Quality. 2013. State Water Quality Certification for the Loup River Hydroelectric Project (P-1256). January 2, 2013. New York Department of Environmental Conservation. 2011. 401 Water Quality Certification Emeryville Hydroelectric Facility DEC I.D.#6-4038-00078/00001 FERC #2850. Filed June 8, 2011. Hampshire Paper Company. Project no. 2850-015. Norwegian Ministry of Petroleum and Energy (NMPE). 2015. Facts: Energy and Water Resources in Norway. Report Y-0102/9E. https://www.regjeringen.no/contentassets/fd89d9e2c39a4ac2b9c9a95bf156089a/facts_2015_ener gy_and_water_web.pdf.
NMPE. 2019. “Energy Facts Norway: The Legal Framework.” Accessed December 29, 2019. https://energifaktanorge.no/en/regulation-of-the-energy-sector/det-juridiske-rammeverket/.
NOAA (National Oceanic Atmospheric Administration Fisheries, formally known as National Marine Fisheries Service). 2006a. Extension of Timeline for Formal Consultation Under the Endangered Species Act and under Section 305 of the Magnuson-Stevens Fisheries Conservation and Management Act – Lewis River Hydroelectric Projects (FERC No. 935), Yale (FERC No. 2071), Swift No. 1 (FERC No. 2111), and Swift No. 2 (FERC No. 2213). Filed February 10, 2006.
NOAA. 2006b. Extension of Time for Formal Consultation Under the Endangered Species Act and under Section 305 of the Magnuson-Stevens Fisheries Conservation and Management Act – Lewis River Hydroelectric Projects (FERC No. 935), Yale (FERC No. 2071), Swift No. 1 (FERC No. 2111), and Swift No. 2 (FERC No. 2213). Filed June 20, 2006.
NOAA. 2007. Biological Opinion for ESA Consultation for the Operation of PacifiCorp and Cowlitz PUD’s Lewis River Hydroelectric Projects (Merwin (Project no. 935 Swift No. 1 (Project no. 2111) Swift No. 2 (Project no. 2213) Yale (Project no. 2071)). Filed August 27, 2007. Ohio Environmental Protection Agency (Ohio EPA). 2012. Incomplete Section 401 Water Quality Certification Application for RC Byrd Hydropower Project. January 4, 2012.
Ohio EPA. 2013. Submission of Additional Information, Re: Section 401 Certification Decision. February 6, 2013. PacifiCorp. 2004. Final Application for New License for Major Project. Received April 28, 2004. PacifiCorp. 2005. Biological Evaluation of FWS Listed, Proposed, and Candidate Species, As Related to PacifiCorp and Cowlitz PUD’s Lewis River Hydroelectric Projects. January 15, 2005. Pacific Gas and Electric Company (PG&E). 2005. Spring Gap-Stanislaus Project, FERC Project no. 2130-033 Transmittal of Draft Recreation Settlement Agreement and Clarification of Comments on Draft EIS. January 24.
PG&E. 2009. 127 FERC ¶ 62,070, Order Issuing New License. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications.
Rudberg, Peter M., Marisa Escobar, Julie Gantenbein, and Nicholas Niiro. 2015. “Mitigating the Adverse Effects of Hydropower Projects: A Comparative Review of River Restoration and Hydropower Regulation in Sweden and the United States.” Georgetown International Environmental Law Review 252 (2015): 251–73. https://www.waterpowerlaw.com/sites/default/files/team/publications/rudberg_escobar_gantenbe in_niiro_final_pdf_27-2.pdf.
Schramm, Michael P., Mark S. Bevelhimer, and Chris R. DeRolph. 2016. “A synthesis of environmental and recreational mitigation requirements at hydropower projects in the United States.” Environmental Science & Policy 61(Suppl. 3): 87–96.
Sensiba, Charles R., Michael A. Swiger, and Sharon L. White. 2018. “Deep Carbonization and Hydropower.” Environmental Law Reporter 48(4): 10309-–0333. 2018. https://www.vnf.com/webfiles/48.10309.pdf.
Sheehan, Greg. 2018. Testimony of Greg Sheehan, Principal Deputy Director, U.S. Fish and Wildlife Service, Department of the Interior before the House Committee on Energy and
Commerce, Subcommittee on Energy on Improving the Hydropower Licensing Process. June 7, 2018. https://www.doi.gov/ocl/hydropower-licensing-process. Stanford (Stanford University). 2020. “Executive Summary – U.S. Hydropower: Climate Solution and Conservation Challenge.” Stanford University Uncommon Dialogue. October 13, 2020. https://woods.stanford.edu/sites/g/files/sbiybj5821/f/hydropoweruncommon_dialogue_executive_summary.pdf.
Swaminathan, Ramya. 2017. Written Testimony of Ramya Swaminathan, CEO, Rye
Development, Before the U.S. House of Representatives Subcommittee on Energy Regarding “Modernizing Energy Infrastructure: Challenges and Opportunities to Expanding Hydropower Generation. March 15, 2017. https://energycommerce.house.gov/sites/democrats.energycommerce.house.gov/files/TestimonySwaminathan-EP-Hrg-Hydro-2017-03-15.pdf.
Swedish Environmental Protection Agency. 2017. “Swedish Environmental Law: An Introduction to the Swedish Legal System for Environmental Protection.” Report 6790 (October 2017): 1–38. http://www.swedishepa.se/Documents/publikationer6400/978-91-620-67908.pdf?pid=21184.
SWRCB (State Water Resources Control Board). 2009. Order Granting Petitions for Reconsideration and Authorizing Issuance of a Revised Water Quality Certification. Order WR 2009-0039. June 16. Trout Unlimited, Friends of the River, Central Sierra Environmental Resource Center (TU et al.). 2004. Comments submitted for FERC/DEIS-0171D for the Stanislaus River Projects. December This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications.
Trussart, Serge, Danielle Messier, Vincent Roquet, and Shuichi Aki. 2002. “Hydropower projects: a review of most effective mitigation measures.” Energy Policy 30(14): 1251–1259.
DOI:10.1016/S0301-4215(02)00087-3. Ulibarri, Nicola. 2017. “Does Collaboration Affect the Duration of Environmental Permitting Processes?” Journal of Environmental Planning and Management 61(4): 617–634. https://www.researchgate.net/publication/317587223_Does_collaboration_affect_the_duration_o f_environmental_permitting_processes.
Uria-Martinez, Rocio, Megan Johnson, and Patrick O’Connor. 2018. 2017 Hydropower Market Report. Water Power Technologies Office, Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy. https://www.energy.gov/eere/water/downloads/2017-hydropowermarket-report.
Uria-Martinez, Rocio, Megan M. Johnson, and Rui Shan. 2020. “Challenges in the PostLicensing Stage of U.S. Hydropower Development: Current Status and Some Potential Solutions.” The Electricity Journal 33(4): 106729. https://www.sciencedirect.com/science/article/pii/S104061902030021X?via%3Dihub. U.S. Department of Energy. 2016. Hydropower Vision. Washington, DC: U.S. Department of Energy. https://www.energy.gov/eere/water/downloads/hydropower-vision-report-full-report.
USFS (U.S. Forest Service). 2003. “Forest Service Manual 2700 – Special Uses Management.” October 14, 2003. https://www.fs.fed.us/cgi-bin/Directives/get_dirs/fsm?2700!. U.S. Fish and Wildlife Service (USFWS). 1993. 340 FW 3, Rights-of-Way and Road Closing Policy. July 28, 1993. https://www.fws.gov/policy/340fw3.html.
USFWS. 2006a. Extension of Timeline for Formal Consultation Under the Endangered Species Act – Lewis River Hydroelectric Projects (FERC No. 935), Yale (FERC No. 2071), Swift No. 1 (FERC No. 2111), and Swift No. 2 (FERC No. 2213). Filed March 14, 2006.
USFWS. 2006b. Biological Opinion for the FERC Relicensing of the Lewis River Hydroelectric Projects: Merwin (No. 935), Yale (FERC No. 2071), Swift No. 1 (FERC No. 2111), and Swift No. 2 (FERC No. 2213). Filed September 15, 2006.
USFWS. 2006c. Extension of Timeline for Formal Consultation Under the Endangered Species Act – Lewis River Hydroelectric Projects (FERC No. 935), Yale (FERC No. 2071), Swift No. 1 (FERC No. 2111), and Swift No. 2 (FERC No. 2213). Filed June 12, 2006.
USFWS. 2011. FWS Response to Notice of Tendering of Application; Additional Study Requests for the Robert C. Byrd Hydroelectric Project. FERC No. 12796-004. Filed May 9, 2011.
USFWS (Nebraska Field Office). 2016. Loup River Hydroelectric Project (P-1256) Final Biological Opinion. December 16, 2016.
USFWS. 2017. Biological Opinion and Incidental Take Statement for the Fanshell (Cyprogenia stegaria), Pink Mucket Pearly Mussel (Lampsilis abrupta), Sheepnose (Plethobasus cyphyus), and This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Snuffbox (Epioblasma triquetra) for the Robert C. Byrd Hydroelectric Project and Navigation Channel Maintenance Dredging at the existing Robert C. Byrd Locks and Dam in Gallia County, Ohio and Mason County, West Virginia. City of Wadsworth, Ohio. Project no. 12796004. Filed June 17, 2017.
USFS. 2011. Forest Service Administration of Special Use Program. Audit Report 08601-55-SF. June 2011. https://www.usda.gov/sites/default/files/08601-55-SF.pdf.
USFS. 2015. Pinecrest Area Campground Improvements Conceptual Design Summary. http://pinecrestlakeupdate.com/images/uploads/Pinecrest_Area_Campgrounds_Conceptual_Desi gn_Summary.pdf. Vermont Agency of Natural Resources (VANR). 1995. Project no. 11475 – VT/NY Carver Falls Project Central Vermont Public Service. Filed November 8, 1995. Central Vermont Public Service Corporation. Project no. 11475-000.
VANR. 2002. Comments Recommendations Terms and Conditions Waterbury Project Number 2090-003 Green Mountain Power Corporation. Filed November 25, 2002. Green Mountain Power Corporation. Project no. 2090-003.
VANR. 2014. Draft Water Quality Certification Project Number 2090-003 Green Mountain Power Corporation. Issued December 11, 2014. Green Mountain Power Corporation. Project no. 2090-003. Wadsworth (The City of Wadsworth, Ohio). 2009. Notice of Intent to file an Application for Original License and Request for Designation as Non-Federal Representative; Request to use the Traditional Licensing Process (TLP); and Pre-Application Document (PAD) for the R.C. Byrd Hydroelectric Project no. 12796. June 16, 2009.
Wadsworth. 2010. Draft License Application for City of Wadsworth, Ohio. FERC Project no. 12796. November 2010.
Wadsworth. 2011. Application for License of a Major Project – Existing Dam Robert C. Byrd Hydroelectric Project no. 12796. Filed March 28, 2011.
Wadsworth. 2012. Section 401 Water Quality Certification (WQC) Application for RC Byrd Hydropower Project. October 18, 2012. Washington Department of Ecology. 2006. Section 401 Water Quality Certification for the Merwin Project (P-935). Filed October 9, 2006.
Water Authorities. 2019. “Water Management in Sweden.” Accessed December 18, 2019. https://www.vattenmyndigheterna.se/vattenforvaltning/vattenforvaltning-i-sverige.html.
West Coast Environmental Law Group. 2009. “Improving the Opportunities for Public Involvement in the Crown Land Tenure and Water License Approval Process for Run-of-River Electrical Generation Projects in British Columbia.” IPP Projects Series. https://www.wcel.org/sites/default/files/publications/IPP%20water%20license%20and%20land% 20leases.pdf. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. West Virginia Department of Environmental Protection. 2014. State 401 Water Quality Certification. City of Wadsworth, RC Byrd Hydroelectric Project, FERC License No. 12796, hydroelectric project at existing RC Locks and Dam, near Gallipolis Ferry, Mason County, WV. January 23, 2014. West Virginia Division of Natural Resources. 2011. Robert C. Byrd Hydroelectric Project, FERC no. P-12796, FERC notice of application tendered for filing with the Commission and soliciting additional study requests. Filed May 10, 2011. Wisconsin Department of Natural Resources. 2008. Badger-Rapide Croche Hydroelectric Project. Filed March 6, 2008. City of Kaukauna, Wisconsin. Project no. 2677-019. Wisconsin Department of Natural Resources. 2011. State Water Quality Certification for Badger-Rapide Croche, Hydropower FERC License Application (P-2677-019). Kaukauna
Utilities, Kaukauna, WI. Filed February 23, 2011. City of Kaukauna, Wisconsin. Project no. 2677-019. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. A N E X A M I N AT I O N O F T H E H Y D R O P O W E R L I C E N S I N G A N D F E D E R A L A U T H O R I Z AT I O N P R O C E S S A P PE NDIX Infrastructure Project Review: Environmental Impacts and Regulatory Approvals for Infrastructure Projects in the United States
U.S.C. § 1003; 43 C.F.R. § 3260.10). Geothermal Utilization Permits A geothermal project developer must obtain a site license and an approved utilization plan from the BLM prior to commencing construction of a utilization facility for commercial operations pursuant to the Geothermal Steam Act (30 U.S.C. § 1003; 43 C.F.R. § 3274.10; 43 C.F.R. § 3271.15). In addition, any geothermal project developer must obtain a commercial use permit approved by the BLM to sell the electricity pursuant to the Geothermal Steam Act of 1970 (30
FERC is the primary permitting authority that issues permits for interstate natural gas pipeline projects pursuant to the Natural Gas Act of 1938 (15 U.S.C. §§ 717-717z (1938)). The following permits are required for natural gas project construction and operation. Federal Energy Regulatory Commission Certificate of Public Convenience and Necessity An interstate natural gas pipeline developer must obtain a certificate of public convenience and necessity from FERC to sell or transport natural gas or construct, extend, acquire, or operate any such facility (15 U.S.C. § 717f(c)(1)(A)). The certificate of public convenience and necessity is effective so long as the applicant continues authorized operations (18 C.F.R. § 157.20).
FERC must determine that the proposed natural gas pipeline project is within the “public interest” to issue a certificate of public convenience and necessity. In making a public interest determination FERC must balance “the public benefit against the potential adverse "Interstate commerce" means commerce between any point in a State and any point outside thereof, or between points within the same State but through any place outside thereof, but only insofar as such commerce takes place within the United States (15 U.S.C. § 717a (7)) This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. consequences” of the proposed project by evaluating economic, public, and environmental factors, which include: Adverse impacts on potentially affected interests of the applicant’s (developer’s) existing customers, competing existing pipelines and their customers, landowners, and surrounding communities affected by the route of the new pipeline, which could include environmental impacts, private property impacts, and market demand impacts Public benefits of the proposed project Potential environmental impacts. (Certification of New Interstate Natural Gas Pipeline Facilities, 88 FERC ¶ 61,227 (1999), clarified, 90 FERC ¶ 61,128, further clarified, 92 FERC ¶ 61,094 (2000) (Certificate Policy Statement)).
Laboratory, Oak Ridge, TN. DOI: https://doi.org/10.21951/EHA_FY20.
DOI:10.1016/j.envsci.2016.03.019.