{"document":{"doc_id":191923,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Feasibility studies for novel and complex projects, Principles synthesised through an integrative review","date":"2022-08-31","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2022-0174-0032","source_native_id":"EPA-HQ-OLEM-2022-0174-0032","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2022-0174"],"rins":["RIN 2050-AH22"],"related":[{"doc_id":77718,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act; Safer Communities by Chemical Accident Prevention","date":"2022-08-31"},{"doc_id":84453,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Proposed Rule and RIA documents to OMB","date":"2022-08-31"},{"doc_id":84459,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis, Reconsideration of the 2017 Amendments to the Accidental Release Prevention Requirements:  Risk Management Programs Under the Clean Air Act. Section 112(r)(7)","date":"2022-08-31"},{"doc_id":84464,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis, December 16, 2016","date":"2022-08-31"},{"doc_id":84481,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Signed Proposed Rule - Preamble and Clean RIA","date":"2022-08-31"},{"doc_id":128435,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documents - Passback on 2nd Round Reviews to OMB","date":"2022-08-31"},{"doc_id":128436,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Passback on 3rd Round Reviews to OMB","date":"2022-08-31"},{"doc_id":128437,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Passback on 4th Round Reviews sent to OMB","date":"2022-08-31"},{"doc_id":174501,"source":"docket_item","org":"EPA","doc_type":"report","title":"Department of Justice: Assessment of the Increased Risk of Terrorist or Other Criminal Activity Associated with Posting Off-Site Consequence Analysis Information on the Internet","date":"2022-08-31"},{"doc_id":174502,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Background Document for Notice of Proposed Rulemaking: Risk Management Programs Under the Clean Air Act, Section 112(r)(7) Safer Communities by Chemical Accident Prevention","date":"2022-08-31"},{"doc_id":174503,"source":"docket_item","org":"EPA","doc_type":"report","title":"2021 RMP Virtual Public Listening Sessions and Request for Comment Excerpt-by-Issue Report of Substantive Submissions","date":"2022-08-31"},{"doc_id":174504,"source":"docket_item","org":"EPA","doc_type":"report","title":"Assessment of the Incentives Created by Public Disclosure of Off-site Consequence Analysis Information for Reduction in the Risk of Accidental Releases","date":"2022-08-31"},{"doc_id":174509,"source":"docket_item","org":"EPA","doc_type":"report","title":"RMP Proposed Rule Documents uploaded into ROCIS","date":"2022-08-31"},{"doc_id":174511,"source":"docket_item","org":"EPA","doc_type":"report","title":"Emergent Risks and Key Vulnerabilities; Fifth Assessment Report of the Intergovernmental Panel on Climate Change","date":"2022-08-31"},{"doc_id":174512,"source":"docket_item","org":"EPA","doc_type":"report","title":"Human Health: Impacts, Adaptation, and Co-Benefits; Fifth Assessment Report of the Intergovernmental Panel on Climate Change","date":"2022-08-31"},{"doc_id":174513,"source":"docket_item","org":"EPA","doc_type":"report","title":"OSWER Environmental Justice Task Force Draft Final Report","date":"2022-08-31"},{"doc_id":174514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Food Security and Food Production Systems; Fifth Assessment Report of the Intergovernmental Panel on Climate Change","date":"2022-08-31"},{"doc_id":174516,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Background Document for Final RMP Reconsideration Rule Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2022-08-31"},{"doc_id":174517,"source":"docket_item","org":"EPA","doc_type":"report","title":"RMP late accident reporting analysis steps","date":"2022-08-31"},{"doc_id":174522,"source":"docket_item","org":"EPA","doc_type":"report","title":"U.S. Global Change Research Program 2018 - Fourth National Climate Assessment: Volume II - Impacts, Risks, and Adaptation in the United States","date":"2022-08-31"},{"doc_id":191926,"source":"docket_item","org":"EPA","doc_type":"publication","title":"61 FR 31668 Accidental Release Prevention Requirements: Risk Management Programs Under Clean Air Act Section 112(r)(7)","date":"2022-08-31"},{"doc_id":191930,"source":"docket_item","org":"EPA","doc_type":"publication","title":"58 FR 54190 Risk Management Programs for Chemical Accidental Release Prevention","date":"2022-08-31"},{"doc_id":191931,"source":"docket_item","org":"EPA","doc_type":"publication","title":"83 FR 24850 Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act","date":"2022-08-31"},{"doc_id":191932,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Handbook on Valuing Changes in Time Use Induced by Regulatory Requirements and Other EPA Actions","date":"2022-08-31"},{"doc_id":191937,"source":"docket_item","org":"EPA","doc_type":"publication","title":"81 FR 13638 Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act","date":"2022-08-31"},{"doc_id":191939,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Recommendations for improving public engagement with pre-incident information materials for initial response to a chemical, biological, radiological or nuclear (CBRN) incident: A systematic review","date":"2022-08-31"},{"doc_id":191941,"source":"docket_item","org":"EPA","doc_type":"publication","title":"The Dynamics of House Price Responsiveness and Locational Sorting: Evidence from Air Quality Changes","date":"2022-08-31"},{"doc_id":191942,"source":"docket_item","org":"EPA","doc_type":"publication","title":"The Dynamics of House Price Responsiveness and Locational Sorting: Evidence from Air Quality Changes","date":"2022-08-31"},{"doc_id":191943,"source":"docket_item","org":"EPA","doc_type":"publication","title":"78 FR 20423 Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Revisions to Safety and Environmental Management Systems","date":"2022-08-31"},{"doc_id":205326,"source":"docket_item","org":"EPA","doc_type":"other","title":"Federal Communications Commission v. Fox Television Stations, Inc.,","date":"2022-08-31"},{"doc_id":205327,"source":"docket_item","org":"EPA","doc_type":"other","title":"June 16, 2021 Virtual RMP Listening Session Zoom Captioned Transcript","date":"2022-08-31"},{"doc_id":205328,"source":"docket_item","org":"EPA","doc_type":"other","title":"IIAR 9-2020 Section 7.3.12","date":"2022-08-31"},{"doc_id":205329,"source":"docket_item","org":"EPA","doc_type":"other","title":"Chemical Safety Board Safety Digest: The Importance of Worker Participation","date":"2022-08-31"},{"doc_id":205330,"source":"docket_item","org":"EPA","doc_type":"other","title":"IIAR 9-2020 Section 7.4.7.2","date":"2022-08-31"},{"doc_id":205331,"source":"docket_item","org":"EPA","doc_type":"other","title":"Instructions on how to receive the RMP database used in this Proposed Rule","date":"2022-08-31"},{"doc_id":205332,"source":"docket_item","org":"EPA","doc_type":"other","title":"40 CFR 68.67 (up to date as of 7-20-2022)","date":"2022-08-31"},{"doc_id":205333,"source":"docket_item","org":"EPA","doc_type":"other","title":"The Use and Abuse of Feasibility Studies","date":"2022-08-31"},{"doc_id":205334,"source":"docket_item","org":"EPA","doc_type":"other","title":"Preventing \"Double Disasters\"","date":"2022-08-31"},{"doc_id":205335,"source":"docket_item","org":"EPA","doc_type":"other","title":"40 CFR Part 68 Subpart C (up to date as of 7-20-2022)","date":"2022-08-31"},{"doc_id":205336,"source":"docket_item","org":"EPA","doc_type":"other","title":"Lower costs for converting alkylation units from hydrofluoric to sulfuric acid","date":"2022-08-31"},{"doc_id":205337,"source":"docket_item","org":"EPA","doc_type":"other","title":"Natural Hazards and Technological Disasters (Appendix B); Technical Background Document for Notice of Proposed Rulemaking: Risk Management Programs Under the Clean Air Act, Section 112(r)(7) Safer Communities by Chemical Accident Prevention","date":"2022-08-31"},{"doc_id":205338,"source":"docket_item","org":"EPA","doc_type":"other","title":"CCPS Guidelines for Investigating Incidents, 2019; Root cause and causal factor definitions","date":"2022-08-31"},{"doc_id":205339,"source":"docket_item","org":"EPA","doc_type":"other","title":"CCPS Guidelines for Investigating Incidents, 2019; Investigative Tools","date":"2022-08-31"},{"doc_id":205340,"source":"docket_item","org":"EPA","doc_type":"other","title":"July 08, 2021 Virtual RMP Listening Session Zoom Captioned Transcript","date":"2022-08-31"},{"doc_id":205341,"source":"docket_item","org":"EPA","doc_type":"other","title":"Environmental Health Risks and Housing Values: Evidence from 1600 Toxic Plant Openings and Closings","date":"2022-08-31"},{"doc_id":205342,"source":"docket_item","org":"EPA","doc_type":"other","title":"1996 RMP Final Rule Response to Comments excerpt","date":"2022-08-31"},{"doc_id":205343,"source":"docket_item","org":"EPA","doc_type":"other","title":"Motor Vehicle Manufacturers. Association of the United States, Inc. v. State Farm Mutual Automobile Ins. Co.","date":"2022-08-31"},{"doc_id":204743,"source":"docket_item","org":"EPA","doc_type":"other","title":"SCCAP RMP Public Hearing Transcript September 27, 2022","date":"2022-10-21"},{"doc_id":204744,"source":"docket_item","org":"EPA","doc_type":"other","title":"SCCAP RMP Public Hearing Transcript September 26, 2022","date":"2022-10-21"},{"doc_id":204673,"source":"docket_item","org":"EPA","doc_type":"other","title":"SCCAP RMP Public Hearing Transcript September 28, 2022","date":"2022-10-26"},{"doc_id":77709,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act; Safer Communities by Chemical Accident Prevention","date":"2024-03-11"},{"doc_id":84487,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"The economic impacts of learning losses","date":"2024-03-11"},{"doc_id":127841,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"5766.6 SCCAP RMP Accounting for Economic-significant Final Rule 20230912","date":"2024-03-11"},{"doc_id":127842,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Combined IA Comments RMP SCCAP Final Preamble and Rule - EPA Responses 112123","date":"2024-03-11"},{"doc_id":127843,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"R3 IA Comments RMP SCCAP Final Rule Preamble 1.30.24","date":"2024-03-11"},{"doc_id":127844,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Clean OMB 3rd Passback RMP SCCAP Final Rule Preamble 1.30.24","date":"2024-03-11"},{"doc_id":127845,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"5766.6-02-OLEM 2050-AH22 Clean CAA RMP Safer Communities by Chemical Accident Prevention Final Preamble and Rule 20240215 EO12866 Cleara","date":"2024-03-11"},{"doc_id":127846,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"5766.6 RMP SCCAP Final Preamble and Rule 20230920 EO12866 Initiated","date":"2024-03-11"},{"doc_id":167292,"source":"docket_item","org":"EPA","doc_type":"report","title":"Popcorn Polymer Accumulation, Pipe Rupture, Explosions, and Fires at TPC Group Chemical Plant Butadiene Unit; US CSB, 2022","date":"2024-03-11"},{"doc_id":167293,"source":"docket_item","org":"EPA","doc_type":"report","title":"RMP facilities in PHA accident change analysis","date":"2024-03-11"}],"references":[{"citation_id":1985291,"raw_reference":"Castrogiovanni, 1996) or experimental selectionism (Loch et al, 2008, 2011 )? At Implementation At Operation and Beyond Undertake investigations and discover knowledge to answer Research Questions (Principles 1, 4, 6) Source: Author, see also Winch and Leiringer (2016). An organisation' s capability to be realistic about its capabilities is hence criti cal for an accurate feasibility appraisal (de! Caiio, 1992; Meier, 2008). Project owners running novel and complex projects must be disciplined in seeking and accepting bad news to inform realistic decision-making (Lovallo and Kahneman, 2003; Stoelsnesa, 2007).","cited_authors":"Castrogiovanni","cited_year":"1996","cited_title":"or experimental selectionism (Loch et al, 2008, 2011 )?","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985292,"raw_reference":"Therefore, project owners wi th low organisational maturity or highly rigid processes may benefit from separating study teams working on the early stage of highly creative and divergent projects from the organisation's hierarchy (Lenfle, 2014). How an organisation utilizes feasibility studies as part of a broader system of knowledge development, capacity-building, and portfolio management is an essential attribute of organisational capacity (Loch et al., 2011; Pinto, 2014; Winch and","cited_authors":"Therefore, project owners wi th low organisational maturity or highly rigid processes may benefit from separating study teams working on the early stage of highly creative and divergent projects from the organisation's hierarchy (Lenfle","cited_year":"2014","cited_title":"How an organisation utilizes feasibility studies as part of a broader system of knowledge development, capacity-building, and portfolio management is an essential attribute of organisational capacity (Loch et al., 2011; Pinto, 2014; Winch and","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985293,"raw_reference":"Leiringer, 2016). Identified/ Known to self Known Knowns ) , (A nswers) Unidentified/ Unknown to self Capture internal knowledge to answer Research Questions Known Unknowns (Questions) ), Unknown Knowns Unkno wn Unkno wns (Hidden answers) (Hidden questions) Certain Uncertain Discover and understand uncertainty to define Research Questions (Principles 1, 2, 7) (Principles 3, S) Fig. 1. Question (uncertainty) and answer (knowledge) identification in feasibility studies. Source: Author; see also Table 3. Note: Epistemic uncertainty impacts each of the quadrants. 3.6. Pri11ciple 6: reporti11g results through a sta11dard view Since it is vital to benchmark study elements (Principle 1), S. McLeod Project Leadership and Society 2 (2021) 100022 considering inputs from stakeholders (Principle 4), and reviewing the available evidence for reference class projects (Principle 4), feasibility study results should be presented through available reporting frameworks. Reporting results against standard frameworks is an increasingly mandated mechanism for providing clarity and transparency of findings - thereby supporting the confid ence of those making decisions from them (Ferguson et al., 2013). Reflecting this principle, many mature client organisations have defined feasibility study frameworks (Logan and Jackson, 2016). Clients and consulting firm s may similarly have standardized specifications for types of feasibility study they commission or deliver (Mackenzie and","cited_authors":"Leiringer","cited_year":"2016","cited_title":"Identified/ Known to self Known Knowns ) , (A nswers) Unidentified/ Unknown to self Capture internal knowledge to answer Research Questions Known Unknowns (Questions) ), Unknown Knowns Unkno wn Unkno wns (Hidden answers) (Hidden questions) Certain Uncertain Discover and understand uncertainty to define Research Questions (Principles 1, 2, 7) (Principles 3, S) Fig","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985294,"raw_reference":"Cusworth, 2007, p. 7; see also Table 3). Governments have also developed frameworks and standards for front end project \"quality at entry\" assessments, such as the UK \"Gateway O\" and Norwegian QA Scheme (Olsson and Magnussen, 2008; Willian1s and Samset, 2010, p. 39).","cited_authors":"Cusworth","cited_year":"2007","cited_title":"quality at entry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985295,"raw_reference":"Similarly, due to their significant capital market implications, there are standard mining feasibility disclosure standards, such as Canada's NI 43-101, and JORC in Australia (Sahu, 2014). Through an ex-post review of Australian mining feasibility announcements to the Australian Stock","cited_authors":"Similarly, due to their significant capital market implications, there are standard mining feasibility disclosure standards, such as Canada's NI 43-101, and JORC in Australia (Sahu","cited_year":"2014","cited_title":"Through an ex-post review of Australian mining feasibility announcements to the Australian Stock","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985296,"raw_reference":"Lenfle, 2014; Turner and Cochrane, 1993). This review yields three signifi cant insights for project leaders.","cited_authors":"Lenfle, 2014; Turner and Cochrane","cited_year":"1993","cited_title":"This review yields three signifi cant insights for project leaders","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985297,"raw_reference":"Firstly, the weight of literature supports the general premise that organisations may benefit from carefully applying concepts in management and uncertainty theory to mitigate the inherent challenges that accompany the study of novel projects. While such management may diverge from traditional rigid project management, it may still be informed by increasingly mature bodies of knowledge, including agile methods (Lenfle, 2014; Loch et al., 2011 ; PMI and Agile Alliance, 2017). By exploring this interdisciplinary literature, this paper has synthesised seven novel principles for doing so.","cited_authors":"Firstly, the weight of literature supports the general premise that organisations may benefit from carefully applying concepts in management and uncertainty theory to mitigate the inherent challenges that accompany the study of novel projects. While such management may diverge from traditional rigid project management, it may still be informed by increasingly mature bodies of knowledge, including agile methods (Lenfle, 2014; Loch et al., 2011 ; PMI and Agile Alliance","cited_year":"2017","cited_title":"By exploring this interdisciplinary literature, this paper has synthesised seven novel principles for doing so","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1985298,"raw_reference":"Thirdly, these challenges themselves point to fundamental difficulties in the interface of project management research and practice. Feasibility studies - particularly for proprietary or secretive novel projects - are illusive objects for academic study. The dissemination of the original, grounded case study research that tes ts and extends theory such as tl1e works by Hopfensperger (2007) and Meier (2008) - depends on a degree of personal access to complex projects, which may be 3.7. Pri11ciple 7: the long-tem1 life cycle view A feasibility study is developed at a fixed point in time, though it must consider factors that may be realized over the full project life cycle. Projects or programs with long durations (for instance, longer than two years) will inevitably exist within a changing contextual environment (Lucae et al., 2014). Therefore, taking a long view is an essential part of assessing a proposal's resilience and robustness against dynamic external forces and trends (Bazernian and Chugh, 2006; Logan and","cited_authors":"Thirdly, these challenges themselves point to fundamental difficulties in the interface of project management research and practice. Feasibility studies - particularly for proprietary or secretive novel projects - are illusive objects for academic study. The dissemination of the original, grounded case study research that tes ts and extends theory such as tl1e works by Hopfensperger","cited_year":"2007","cited_title":"and Meier (2008) - depends on a degree of personal access to complex projects, which may be 3.7","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}